Maximizing Drill Factors in Construction BlastingBy Pat McLaughlin
Blast design in the construction industry has often been based on past practice or powder factors. This is to some extent understandable, since construction projects do not have the longevity of minin
Jan 1, 1994
-
Demonstrating Competence from Charge Hands to Chartered EngineersBy Ken Cross
This paper aims to demonstrate that explosives organizations and workers have a legal, moral and financial duty to be able to demonstrate their competence when required, and how that may be achieved a
Jan 1, 2013
-
AN Railcar Derailed Debris Collection–Data Analysis UpdateBy Brandon Fryman, Josh Hoffman, Rhys Baker
A post-detonation debris collection project was led in conjunction with a large ammonium nitrate(AN) railcar detonation conducted by the Department of Homeland Security-Transportation Security Adminis
-
Portable, Multi-Channel and Continuous Velocity of Detonation RecordersBy Jackson R. Pressley, Bruce Vandenberg
An explosive’s velocity of detonation, (VOD), can be used to indicate a number of important characteristics regarding the product’s performance, under specific field and test conditions.
Jan 1, 1997
-
Choosing the Right Delay Timing for the Blasting Application, Optimization and Maintaining Field ControlsChoosing the correct delay time for many blasting applications is an important and critical blast design parameter for controlling fragmentation, muckpile shape, swell, digability, throw, ground vibra
Jan 1, 1998
-
600 000 M.T to move, a High Risk OperationBy Jean-Sébastien Lambert, Serge Roberge
"At the end of 2014, Holcim Canada (Demix Aggregates Division) considered the possibility of drillingand blasting a big volume of rock in order to expose a high-quality limestone bench in one of their
Jan 1, 2016
-
Masterblaster Blasting Management SystemBy Chris Uys, Johan Labuschagne
Sishen Iron Ore Mine, located in the Northern Cape, is an open cast mine excavating approximately 100 million tons rock to produce 25 million tons of high grade haematite ore per annum. The size of th
Jan 1, 1997
-
Wireless Electronic BlastingBy Daniel Mallette, Richard Goodridge, C M. Lownds
Despite a world of mobile devices that has many of us taking the ability to communicate wirelessly for granted, an in-hole wireless initiation system was thought to be not viable. The known and common
Jan 1, 2016
-
Precision Presplitting OptimizationBy Anthony J. Konya, Calvin J. Konya
Mine sites and construction projects have faced problems with blasting a smooth back wall. This lead to safety concerns with slope stability and rock falls from the walls. Decades ago Dr. Calvin Konya
Jan 1, 2016
-
Application of Non-Newtonian Fluid Mixture for Stemming Performance OptimizationBy Braden Lusk, Paul Sainato, Josh Calnan, Hiago Vasconcelos, Luis Felipe Marinho
"Blasting and rock fragmentation is one the most important unit operations in mining. Since itsintroduction into the mine production cycle, mining has become more efficient in mineral production(Hartm
Jan 1, 2016
-
Reliability of Timing Sequence Network for Multiple Blast HolesBy Lifeng Li, Jhon Silva-Castro
In a previous work, the authors analyzed the overlapping probability of two adjacent charges in a single hole for pyrotechnic and electronic detonators. This document extends such work to a complete m
Jan 1, 2016
-
Downstream Benefits of Optimized DrillingBy Kevin Landey, Eric Gerst
Expanding blast patterns to near the limit of an explosives’ ability to do the necessary amount of work is a common practice to reduce drilling and blasting costs. Choosing less expensive explosives s
Jan 1, 2018
-
Radical Improvements to Blast Hole Drilling Cost and Productivity thru Integrated TeamsBy R W. Thomas
"This paper explores the possibilities of generating radical improvements in the drihing costs andproductivity of blastholes through the efforts of integrated teams as opposed to traditionalcustomer/v
Jan 1, 1996
-
Blast Master Plan: the Key to efficiency and optimization. Case study at Ellatzite copper mine.By Grigor Mishev, Georgi Petrov, Benjamin Cebrian
Before designing a single blast or all the blasts on a pit level, it is critical to assess the main goal on each. To do this, a series of constraints must be taken into account: wall protection, vibra
Jan 1, 2016
-
A Model for Near and Farfield Blast Vibration Based on Multiple Seed Waveforms and Transfer FunctionsBy D. Scott Scovira, Ruilin Yang
Blast vibration in the highwall from a cast blast in open pit mines or in the hanging walls from a stope blast in underground mines is a common concern. Vibration in such cases is a typical near-field
Jan 1, 2010
-
The Effect of Fragmentation on Loader ProductivityBy Michael D. McGill
The effect of fragmentation size distribution as it relates to front end loader productivity was evaluated by comparing loader cycle times to fragmentation size of the shot rock. At Gold Mine in Sout
Jan 1, 1994
-
Craxy Horse Drilling & Blasting the Fine Art of Mountain CarvingBy Crazy Horse - The Journal of Explosives Engineering - Vol 20 No 1
The crew at Crazy Horse Memorial has produced a w o n d e rful new video called “The Fine Art of Mountain Carving.” The video closely examines for the first time, the extraordinary explosives engineer
Jan 1, 2004
-
Shaft Sinking: Drill and Blast & Vertical Shaft Sinking MachinesBy Sam Ammermann, William Heasley
"The mining industry is on an ever accelerating path to complete mechanization. As companiesutilize more sophisticated and efficient methods of blasting, a more thorough look should begiven to the pro
Jan 1, 2016
-
Unmanned Aircraft Systems Use in Blasting OperationsBy Lon Santis, Dale Ramsey
The use of aircraft to support blasting operations in mines, quarries and construction sites goes back to the early days of aviation. Invaluable at times, aircraft use has been limited by cost, the un
Jan 1, 2016
-
Blasting for the Enhanced Western Groundwater Extraction System - Modern LandfillBy Jay Smerekanicz, Florin: Pedersen Gheorghiu, Alan Cameron
In order to expand the capacity of Modern Landtill, a groundwater extraction system consisting of a linear system of pumping wells over 2,700 feet long had to be replaced. The new system would be cove