Search Documents

  • SME
    Pitfalls And Lessons Learned In Pump Station Construction

    By Steven R. Lowe

    Construction of a pump station, consisting of an inlet chamber, wet well and pump chamber, required excavation to a depth of 9.7 m (32 ft) below ground surface and more than 7.6 m (25 ft) below the gr

    Jan 1, 2011

  • NIOSH
    OFR-29(2)-82 Visual Attention Locations For Operating Continuous Miners, Shuttle Cars, And Scoops: A Summary

    By Mark S. Sanders

    This report presents a summary of the work reported by Sanders and Kelley (1981). A task analytic approach was used to define information requirements and visual features which served as sources of in

    Jan 1, 1981

  • CIM
    The Application of Large Scale Stirred Milling to the Retreatment of Merensky Platinum Tailings

    By Stephan Buys, Dan Curry, Chris Rule

    "The use of fine grinding (FG) in mineral processing is well established. The application of FG in the South African platinum industry is more recent and it’s use in the recovery of PGM’s from dormant

    Jan 1, 2005

  • SME
    Big Walnut Outfall Augmentation Sewer?Part II: Tbm Case History

    By Tom Szaraz

    Part of a major sewer expansion for the City of Columbus, Ohio. The Big Walnut Outfall Augmentation Sewer?Part II (BWOAS) consists of 13,200 feet of tunnel of 12-foot tunnel passing mainly through gla

  • AUSIMM
    Some Methods of Estimating Quantities, as Applied to Dams, Dumps, Etc.

    FREQUENTLY the Survey Department is caIled upon to estimate the quantity of material in various dumps, dams piles, etc... and in the carrying out of this work various methods may be employed.The metho

    Jan 1, 1925

  • SME
    Filtered Air Supply System Reduces Roof Bolter Operators? Exposure To Respirable Dust

    The National Institute for Occupational Safety and Health (NIOSH) conducted a study to determine the effectiveness of a filtered air delivery system to reduce respirable dust exposure to roof bolter o

    Jan 1, 2012

  • SME
    Underground Caving Shield Change Outs At Us Steel’s Oak Grove Mine

    By B. Weyerman

    U. S. Steel's Oak Grove Mine experienced several top hinge failures on their caving shields. It was determined that all the caving shields needed to be replaced with new caving shields before mor

    Jan 1, 2001

  • AUSIMM
    Estimating the Cost of a Feasibility Study for a Mining Project

    The cost of preparing a feasibility study is notoriously difficult to estimate. Studies for mining projects are typically commenced when an exploration programme has identified a mineable resource a

    Jan 1, 1990

  • SME
    Development of Steel-Fiber Reinforced High Fluidity Concrete Segment and Application to Construction

    By Aki Fujii, Hiroshi Dobashi, Mitsuro Matsuda, Yoshinari Kondo

    INTRODUCTION The Metropolitan Expressway Central Circular Route with a total length of approximately 47 km is located outside the Inner Circular Route of Tokyo (at a radius of approximately 8 km f

    Jan 1, 2007

  • SAIMM
    The Use Of Titanium Hydride In Blending And Mechanical Alloying Of Ti-Al Alloys - Synopsis

    By I. A. Mwamba

    Titanium sponge, which is almost pure titanium, is extremely ductile and not easily processed into titanium powder. One method of producing powder is the hydride-dehydride (HDH) process, where titaniu

    Jan 1, 2011

  • AUSIMM
    Pressure Leaching of Mixed Cobalt-Nickel Sulphides

    By Dyson N. F

    Mixed cobalt-nickel sulphides precipitated from ammoniacal process liquors derived from nickel sulphide concentrates, mattes, and reduced nickeliferous laterites have been characterized.The mixed sulp

    Jan 1, 1981

  • ISEE
    The Effect of Fragmentation on Loader Productivity

    By Michael D. McGill

    The effect of fragmentation size distribution as it relates to front end loader productivity was evaluated by comparing loader cycle times to fragmentation size of the shot rock. At Gold Mine in Sout

    Jan 1, 1994

  • NIOSH
    IC 8123 Aluminum Fabrication In The Pacific Northwest: An Economic Survey ? Summary

    By Frank B. Fulkerson

    Of the about 60 million pounds of aluminum used in the Pacific Northwest in 1960, 40 million pounds or two-thirds was used by 10 companies. One of these companies made airplanes and missiles; one manu

    Jan 1, 1962

  • AUSIMM
    Improving Pelletisation of Pyrite Cinder by High Pressure Roller Grinding

    Improving Pelletisation of Pyrite Cinder by High Pressure Roller Grinding As an important secondary resource for ironmaking, pyrite cinder is characterised by coarse particle size, low specific surfa

    Sep 13, 2010

  • SME
    Evolution Of Sag Mill Shell Liner Design At Kennecott Utah Copper’s Copperton Concentrator

    By D. W. Partridge, W. Lamb, A. E. Lamb, S. Bird

    Due to the constant need to improve SAG mill performance and efficiency, extensive research into all aspects of SAG mill optimization has been performed. This paper will review the current evolution

    Jan 1, 2002

  • AUSIMM
    The Determination of Certain Curves and Their Application to the Desilverisation of Lead by the Parkes Process

    WHILE in the employ of the Broken Hill Associated Smelters and the Electrolytic Zinc Oompanies at their South Melbourne Research Station, the writer was detailed to investigate the principles underlyi

    Jan 1, 1925

  • CIM
    Western Mines- Myra, Lynx and Price deposits

    By R. H. Seraphim

    "Western Mines Limited produces gold, silver, copper, lead and zinc from a number of Paleozoic volcanogenic deposits near Buttle Lake on Vancouver Island. The deposits were emplaced along a series of

    Jan 1, 1980

  • AIME
    Iron and Steel Division - Cr2O3 as a Foaming Agent in CaO-SiO2 Slags

    By J. H. Swisher

    An experimental study has been made of the possible mechanisms for foam stability in the system CaO-SiO2-Cr2O3, where Cr2O3is the foaming agent. The degree of lowering of surface tension by Cr2O3 was

    Jan 1, 1964

  • SME-ICGCM
    Nonlinear Approach For Determining Design Criteria For Yield Pillar Performance

    By W. Smith

    The U.S. Bureau of Mines (USBM) is using laboratory and computer-based techniques to investigate the post- failure behavior of yielding pillars and pillar reinforcement techniques to control entry def

    Jan 1, 1995

  • CIM
    The Performance of Mesh, Shotcrete and Membranes for Surface Ground Support

    By E. C. Morton

    The Western Australian School of Mines (WASM) has developed a facility for the static testing of large scale ground support elements. The samples are loaded using a mechanical screw feed jack. Instrum

    May 1, 2009