Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Reducing Downdrag Loads With Bitumen

    By J. -L. Briaud

    This presentation shows the results of laboratory and field tests to date for the NCHRP project entitled "Downdrag on Bitumen-coated Piles". This project required to test a variety of bitumens in the

    Jan 1, 1991

  • DFI
    Accessing History

    By Richard Pizzi

    Built in 1806, Boston's African Meeting House is the oldest surviving Black church building in the country. A $7 million dollar renovation was begun in 2006 to restore this historic building to

    Jan 1, 2011

  • DFI
    Advances In Marine Piling Techniques And New Age Piling Materials

    By D. Cantali

    This paper will be presented in two parts. The first part will present the latest advancements in pile installation techniques using state-of-the-art press-in piling technology by Giken. By pressing i

    Nov 1, 2022

  • DFI
    Secant Pile Shoring - Developments In Design And Construction

    By Eric S. Lindquist

    High groundwater levels combined with variable soil and rock profiles present challenges to the design and construction of deep excavation support systems. Increasingly, secant piling techniques are t

    Jan 1, 2011

  • DFI
    Diaphragm Walls for Seepage Control and Remediation: Three Case Histories

    By Fabio Santillán, Mario Mauro, Raffaella Granata

    "This paper presents the utilization of slurry walls methods for the recent remediation of three high hazard active dams in the United States. Tuttle Creek Dam, located in Manhattan, KS, required seis

    Jan 1, 2016

  • DFI
    The Waterloo Barrier - A Sealable Joint Steel Sheet Piling For Groundwater Control And Remediation - Presented At The Deep Foundations Institute Annual Meeting & Conference Toronto, Ontario, October 15-17, 1997 - Summary

    By Murray Gamble

    A new type of groundwater cutoff wall has been developed at the University of Waterloo. The Waterloo Barrier? is a steel sheet piling system that incorporates a sealable cavity at each interlocking jo

    Jan 1, 1997

  • DFI
    Site Solutions For The Pisa Tower Remediation - 1 - Introduction

    By Paolo Heiniger

    The aim of this paper is to present the operative solutions devised and then adopted to implement the underexcavation (soil extraction) of the Tower of Pisa, by means of soil extraction. The inter

    Jan 1, 2000

  • DFI
    CFA Secant Piling In California

    By Philip Derbyshire, Dale J. Scheffler

    "Continuous Flight Auger (CFA) piling is a variation of Augered Cast-In-Place (ACIP) or augercast piling. In both cases a continuous auger with a hollow stem is used to drill a hole and a pile is form

    Jan 1, 2005

  • DFI
    Application Of High-Strength Concrete To Drilled Shafts - 1. Summary

    By A. E. Fiorato

    A test program was conducted to evaluate use of high-strength concrete in drilled shafts (caissons). The objective of the program was to determine if internal temperatures developed during cement hydr

    Jan 1, 1991

  • DFI
    Jet Grouting For Deep Excavation Support For Re-Entrant Corners

    By Chu E. Ho

    This paper reviews the design of jet grouting at re-entrant corners of excavations where the diaphragm wall and secant pile wall installation were interrupted by existing utilities in the streel sidew

    May 1, 2022

  • DFI
    Use Of Anchors In Floors Of Large Drydocks And Wagon Tipper Sheds ? Synopsis

    By W. H. Liu

    The stability of floors of large drydocks and wagon tipper sheds at coal terminals is an important matter but quite difficult to solve. Anchors can be used to join floors to foundations thus ensuring

    Jan 1, 2010

  • DFI
    Analysis Of Driving Stress Measured In The RC Long Pile

    By Yu Zhenquan

    At the construction site of Bao Shan Iron &. Steel Mill in Shanghai, lots of RC driven piles with length of 50 to 60m were applied. The most unfavourable distribution of stress along the pile shaft wa

    Jan 1, 1991

  • DFI
    Construction Of Foundation Of Power House-IV At W.Y.C., Hydro-Electric Project, H.S.E.B., Bhudkalan, Haryana. - Synopsis

    By D. K. ] [Gupta

    The Foundations of the Shear keys and alround cut off for Power House -IV of the Western Yamuna Canal Hydroelectric Project at Bhudkalan, Haryana were to be laid at a depth of 26M below the N.S.L and

    Jan 1, 1996

  • DFI
    Behavior Of Large Bored Piles With Grouted End

    By Zhang Yaonian

    This paper describes full-scale tests on ten large bored piles with grouted end conducted for three projects in the urban area of Fuzhou city. Test program included site investigation, pile installati

    Jan 1, 2004

  • DFI
    Drilled Shaft Design For Noise Wall Barriers Along I-20 In Columbia, SC

    By Anil Bhandari

    Using subsurface data collected at each drilled shaft location is an ideal approach for conducting drilled shaft design. However, conducting subsurface tests at each drilled shaft location and subseq

    Jan 1, 2011

  • DFI
    Life Extension of 132 kV Lattice Tower Foundations

    By Allan Herse

    "The years following World War II were nation building years in Australia. Soldiers returned from the European and Asian theatres of war sparking a major infrastructure construction boom. Dams and hig

    Jan 1, 2017

  • DFI
    ISM MICROPILE WORLD CUP 2017 WINNER - Life Extension of 132 kV Lattice Tower Foundations

    By Allan Herse

    "The years following World War II were nation building years in Australia. Soldiers returned from the European and Asian theatres of war sparking a major infrastructure construction boom. Dams and hig

    Jan 1, 2017

  • DFI
    Analytically Modelling Dst Arrival Time Databases With High Order Polynomials For Optimal High Resolution Imaging

    By Gerald Verbeek, Erick Baziw

    Downhole Seismic Testing (DST) is an extensively utilized geotechnical tool for site characterization. DST provides low strain (<10-5) in-situ interval shear and compression wave velocity estimates. T

    Oct 1, 2022

  • DFI
    Drilled Pier Foundation with Ground Improvement Using Cement Deep Soil Mixing for Highway Bridges

    By Shahriar Vahdani, Andy Herlache, Andrew Bro, Wei-Yu Chen

    "The Presidio Parkway Project will reconstruct approximately 1.6 miles of highway, including seven bridges, three cut-and-cover tunnels, and an undercrossing connecting the Golden Gate Bridge to the C

    Jan 1, 2014

  • DFI
    Contribution of Inner Frictional Resistance to Bearing Capacity of Open-Ended Piles

    By Janaka J. Kumara, Takashi Kurashina, Yoshiaki Kikuchi, Takahiro Yajima

    "The inner frictional resistance of open-ended piles depend heavily on the degree of soil plugging. Many factors including pile diameter, relative density and end conditions of the piles influence the

    Jan 1, 2017