Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Evaluation of liner capacity for blast damage mitigation

    By J. F. Archibald

    A research effort has been undertaken, under Workplace Safety and Insurance Board of Ontario (WSIB) sponsorship, to characterize the support capabilities of conventional and innovative spray-on lining

    Jan 1, 2004

  • CIM
    Why SA Matters: Cost of Lacking Operator SA

    Scope / Agenda ? What is Situation Awareness (SA)? ? Background on SA theory ? SA is critical in a wide variety of domains ? SA and human performance ? Consequences of poor SA ? Significant chal

    Aug 1, 2013

  • CIM
    Educating Mining Engineers Online

    By Tad S. Golosinski

    The paper describes Online Master of Engineering Program at the University of Missouri-Rolla and discusses the experience gained during the first three years of its offering. This innovative education

    May 1, 2004

  • CIM
    Stope Stability Monitoring at the Goldex Mine

    By Patrick Frenette

    The Goldex Mine is an underground gold mine using a unique mining method where a single very large stope is being created. In order to maintain stability of the walls and roof of the stope which is 45

    May 1, 2011

  • CIM
    Truck Selection and Application at Hilton

    By L. Price, R. Hortie

    Movement of ore and waste from the Hilton Mines pit is accomplished by truck haulage. With the aim of reducing costs, a study of truck fleet replacement was initiated. The study included on-site short

    Jan 1, 1971

  • CIM
    Blast simulation surface and underground with the SABREX model

    By G. K. Jorgenson, S. H. Chung

    "IntroductionThe SABREX Blast Modelling Program was developed jointly by the companies of the ICI Explosives Group, of which C-I-L Inc. is a member. SABREX (Scientific Approach to Breaking Rock with E

    Jan 1, 1987

  • CIM
    Geostatistical Simulation of Optimum Mining Elevations for Nickel Laterite Deposits

    By J. A. McLennan

    Nickel laterite deposits are typically formed from tropically weathered mafic-ultramafic complexes. The resulting nickel concentration is found within soil horizons and is mineable with regular dozer

    Apr 1, 2005

  • CIM
    Variable speed SAG milling

    By M. N. Brodie

    "The ability to adjust the speed of a SAG mill offers benefits to the process and to equipment maintenance. It can be provided with some slight effect on availability ranging from somewhat enhanced to

    Jan 1, 2003

  • CIM
    Constructed Wetlands that Emphasize Sulfate Reduction: A Staged Design Process and Operation In Cold Climates

    By T. R. Wildeman

    "At the Big Five wetland, which was built to treat drainage from a metal mine, encouraging results have attributed to sulfate reduction. Cu and Zn were reduced to below detection limits of 0.50 mg/L,

    Jan 1, 1992

  • CIM
    The Future of Applied Research in Canada

    By W. M. Armstrong

    This paper compares research on development efforts in various countries, consideration being given to gross expenditures, manpower involved, source of funds, sector of performance and type of activit

    Jan 1, 1968

  • CIM
    Gold Deportment Studies on a Copper-Gold Ore - A Systematic Approach to Quantitative Mineralogy Focusing on Diagnostic Metallurgy

    By Aparup Chattopadhyay, Barun K. Gorain

    "Porphyry copper deposits are the most important source of copper and also gold within the orogenic belts. These deposits are characterized by low grade copper ore (0.2% to 1% copper) and host preciou

    Jan 1, 2013

  • CIM
    A New Potential Standard in Monitoring and Optimizing Deposit Control in Mining Process Waters

    By W. J. González

    "With the increasing demand for minerals, technologies to maximize mineral recovery are paramount to a mine’s economic success. Many mining process waters have the potential to form calcium-based inor

    Jan 1, 2014

  • CIM
    High Strength Aerated Cement Bulkheads for Target Gold Mine, South Africa

    By D. J. R. Ras

    A sub-level open stoping method is being used to mine the massive deposits at TARGET Gold Mine which uses cemented tailings to backfill the stopes. This requires the construction of bulkheads to conta

    May 1, 2007

  • CIM
    Fine Grinding with the Szego Mill - An Update

    By G. Papachristodoulou, O. Trass

    "Performance data for both wet and dry grinding of materials have been obtained in this novel, planetary ring-roller mill over wide ranges or operating conditions. The Szego mill consists of a station

    Jan 1, 1986

  • CIM
    Design and Implementation of a Brownfield Sag Pre-Crush Circuit

    By G. Castillo, G. Thies, C. Bissue

    "Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond

    Jan 1, 2013

  • CIM
    Enhancing Bacterial Activity in a Uranium Mine

    By D. W. Duncan, A. Bruynesteyn

    Acidic mine waters containing solubilized uranium have been observed in many uranium and some copper mines. In every case, the sulphide and iron oxidizing bacterium, Thiobacillus ferrooxidans, was als

    Jan 1, 1971

  • CIM
    Developing a Unified Display Design for Mining Shovels

    By Andrew Chapman

    The scope of the SA (Situational Awareness) working group is to analyze the effectiveness of information delivery systems in mining equipment and develop a unified display design, to mitigate against

    Aug 1, 2013

  • CIM
    Early Innovations in Copper Hydrometallurgy: The Unknown 1866 Whelpley & Storer Process

    By W. W. Culver

    The paper explores the substance, circumstances and significance of the Whelpley and Storer Copper Process. The 1866 Whelpley and Storer patent specified a process combining mechanical and chemical en

    Jan 1, 2019

  • CIM
    New Technology for Hoist Conveyance Monitoring and Analysis

    Many mines in Canada, the US and S. Africa are reaching the hoisting limit. Very little payload will be possible without compromising safety due the excessive weight. It has been suggested (DeLorme, 2

    May 1, 2002

  • CIM
    Emergency Egress/Ventilation Raise Innovations in Directional Raise Boring & Remote Shotcrete Application

    By Eric Schraml

    Wardrop Engineering and the Placer Dome?s Campbell Mine Design Team utilized leading edge directional raise boring techniques and an innovative, remote controlled application of steel fibre reinforced

    May 1, 2002