Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    The Bucketwhell Stacker/Reclaimer For Handling Systems And Preparation Plants

    By James W. Collins

    The bucketwheel stacker/reclaimer is suited for a variety of bulk material handling systems, especially those operating with stockpiles in excess of 30,000 tons. The bucketwheel stacker/reclaimer, a

    Jan 1, 1973

  • SME
    Utilization of statistical analysis to identify influential slope parameters associated with rockfall at openpit mines

    By Jorge Armstrong, Sean Warren, JOSEF BOURGEOIS

    The paper investigates the influence of slope height, slope angle, slope material, and rock size on rockfall runout distance in openpit mines. Using statistical analysis and simulation, the study aims

    Oct 1, 2023

  • SME
    State Of Illinois Incentive Programs For Coal And Energy Development

    By M. P. Murphy

    The state of Illinois is committed to direct support of the Illinois coal industry. The Illinois Department of Commerce and Community Affairs’(DCCA) Office of Coal Development (OCD) provides incentiv

    Jan 1, 2003

  • SME
    Silanes and Other Silane-like Surface Treatments for Inorganic Fillers

    By J. J. Kellar, W. M. Cross, H. Du, C. D. Struckman, D. A. Boyles

    Silane coupling agents have been used in the filler industry for years. One particularly unique feature is the ability of the coupling agents to enhance the adhesion between filler and polymer matrice

    Jan 1, 2003

  • SME
    Evaluation of Contamination Ingress for Built-in-Place Refuge Alternatives

    By L. Yan, T. Lutz, J. Noll

    "Mine disasters, such as fires and explosions, can create a hazardous atmosphere due to the generation of carbon monoxide (CO). After a mine disaster, contaminated mine air can enter the refuge altern

    Jan 1, 2018

  • SME
    A Computer-Based Hazard-Awareness Assessment Program For Surface Mines

    By D. A. Poukhovski

    Two integral components of the 30 CFR 48 training requirements mandated for new miners, newly employed experienced miners, and the annual refresher training of all miners are hazard recognition and pr

    Jan 1, 1997

  • SME
    A New Method for the Arresting of Underground Tunnel Explosions

    By I. G. Ediz, D. W. Dixon, W. M. Fidler

    In this paper a new method for the arresting of tunnel explosions is presented. In the proposed technique, the on coming explosion is detected by a pressure sensitive device by a pre-determined rise i

    Jan 1, 1995

  • SME
    Statement Of Principles National Institute For Occupational Safety And Health

    By Roy M. Fleming

    During the decade of the 1970's, a new emphasis was placed on assuring a safe and healthful workplace for all American workers. Much of the basis for this national effort was federal legislation:

    Jan 1, 1981

  • SME
    Managing Tailings Influenced Ground Water at the Butte Superfund Site

    By R. D. Williams

    "In a very real sense, Butte, MT is where the copper came from that won two world wars. The price for that unrestricted mining and smelting of copper came due in 1983 when Butte was declared a Superfu

    Apr 1, 2019

  • SME
    Optimum Duration For Bioheap Pretreatment Of Refractory Sulfidic Gold Ores

    By Robert W. Bartlett

    Pretreatment of sulfidic refractory gold ore by biooxidation in coarse-crushed ore heaps is a promising new technology, especially for low-grade ores that cannot afford pressure leaching or roasting.

    Jan 1, 1995

  • SME
    Computer-aided mapping and design — Their potential for mining use

    By Kim W. Wright

    Introduction Mining operations require maps for each phase of project development. Engineering plans, cross-sections, and isometric drawings are also needed. Maps are used for geologic interpretation

    Jan 6, 1985

  • SME
    Use Of A Magnetic Fluid-Based Process For Coal Separations

    By M. S. Klima, M. Fofana

    The use of a laboratory-scale magnetic fluid-based separator for coal separations was examined. A Frantz laboratory magnetic separator was modified by fabricating new pole pieces of the appropriate ge

    Jan 1, 1998

  • SME
    Meeting The U.S. Minerals And Metal Needs For Energy Production

    ?Energy-related systems: wind, solar, electric are typically materials intensive. As new technologies are widely deployed, significant quantities of the elements required to manufacture them will be

    Jan 1, 2012

  • SME
    Educational Requirements for Micro- and Macro-Engineering in Mineral Processing

    By A. A. Mular

    Examining a typical curriculum for mineral process engineers shows that traditional subjects remain important, namely, engineering, earth and basic sciences, mathematics and mineral proc¬essing techno

    Jan 1, 1992

  • SME
    Agent-Based Optimization for Truck Dispatching in Open-Pit Mines

    By V. A. Temeng, M. Owusu-Tweneboah, K. Awuah-Offei

    The mining industry has long recognized the value of dispatch systems in open pit mines as they reduce load and haul costs. Over the years, researchers have proposed many dispatch systems with various

    Jan 1, 2019

  • SME
    The Micro-computer Assistant Analysis Methods for Mine Ventilation Networks

    By Xinming Lu

    In this paper, we use a new kind of fan charateristic curve instead of the common quadratic function, and give the existence and the uniqueness of the solutions to the ventilation network controlling

    Jan 1, 1991

  • SME
    Graphical Technique For Rapid Comparison Of Mine Ventilation Network Analyses

    By Andrzej Wala, Waclaw Dziurzynski, Janusz Tracz

    Recent advancements in computer hardware have led to the development of new ventilation planning software for PC's. These programs now can be run more quickly and can display their outputs with g

    Jan 1, 1991

  • SME
    The Need for Mechanization of Cable Handling Behind Continuous Miners

    By B. Stewart, J. R. Warneke

    The productivity of underground mines has increased dramatically since the introduction of continuous miners. A variety of new hazards have developed as a result. In the spring of 2004, Mine Health

    Jan 1, 2006

  • SME
    Urban Costs: Owner's Viewpoint

    By James F. Fraser

    Construction of a major linear project in any environment is difficult, at best. Construction of a major linear project which includes major subway elements, both cut and cover and tunneling, in the c

    Jan 1, 1979

  • SME
    Technical and Economic Evaluations of Mining Projects for Bank Financing

    By Peter H. Grimley

    It is important to realize that lending institutions have a very different risk-profile from that of an equity investor. For bank financing, a feasibility study must address the concerns of the lender

    Jan 1, 1988