Kentucky Route 9 - Licking Pike Widening Design Build Slope StabilizationBy Frederick W. Slack
This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage
Jan 1, 2003
-
Dynamically Cast-In-Place PilesBy John J. Vieaux
Allowable loads on Dynamically-Cast-In-Place Piles (the Franki type) can be correlated with N values from the Standard Penetration Test. Using a constant developed by Nordlund, a conservative value fo
Jan 1, 1984
-
Static Alternating Cyclic Horizontal Load Tests On Driven Steel Pipe Piles Of Foundations For Highway BridgesBy Kouichi Tomisawa
Two bridges were constructed for extension work of Central Hokkaido Connection Road in 2005 at two different sites. Pile group foundations were employed for the foundations of abutments of the two bri
Jan 1, 2006
-
Non-Conventional Practice: Recent Case Histories of the use of Vertical Buttress Piles in Deep Excavation SupportBy Tony Brunger, Abid O. Adekunte, George Munteanu, David Greentree
A number of novel solutions have been proposed in recent years as alternatives to props and tie-backs in deep excavation support e.g. Adekunte (2008), Deschamps et. al. (2008), Adekunte et al. (2010)
Jan 1, 2018
-
Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? SummaryBy Chris Harnan
This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques
Jan 1, 2000
-
New Technologies For Quality Control Of Augered Cast-In-Place PilesBy Tracy Brettmann
In recent years the Augered Cast-In-Place (ACIP) Pile industry has seen a substantial increase in the quality control options available to Contractors, Engineers, and Owners. Quality control methods r
Jan 1, 2000
-
Case History: Use Of Rock-Socketed Augered Cast-In-Place PilesBy Tracy Brettmann
The use of rock-socketed Augered Cast-In-Place (ACIP) piles is new to the Austin and central Texas region. This case history describes the design methodology, load test results, quality control proced
Jan 1, 1998
-
Design And Construction Of The Rion Antirion Brdoge FoundationsBy Alain Pecker
The choice of a design concept for a bridge foundation is guided by various factors; several of these factors are indeed of technical origin, like the environmental conditions in a broad sense, but ot
Jan 1, 2005
-
An Investigation of Grouted Pile Capacity Using Instrumented Pile Load TestsBy Hayel M. El-Naggar, Sherif A. Akl
Although grouted piles have been used for several decades since the idea was proposed in the 1970s, their design is mostly based on experience and unpublished proprietary methods. There is little rese
Jan 1, 2018
-
Application of Mammoth Vibro-Tamper (MVT) for the Shallow Compaction at Airport Runway Expansion Project on Florida Limestone GroundBy Kazunori Matsushita, Frank Vespi, Emi Walder, Mitsuo Nozu
During the runway expansion project at the Fort Lauderdale-Hollywood International Airport in Florida (FLL project), therewere complicated geotechnical issues with a number of cavities in the limeston
Jan 1, 2018
-
Cut-Off Walls For Diamond Mining In The ArcticBy Wolfgang G. Brunner
A 3800 m long temporary water-retaining dike has been constructed under extreme conditions in the harsh northern climate to enable two of the kimberiite pipes at the Diavik Diamond Project reserve to
Jan 1, 2003
-
Single Pile Settlement Prediction And Analysis For Driven PilesBy David R. Beadman
The Fleming method is widely used for the analysis and prediction of single pile behaviour under maintained loading. The method does not distinguish between bored and driven piles. Driven piling avoid
Jan 1, 2006
-
New CIGMAT Downhole Penetrometer (DHP-CIGMAT) For Use During Drilled Shaft ConstructionBy C. Vipulanandan
It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increas
-
Application Of Bu-Type Steel Sheet Pile On Construction Of Ports ? PrefaceBy Zhou Lu-Jian
The Port of Shekou is situated at Shenzhen Bay on the east bank of Lingding Ocean. Its coastline is about 6 km long and the water depth near the shore is Favourable. Across the bay is the ' New T
Jan 1, 1991
-
What Has Been Learned About Drilled Shafts From The Osterberg Load Test - SummaryBy Jorj O. Osterberg
The Osterberg (O-Cell) Method makes it possible to separate the side shear resistance (skin friction) from end bearing. The O-Cell is placed on or near the bottom of a drilled shaft and after the conc
Jan 1, 1999
-
Pile Load Test Results For Highway 280 Pile Uplift Test SiteBy Douglas Brittsan
This paper presents pile tension and compression load test results for the Southern Freeway Viaduct (North) pile load test site. The testing program represents a collaboration between California Depar
Jan 1, 1993
-
Anamolies Ammednments And Revision Of Is Code On Underreamed Piles - SynopsisBy A. V. Shroff
The Indian Standards code of practice for design and construction of underreamed piles contains provision for installing such piles in expasive soils. In recent years, a large amount of research work
Jan 1, 1996
-
Instrumentation Of Construction VibrationsBy Mark R. Svinkin
Construction vibrations may adversely affect surrounding buildings and their effects range from human discomfort and disturbance of sensitive devices to visible structural damage. There is no unique c
Jan 1, 2002
-
Use of Menard Pressuremeter Test Results to Predict a Bearing Capacity and Settlement of Bored PilesBy Ramdane Bahar
"Abstract The design foundations can be performed using Menard pressuremeter rules that require a limit pressure and a pressuremeter modulus. In recent years, another trend of interpretation of this t
Jan 1, 2014
-
A Need To Reevaluate Attitudes In Engineering And ConstructionBy d&apos, E. Appolonia
A construction project is successful when all parties contributing to it are winners. It is not a success when there are winners and losers. Contractors, engineers, suppliers and equipment developers
Jan 1, 1985