Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Total Mining System (TMS): The basis for open pit automation

    By Jonathan Peck, Jim Gray

    "With the implementation of more advanced monitoring, control and locating systems in surface mines, there is an ever increasing need for their mine-wide integration toward achieving over-all optimiza

    Jan 1, 1995

  • CIM
    ContiScan? by meglab.ca - Continuous Monitoring Wire Ropes for Mine Hoisting Operations.

    Presentation Plan Hoist ropes ?Importance ?Mandatory and routine Inspections Continuous monitoring of wire ropes for mine hoisting ?Why a continuous monitoring of mine hoisting ropes.? ?

    Aug 1, 2013

  • CIM
    Education is the Stumbling Block for the Mines of the Future

    By T. Yameogo

    Many ideas, tools, technologies, and methodologies are believed to have staked their claims on the future of mining. For example, automation is strongly positioned as the platform within which mining

    Aug 1, 2013

  • CIM
    A design philosophy for surface crown pillars of hard rock mines

    By Marc C. Bétournay

    "Surface crown pillars, acting to safely protect underground workers and operations from surface elements, are recognized, herein, as distinct from conventional deeper underground pillars. Moreover, b

    Jan 1, 1987

  • CIM
    Resource/Reserve Estimation and Inventory: Can Reporting Definitions Substitute for Standards?

    By Marcel Vallée

    "Abstract - Traditionally, the emphasis in ore and reserve inventory has been to provide fairly simple definitions and presentations for reporting to shareholders and the investing public. The recent

    Jan 1, 1998

  • CIM
    Long-Term Performance of Dry Cover Systems for Reactive Mine Waste

    By David Christensen

    The long-term performance of dry covers is being examined in a research study funded by the International Network for Acid Prevention (INAP). The study was separated into two phases. The two main comp

    Nov 1, 2002

  • CIM
    Development of an Anti-Vibration Handle for Pneumatic Jackleg Rock Drills

    By Marcotte P.

    Introduction Pneumatic jackleg rock drills are commonly used in underground mining operations. These tools are known to expose their operators to hand-arm vibration levels in the order of 20-35 m/s2

    Feb 1, 2008

  • CIM
    Poly-Met Mill Liners for Autogenous and Semi Autogenous Grinding Mills

    By R. Brough

    "Over 25 years ago, SKEGA pioneered the use of rubber linings in grinding mills and rubber is today widely accepted and almost standard material chosen for Regrind - and Secondary Hills. There are, ho

    Jan 1, 1988

  • CIM
    Geometallurgy – The Key to Improving Your Mine Value Chain

    By B. D. Frater

    Geometallurgy or process mineralogy is an integrated part of the scoping, pre-feasibility and feasibility phases of a project as well as an existing operation. A well planned and executed geometallurg

    Jan 1, 2017

  • CIM
    Multi-Stage Biological Treatment System for Removal of Heavy Metal Contaminants

    By W. D. Gould, F. Goodazi, W. F. A. Duncan, A. G. Mattes

    A biological treatment system designed to passively remove high concentrations of metals from leachate collected from a landfill near a large integrated zinc lead smelter has been in operation intermi

    Jan 1, 2004

  • CIM
    Digital instrumentation and control for industrial and small utility electrical systems

    By D. B. Langford, R. Hart

    "This paper presents an overview of the state-of-the-art in industrial and utility power metering and control systems with particular emphasis on Digital Power Meters and Power Demand Controllers.Intr

    Jan 1, 1991

  • CIM
    What?s in a Goal? Strategies for Carbon Management in Mining

    ?Introduction to the Delphi Group ?Why is carbon important to your organization ?Key elements of a carbon management strategy ?Inventory ?Risk & opportunity scan ?Mitigation options and financial

    May 1, 2009

  • CIM
    Hydrolysis for Iron Control and Acid Regeneration in Chloride Hydrometallurgy Circuits

    By M. J. Dry, G. B. Harris

    "This paper presents basic chemistry and operating conditions for the hydrolysis of ferric chloride into solid hematite and gaseous hydrogen chloride, and shows how this unit operation can be applied

    Jan 1, 2016

  • CIM
    Quality control requirements for more reliable mineral deposit and reserve estimates

    By Deni Côte, Michel Dagbert, Marcel Vallée

    "Greater reliability of mineral deposit and reserve estimates can be attained through better quality control of the data and information acquisition, and the estimation processes. This paper reviews t

    Jan 1, 1993

  • CIM
    Crack Propagation in Thin Coatings Subjected to Contact Loading Using Dislocation Method

    By S. Rash Ahmadi

    Thin brittle coatings are deposited or developed on component surfaces for different reasons. In many practical applications the coatings are stressed by externally applied loads. Under such condition

    Oct 1, 2011

  • CIM
    Ground waste glass as a pozzolanic consolidation agent for mine backfill

    By E. M. De Souza, P. Lausch, D. O. DeGagné, J. F. Archibald

    "The potential use of industrial and municipal waste glass as a partial pozzolanic replacement for Normal Portland cement in mine backfill has been investigated. Considerable quantities of glass are c

    Jan 1, 1995

  • CIM
    Methanol concentration sensors for direct methanol fuel cell systems: A review

    By J. Shen

    Direct methanol fuel cells have been the subject of considerable research in the last decade. Performance levels realized in cells, stacks, and systems show that this technology is a promising power s

    Jan 1, 2005

  • CIM
    Discrete Modeling of Rock Fracturing for Various Modes and Mechanical Properties

    By J. Duriez, L. Scholtès, F. V. Donzé

    "Fracture propagation process in brittle rock is investigated by means of numerical simulations performed with an adapted formulation of the discrete element method. The progressive failure mechanism

    Jan 1, 2015

  • CIM
    Reagent Optimization for Improved Selectivity of Floating Copper Minerals against Pyrite

    By J. Ji, A. Shi, B. Grcic

    Floating copper minerals selectively against iron minerals such as pyrite has been challenging for most copper and copper/gold deposits, and many operations continuously strive to maximise copper reco

    Jan 1, 2019

  • CIM
    Conditioning of Fractured Rock Masses for the Excavation with EPB Shields

    By A. Chieregato, C. G. Oñate Salazar, D. Martinelli, D. Peila, M. Barbero

    This paper is aimed to confirm the possibility to excavate fractured rock masses by using EPB shields, even in presence of relevant water tables. This verification is based on laboratory test experien

    Jan 1, 2015