Search Documents

  • SME
    Multi-Gravity Separator: An Alternate Gravity Concentrator To Process Coal Fines

    By A. K. Majumder

    The multi-gravity separator (MGS) is a novel piece of equipment for the separation of fine and ultra-fine minerals. However, the published literature does not demonstrate its use in the separation of

    Jan 1, 2007

  • CIM
    Water Control Technology Innovative Solutions for Underground Mines

    By Peter White

    Mine Planning Shaft Collar Shaft Sinking Raises Ramp Underground Water Storage

    May 1, 2009

  • SME-ICGCM
    Top Coal Failure Mechanism Of Extremely Thick Seam In Top Coal Caving Mining (b4774a45-fd0f-4916-8ea9-0dac0bf96077)

    By Nan Hua

    As a high production and high efficient mining method, top coal caving method is now widely used in China. However, as more extra-thick coal seams are mined, it becomes more and more difficult to make

    Jan 1, 2009

  • ISEE
    Presplitting and Controlled Blasting Techniques

    The objective in control blasting is to reduce overbreak to control the final pit wall slope, shaft, drift, ditch, bench, etc. to the final planned excavation limit.

    Jan 1, 1990

  • AUSIMM
    Pilot Tests for Heavy Metals Removal in Mine Water

    By M Vendrup, T C. Christensen, C Dube

    The adsorptive and granulate forming MetClean™ process has been used at many locations in Northern Sweden, Norway, Denmark, France, Spain, Mongolia, Japan and Australia. It has been pilot tested and u

    Sep 7, 2015

  • SME
    Feasibility Study on the Modification and Improvement of Flotation Circuits at Enrichment Plant 2 of the Sarcheshmeh Copper Complex Mining, Metallurgy and Exploration (5b85b197-36d7-44cc-879d-d3b823248b9d)

    By Bijan Taheri, Behrouz Maghsodi, Monireh Heshami, Reza Kohan

    A common problem recently encountered with the increase in the rate of input feed at Enrichment Plant 2 of the Sarcheshmeh Copper Complex is the loss of value to the tails, translating to lower recove

  • ISEE
    Blasting Overhangs Close to a Vibration Sensitive Structure

    By R. Franfield

    This paper describes a situation that many drilling and blasting contractors have found themselves in – a client?s fear of the use of explosives. In the summer of 2007 Blasting Services Ltd was asked

    Jan 1, 2009

  • TMS
    Studying Solvent Extraction Settler Process By Using CFD

    By Timo Kankaanpää

    Keywords: Solvent extraction, dispersion, phase separation, CFD The liquid-liquid dispersion phases are separated by gravity in a solvent extraction settler. This separation step is made more effec

    Jan 1, 2005

  • TMS
    The Morphology Control Of Cobalt Compounds And Co3O4 Powder Produced By Homogeneous Precipitation Process

    By Chen Song

    Keywords: Co3O4, Cobalt Compounds, Morphology, Urea, Homogeneous Precipitation Depending on experimental condition, precipitation from cobalt nitrate and chloride solution in the presence of urea

    Jan 1, 2005

  • SME
    Ground-Penetrating Radar for Karst Detection in Underground Stone Mines Mining, Metallurgy and Exploration (af91ef88-58ad-45be-8f21-58666827bf43)

    By Jonathan Baggett, Nino Ripepi, Amin Abbasi, Richard Bishop, Juan Monsalve, John Hole

    This work focuses on the operational and safety issues associated with karst voids in large opening underground mines. Issues include water inrush, structural instability, and engineering uncertainty

  • CIM
    Design, Construction, and Start-up of Stillwater Mining’s East Boulder Concentrator

    By P. Lefebvre, J. Sargent, K. Major, B. Darnton

    "Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin

    Jan 1, 2003

  • ISEE
    Investigation into Monitoring of Initiator Performance

    By Charles Deacon

    The mining industry is constantly taking greater cognisance of their operating costs as a strategy to counter the effects of falling commodity prices. As a result, optimal operating efficiency is more

    Jan 1, 2000

  • SME
    The Lake Mead Intake 3 Water Tunnel and Pumping Station, Las Vegas, Nevada, USA

    By Michael Feroz, Marcus Jensen, James E. Lindell

    The Southern Nevada Water Authority (SNWA) operates two water-intakes in Lake Mead, located 20 miles east of Las Vegas, Nevada. Severe drought has caused decline in lake level by 85 feet since 2000 an

    Jan 1, 2007

  • DFI
    Special Foundation Construction For Large Deep Excavation Pits In Berlin - Summary:

    By Wolfgang G. Brunner

    The center of Berlin is currently a huge jobsite, where international architects, designers, consultants, construction and ground engineers as well as investors take on the challenge of the biggest an

    Jan 1, 1999

  • IIMP
    Caracteristicas estructurales y estratigraficas de los yacimientos epitermales de baja sulfuracion en el corredor estructural San pablo - Porculla

    By José Antonio Enríquez

    El presente texto describe las características estructurales y estratigráficas de los yacimientos epitermales de baja sulfuración en el corredor estructural de San Pablo en Porculla, Cajamarca. En est

    Sep 12, 2005

  • DFI
    Evaluation Of A New P-y Analysis Tool For Lateral Analysis Of Drilled Shafts Using Load Tests In Nevada

    By David H. Sanders, Ramin Motamed, Fahim M. Bhuiyan, Raj V. Siddharthan

    Large-diameter drilled shafts (DS) are a critical part of a seismic-resistant system, and therefore it is important to be able to accurately model lateral resistance. To undertake the lateral load ana

  • DFI
    A Brand New Barrier Wall Installed at Wolf Creek Dam

    By Maurizio Siepi, Fabio Santillan, Lyndon Bedford, Carlo Crippa

    "Abstract: Wolf Creek dam, on the Cumberland River in Kentucky, US, operated and maintained by the Nashville District of the USACE, is the Corps' largest reservoir east of the Mississippi river. The 1

    Jan 1, 2014

  • IIMP
    La mineragrafía: una importante arma de apoyo para la flotación

    By Luis Angel De Montreuil

    Ante el problema del tratamiento de minerales complejos, la demanda de eficiencia metalúrgica y bajos costos de operación, el ingeniero busca el apoyo de la mineragrafía como estudio microscópico de l

    Jan 1, 1986

  • SME
    Oilwell Cementing: What Is Next?

    By A. Mahmoudkhani

    Primary cementing is the process of placing cement in the annulus between the casing and the formations exposed to the wellbore. Portland cement was first used in 1903 in the Lopoc Field in California

    Jan 1, 2012

  • AIME
    Coal - Coal Strip Mining-Is It Reaching a Peak?

    By Hubert E. Risser

    Although, for about a half-century the percentage of coal production provided through strip mining has steadily increased, recent trends indicate that a peak in percentage (not tonnage) is being appro

    Jan 1, 1970