Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SAIMM
    The Dual-Electrode DC Arc Furnace ? Modelling Insights

    By Q. G. Reynolds

    Keywords: Pyrometallurgy, furnace, DC, reverse polarity, dual-electrode The dual-electrode direct current (DC) arc furnace uses two graphite electrodes, one connected as cathode, and one as anode.

    Jan 1, 2011

  • SAIMM
    PlatinumII/IV And RhodiumIII Chemistry Viewed Through New Eyes: What New Secrets Can 195Pt And 103Rh NMR Spectroscopy Reveal About Speciation As Relevant To Refining Solutions?

    By K. R. Koch

    Although some of the platinum(II/IV) and rhodium(III) chemistry is considered ?old? and well-known, the application of modern multinuclear NMR spectroscopic methods to this chemistry in solution revea

    Jan 1, 2012

  • SAIMM
    DC Arc Smelting Of Silicon: Is It Technically Feasible?

    By M. Abdellatif

    Keywords: Pyrometallurgy, furnace, DC arc furnace, smelting, silicon The technical feasibility of silicon smelting in a DC arc furnace was investigated. A graphite-lined furnace was operated at p

    Jan 1, 2011

  • SAIMM
    Effect of mineralogy on grindability – A case study of copper ores

    By T. Nghipulile, G. Dzinomwa, J. Kurasha, M. Amwaama, B. Mapani, K. Maweja, T. E. Moongo

    The effect of mineralogy on the grindability was investigated using three copper ores – two sulphides and one oxide. The dominant copper minerals were identified by optical microscopy and mineral chem

    Mar 30, 2023

  • SAIMM
    Bindura Nickel Corporation Smelter Operations

    By E. Dzingayi

    Keywords: Pyrometallurgy, furnace, Bindura, nickel The smelter at Bindura Nickel Corporation processes concentrates from its own mines and other external sources. Concentrates are dried, smelted,

    Jan 1, 2006

  • SAIMM
    Metallurgical Accounting In The Northparkes Concentrator - A Case Study (00982089-f990-4df9-a84d-f2282567e0f0)

    By W. M. Jansen

    In many mineral processing operations, the reported production figures for an accounting period may not make the best use of available data. While most of the mathematical approaches, such as check-in

    Jan 1, 2007

  • SAIMM
    Some Myths About DC Arc Furnaces

    By R. T. Jones

    Keywords: Pyrometallurgy, DC arc furnace, myths, history, hollow electrode, radiation, resistance, flicker, AC DC arc furnaces are widely used for steel scrap melting as well as for reductive smel

    Jan 1, 2011

  • SAIMM
    Blast optimization at Kriel Colliery - Synopsis

    By A. M. Neale

    Kriel Colliery has experienced some sub-standard blast results on the overburden. Blast results are considered poor when the fragmentation is too big, back break into the new highwall, capping is expe

    Jan 1, 2010

  • SAIMM
    Changing Minds??A White Flag? ? Synopsis

    By J. L. Viljoen

    t has long been the drive of the industry and all operations to create an environment that is free of injury and illness. We have come a long way; the leaders, executives, managers, supervisors and wo

    Jan 1, 2011

  • SAIMM
    Refining Testwork On Crude Magnesium Produced In The Mintek Thermal Magnesium Process

    By M. Abdellatif

    Keywords: Magnesium, pyrometallurgy, Mintek Samples of crude magnesium produced by the Mintek Thermal Magnesium Process were refined in two stages. The first stage consisted of co-melting of batc

    Jan 1, 2006

  • SAIMM
    Co-Generation: A Challenge For Furnace Off-Gas Cleaning Systems

    By E. S. Schubert

    Keywords: co-generation, furnace CO-gas cleaning, disintegrator scrubber, Theisen In a closed, electric, reduction furnace, no oxygen enters the furnace from the surrounding environment. The off-g

    Jan 1, 2011

  • SAIMM
    Heavy Mineral Processing At Richards Bay Minerals

    By J. D. Steenkamp, G. E. Williams

    Keywords: Ilmenite, titania slag, pig iron, rutile, zircon Located on the eastern shores of South Africa, 180 km north of Durban, Richards Bay Minerals (RBM) produces approximately 2.0 million met

    Jan 1, 2006

  • SAIMM
    Post Taphole Practices Adding Value

    By H. Hearnden

    Whereas in the past, ladles were simply a means of transferring molten products from furnace tapholes to points of discharge be they casting pans or waste dumps, the ladle is now becoming a more integ

    Jan 1, 2004

  • SAIMM
    Modular Mixer-Settlers for SXPlant Sustainability

    By Henri Fredriksson, Rami Saario, Mark Weatherseed, Juri Matinheikki

    "The challenges facing the mining industry include complex ores and declining grades, together with increasing capital costs and environmental regulations. In addition, future commodity price uncertai

    Jan 1, 2015

  • SAIMM
    Future Of The South African Mining Industry And The Roles Of The SAIMM And The Universities - Synopsis

    By J. N. Van der Merwe

    The current state of the South African mining industry is briefly reviewed from the point of view of an engineer not schooled in the finer details of predictive economics. Based on the assumption that

    Jan 1, 2011

  • SAIMM
    A Review Of Previous Work On Important Properties Of Quartz For FESI And SI Metal Production

    By E. H. Myrhaug, K. Aasly, T. Malvik

    Quartz is one of the main raw materials for the carbothermic production of ferrosilicon and silicon metal. The ideal process is written: SiO2 + 2C = Si + 2CO The real process is much more compli

    Jan 1, 2007

  • SAIMM
    Use Of Chemical Energy In Submerged Arc Furnace To Produce Ferrochrome: Prospects And Limitations

    By Chandrakala Kari, S. Mohan Rao, Gajanan Kapure, K. S. Raju

    High carbon ferrochrome production process is energy intensive, consumes approximately 3300-3400 kWh per ton of metal produced. This amounts to ~ 34% of the total ferrochrome production cost. The powe

    Jan 1, 2007

  • SAIMM
    Nederburg Miner

    Research into the mechanisation of ore winning from the very narrow reefs characteristic of South African gold mines has been conducted from as early as 1964 through the Chamber of Mines Research Orga

    Jan 1, 2008

  • SAIMM
    Dynamic events in roof strata—Occurance and prevention

    By J. Drzewiecki, J. Kabiesz

    Coal mining using longwall methods of mining can lead to intense disturbances of undermined roof strata. The disturbances may extend beyond the extraction area and the resulted rock mass deformations

    Jan 1, 2003

  • SAIMM
    Furnace Upgrade With Hatch Technology At Pt Antam FeNi-II IN Pomalaa, Indonesia

    By I. Jauhari, F. Stober, D. Fowler, B. O. Wasmund, T. Miraza, C. Nichols, A. Taofik Hidyat, K. Said

    The existing PT Aneka Tambang (Antam) ferronickel smelter located at Pomalaa, Indonesia consists of two RKEF lines with reduction furnaces nominally rated at 17 MW and 18 MW, respectively. The low pow

    Jan 1, 2007