Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Investigations Into The Effect Of Discontinuities On The Strength Of Coal PillarsThe major proportion of South African coal is extracted by the bord-and-pillar mining method which requires that the overlying strata be supported by pillars of coal. The stability of the pillars is a
Jan 1, 1997
-
A Phased Development Schedule For A Platinum Concentrator Utilizing A Dynamic Stockpile Model ? SynopsisBy J. Labuschagne
There are a number of factors that contribute to the profitability of a mine and its associated concentrator. Chief among these is the time taken from the first hoist of material from underground to t
Jan 1, 2013
-
The Corporate Cost Of CapitalBy E. V. Lilford
Equity investors and project sponsors have divergent views about expected or minimum returns that should be generated by a mineral project. Irrespective of their views, the fundamental estimation of t
Jan 1, 2006
-
Design Procedure For Hydraulic Backfill Distribution SystemsA wide range of materials are used in hydraulic backfilling operations and the pipeline flow behaviour of these mixtures varies considerably. It is shown that despite the large differences in constitu
Jan 1, 2001
-
Pillar Failure in Deep Coal Seams: Numerical SimulationBy S. Badr, R. Mendoza, M. U. Ozbay, M. D. G. Salamon
ABSTRACT: The use of coal pillars at depth is fraught with problems due roof control difficulties and the possible occurrence of coal or pillar bumps. In the USA the largest and most important applic
Jan 1, 2003
-
Project Delivery In The Mining Industry - Options And TrendsBy B. McCosker
The choice of the appropriate delivery process for a project is often not adequately thought about. The industry needs to be prepared to break its preconceived mind-sets on delivery procedures. Indust
Jan 1, 2002
-
Management Of A Major Slope Failure At Nchanga Open Pit, Chingola, Zambia. - Synopsis:By SDN Wessels, WA Naismith
On 16 July 2004, at 07:10 a collapse of about 1.8 million m3 (about 4 ½ million tonnes) took place on the north wall on Nchanga Open Pit This collapse was the result of a developing instability th
Jan 1, 2005
-
A critical review of initial Resource and Reserve tonnage estimation and reportingBy L. Roux
This review was initially motivated by the author’s own experience in attempting to reconcile run-of mine production tons with the Coal Resource and Reserve estimation of mineable, in-situ tonnages. T
Nov 1, 2021
-
The Influence Of Rockpass Excavation And Operation On The Structural Design Of Box FrontsBy S. Achilleoudes
This paper describes the various factors that contribute to the maximum design pressures acting on box fronts and how these factors influence the mass and economy of box front steelwork. The influence
Jan 1, 2005
-
A Case Study Of High-Temperature Corrosion In Rotary Cement KilnsBy J. H. Potgieter
This paper describes two cases of corrosion that occurred in dry-process, rotary, cement-clinker kilns. In the case of the kiln with five pre-heater stages, the attack occurred primarily from sulphate
Jan 1, 2004
-
The Impact Of Water Quality On Flotation PerformanceWater represents 80?85% of the volume of mineral pulp processed in flotation circuits. Imperatives for a more detailed focus on circuit water quality and its control have come from increasing requirem
Jan 1, 2001
-
Quantifying The Differences In Hangingwall ConditionsBy M. Grodner
Underground excavations exhibit different hangingwall conditions in response to varying geotechnical and mining situations. These differences need to be quantified so as to accurately determine the ef
Jan 1, 2000
-
Interpreting The Role Of Reagents In The Flotation Of Platinum-Bearing Merensky Ores (88a12038-fab7-4c44-9664-18f4b67c2b55)By J. G. Wiese
Reagents are added to the flotation process of Merensky Reef ores to achieve specific functions that enable the separation of valuable minerals from gangue minerals on the basis of the difference in t
Jan 1, 2007
-
Characterization Of Coal Mine Panels In Bord And Pillar Workings In Respect Of Their Proneness To Spontaneous Heating - A Prediction ModelBy T. R. Roy
A prediction model, developed by Central Mining Research Institute (India) for evaluation of fire risk rating of underground coal mine panels in bord and pillar working in respect of their proneness t
Jan 1, 2003
-
Electronic Delay Detonators - A Unique Solution To Pertinent Mining Problems (VOLUME 105 )By R. Banda
This paper describes the decision to implement and then the implementation itself, through trials, of electronic ?Smartdets? over previously used shock tubes. It concludes that Mufulira Mine has becom
Jan 1, 2005
-
Modeling rock mass bulking around underground excavationsBy J. Gómez-Hernández, P. K. Kaiser
Abstract The process of stress-induced fracturing around underground excavations in brittle rock is associated with dilation or volume increase of the failed, fractured rock. Different attempts to
Jan 1, 2003
-
The Allure, Magic And Mystery - A Brief History Of DiamondsBy G. Smith
This paper describes the allure of diamonds over time and highlights the magic and mystery of famous diamonds. Consideration is given to the effectiveness of marketing in the diamond industry. It is c
Jan 1, 2003
-
Piloting Of The Ishigaki Fibre-Wakishimizu (Fibre Media Rapid Filtration Equipment) At Skorpion Zinc ? Summary (4cb2c708-51b2-4b55-8a1e-390793b28d6a)By H. F. Fuls
The quality of Pregnant Leach Solution (PLS) at Skorpion Zinc is of utmost importance for efficient operation of the Solvent Extraction (SX) Plant. Suspended solids in the PLS forms CRUD in the settl
Jan 1, 2008
-
An Agglomerate Scale Model For The Heap Bioleaching Of ChalcociteBy N. Ogbonna
A mathematical model for bioleaching at the agglomerate scale is developed. The agglomerate is defined as a unit volume of a heap which contains a solid phase (a size distribution of ore particles), a
Jan 1, 2006
-
Pit Slope Design And Risk ? A View Of The Current State Of The ArtBy T D. Sullivan
Risk lies at the heart of all mining and nowhere more so than in pit slope design. Mining is principally about two areas of risk; safety and economics. This paper addresses the main elements of pit
Jan 1, 2006