Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Controlled Sequential Blasting

    By E Emery Jr Gray

    A need for more delay periods other than those normally manufactured throughout the explosives industry rarely occurs. This paper will discuss one such incident from an analytical view through practic

    Jan 1, 1976

  • ISEE
    Underwater Explosions: Natural Resource Concerns, Uncertainty of Effects, and Data Needs

    By Marion Smith, Thomas M. Keevin, Dennis G. Wright, Gregory L. Hempen, Joel B. Gaspin, Thomas L. Linton, Gregg R. Gitschlag

    "A Natural Resources Working Group, within the International Society of Explosives Engineers, reviewed published environmental effects data, identified data gaps, and prioritized data collection needs

    Jan 1, 1999

  • ISEE
    Cast Blasting: Design and Applications

    By Travis Watts, Chris Prater, G. T. Lineberry

    Moving overburden at minimal cost is becoming increasingly important to coal mining companies throughout the U.S. The coal market is currently doing well, with an average spot coal price for Central A

    Jan 1, 2006

  • ISEE
    The Application of SOM Networks on Rock Blastability Classification

    By Jiang Han, J. F. Shao

    Based on the rock blasting engineering, The Self-Organizing Map (SOM) network has been implemented for the concept and method of rock blastability classification. The Self-Organizing Map (SOM) is a ne

    Jan 1, 2002

  • ISEE
    Gap Sensitivities of Water-Gel Explosives

    By V Krishna Mohan, J Edmund Hay

    This paper discusses the results of the gap sensitivity measurements made on water-gel explosives, sensitized by monomethylamine nitrate (MMAN) and flake aluminium, and one emulsion explosive. This st

    Jan 1, 1982

  • ISEE
    Real-Time Prediction of Meteorological Effects on Airblast Levels

    By Adrian Moore, Alan Richards

    A real-time system for prediction of the effect of meteorological conditions on airblast overpressure levels has been established in the Hunter Valley Coalfield in Australia. Real-time meteorological

    Jan 1, 2009

  • ISEE
    Some Aspects of Small Scale Slant Hole Drilling

    By Edward J. Jr Walter

    This paper discusses the use of slant hole drilling and water matting as an effective method of reducing costs in shaft sinking operations through a general review of cost priorities for the contracto

    Jan 1, 1976

  • ISEE
    ICI's ExEx2000 Blasting Systems

    By Peter Duniam, Vivian Patz

    History of the ExEx 1000 CAB system. l What we’ve learned using electronic timing. l Requirements for a second generation. EDD system. l The ExEx 2000 system - simple, versatile and cost effective

    Jan 1, 1997

  • ISEE
    Journal: Safety Talk / The Safety of Electronic Initiation Systems

    By Wm. Reisz, Raphael Trousselle

    We are now well into our second decade of commercially available electronic initiation systems. Over this time, the technological advances have made electronic systems a very practical option for a wi

    Jan 1, 2011

  • ISEE
    Professionalism in Drilling and Blasting in Surface Coal Mining Operations

    By Dean E. Albon

    The author gives a brief resume of his observations of drilling and blasting supervision in surface coal mines during the past thirty years and recommendations for upgrading this supervision to the ca

    Jan 1, 1979

  • ISEE
    A Laboratory Study of Explosives Malfunction in Blasting

    By P D. Katsabanis

    Explosives malfunction due to shock waves is a serious concern for successful blasting results. Malfunction includes sympathetic detonation and desensitization of explosive charges as well as the modi

    Jan 1, 1995

  • ISEE
    Lubrication of Rotary Rock Bits

    By J MacPhail, H Gardner

    This paper discusses reasons why users of rotary air blast hole bits encounter premature bit failure due to bearing failure. It also discusses a lubrication system designed for rotary rock bits to com

    Jan 1, 1996

  • ISEE
    What a Gas: Blasting Under Pressure (8726b99d-0c1c-4f90-bc37-7481da7b7d20)

    By Jerry R. Wallace

    This project consisted of blasting for expansion of a major interstate natural gas transmission pipeline pump station. The pump station handled 400-500 million cubic feet (11-14 million cubic meters)

    Jan 1, 1996

  • ISEE
    Blaster Training and Certification Requirements

    By Jean A. McIntyre

    The Office of Surface Mining (OSM) has twice proposed rules for a blaster training and certification program to implement Sections 515(b)(15)(D) and 719 of the Surface Mining Control and Reclamation A

    Jan 1, 1980

  • ISEE
    South African Blasting Practice in Shaft Sinking

    By Rodney C. Espley-Jones, John C. B Wilson

    South Africa is well known for its shaft sinking exploits, and many of the world's biggest and deepest shafts are to be found there. Blasting practice differs in a number of respects from that followe

    Jan 1, 1979

  • ISEE
    Diggability, a Measure of Dragline Effectiveness and Productivity

    By Clive-Workman Davies, K K. Kabongo, Mensah Frimpong

    Given the capital intensity of the dragline operation coupled with rising cost of explosives, the onus is on mine operators to make maximum use of explosives in blasting to assist dragline diggability

    Jan 1, 1996

  • ISEE
    Analysis and Visualization of Drilling and Blasting Data

    By M Siefert, P Moser, T Oberndorfer

    "The EC-project ""Blasting Control"" with partners from France, Austria, Italy and Greece dealt with the development of a diagnosis system, which enables blasting experts to investigate in detail on p

    Jan 1, 1996

  • ISEE
    Defining Detonation Energy Fro Practical Blasting

    By Claude Cunningham

    Simple bulk energy rating of explosives obscures the realities of how these deliver their energy, and diverts attention from the key question of controlling blasting results. Explosive performance is

    Jan 1, 2002

  • ISEE
    Controlling Backbreak with Proper Borehole Timing

    By Calvin J. Konya

    Backbreak behind the last row of boreholes can be a significant problem for blasting operations. Backbreak will interfere with the proper drilling and execution of the subsequent shot and can produce

    Jan 1, 1987

  • ISEE
    Highwall Safety

    By John C. Didlinger, John L. Didlinger

    As we begin the pre-blast survey we need to decide on the number of holes needed for production and a detailed highwall inspection. The survey consists of checking the highwall and placement of barrie

    Jan 1, 1996