Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Transportation of Gravel for Back-Fill by Branch Aerial Tram

    By W. F. J. Cosser

    AN agreement having been arrived at in 1935 whereby McIntyre Porcupine Mines would purchase gravel for back-filling purposes from Hollinger Consolidated Gold Mines, the aerial gear as described below

    Jan 1, 1938

  • CIM
    The probability of economic success in exploring for tin deposits

    By Victor Rudenno

    "Previous methods have employed statistical analysis to model future mineral resources. The method presented in this paper uses Zipj's Law to determine the size and grade of tin deposits still to

    Jan 1, 1981

  • CIM
    An Approach to Assess and Control the Flotation of Minerals – Semiconductors

    By V. Panayotov, M. Panayotova

    "Finding a reliable relationship between fundamental properties of minerals of non-ferrous metals and their ability to float is extremely important. The approach presented in this work allows us to dr

    Jan 1, 2016

  • CIM
    A material balance calculation procedure for grinding circuit hydrocyclone selection

    "Process specifications for classification system design f or closed circuit grinding are identified. A computer-assisted, mass balance procedure for estimation of material size distributions and requ

    Jan 1, 1984

  • CIM
    Stope development for raise mining at the Namew Lake mine

    By D. Madsen, B. Salamondra, A. Moss, D. Etienne

    "Raise mining at the Namew Lake Nickel Mine in Manitoba uses 3 m diameter bored raises driven at 45 to 50 degrees dip for stope access and drilling. These raises are developed within the orebody on 20

    Jan 1, 1991

  • CIM
    Prognosis and maintenance management system for applications to aircraft engines

    By Raj Thamburaj, Li. Ping, Prakash C. Patnaik

    "An effective prognosis system for aircraft engines may involve the application of a wide range of technologies and methodologies, which may include: - On-line, real-time and in-situ non-destructive i

    Jan 1, 2004

  • CIM
    CIM Guidelines for the Reporting of Diamond Exploration Results (2003)

    "These guidelines, implemented in 2003, were recommended by the Diamond Exploration Best Practices Committee established by the Canadian Institute of Mining, Metallurgy and Petroleum. The guidelines a

    Jan 1, 2003

  • CIM
    Mass flow prediction for reagent control at Les Mines Selbaie

    By Robin Perry, Claude Bazin

    "Discrete transfer functions which use the grinding circuit feed tonnage to predict mass flowrates at reagent addition points in a flotation circuit were calibrated using a dynamic grinding/flotation

    Jan 1, 1994

  • CIM
    Hydrometallurgical Process for Treating Copper Concentrates at Sumitomo Metal Mining

    By S. Asano

    Hydrometallurgical processes for treating copper sulfide concentrates have attracted considerable attention over thirty years and many processes have been developed. However there have been still prob

    Jan 1, 2007

  • CIM
    An overview of wear-resistant alloys for the mining industry

    By J. B. C. Wu, B. McKee

    "Mining along with subsequent processing of the minerals often presents conditions where a wear- and/or corrosion-resistant alloy is needed to minimize downtime and maximize efficiency. This paper is

    Jan 1, 1997

  • CIM
    A plasma heater for the tundish of a continuous caster

    By C. Chapman, P. Cowx

    "INTRODUCTIONTetronics Research and Development Co. Limited has installed several plasma torches for steel heating in continuous caster tundishes. An extensive demonstration program on a 14 tonne tund

    Jan 1, 1989

  • CIM
    Logistic model applied to geophysical data for sulphide nickel exploration

    By R. Simard

    "Conventional exploration strategies identify many mineral deposits as potentially interesting, although only a few of them turn out to be of economic importance. In the context of exploration for sul

    Jan 1, 1980

  • CIM
    Designing for Closure And Beyond: The Perspective from Financial Institutions

    WHAT IF? ?Mine closure and reclamation liabilities were fully funded -at all times from current mine revenues ?Unexpected & catastrophic events were insured ?Remediation costs could be capped ?Ris

    May 1, 2006

  • CIM
    Environmental and Occupational Hygiene Considerations for High-Arsenic Metallurgical Testwork

    By H. Ardehali, P. Lind

    Many gold deposits also contain significant quantities of deleterious elements such as arsenic. Several biological pathways are possible for arsenic exposure; special care and caution must be used whi

    Jan 1, 2014

  • CIM
    An Intelligent System for Monitoring Tower Cranes on Construction Sites

    By M. A. Nadar

    Harsh and dynamic construction sites are generally equipped with cranes in order to rapidly and conveniently move heavy loads from one location to the other. If not properly inspected and managed, thi

    Aug 1, 2013

  • CIM
    Ceramics for the continuous casting of small cross section products

    By N. A. McPherson, P. C. Stevens, A. J. Rigby

    "There has been a consistent move in recent years to continuously cast small billets while utilizing ceramic stream protection between tundish and mould. The need to have ceramic stream protection has

    Jan 1, 1990

  • CIM
    Highly Efficient Gold (I) Complex Catalyst for Hydration of Alkynes

    By Eiichiro Mizushima

    Catalyst systems comprising (Ph3P)AuCH3 and acid co-catalysts were found to be highly efficient for hydration of alkynes to give ketones. Methanol was the best choice of solvents. Introduction Hydra

    Oct 1, 2003

  • CIM
    Conditional Bias of Geostatistical Simulation for Estimation of Recoverable Reserves

    By Jason A. McLennan

    Conditional bias is an infamous problem with estimation methods including kriging. Changing estimation parameters will mitigate, but not remove, conditional bias. The conditional bias of kriging is we

    May 1, 2002

  • CIM
    Two-Stage Fluid Bed Reactor for Arsenic Removal and Fixation

    By K. Adham, C. T. Harris

    Arsenic is often associated with copper, nickel and gold in sulphide deposits. This paper describes a two-stage high-temperature fluid bed reactor for the removal and fixation of As from ores and conc

    Jan 1, 2014

  • CIM
    The technical-scale realization of the Kivcet Process for lead

    By Kiran B. Chaudhuri, Michael Koch, Jorg Lema Patino

    "Stricter pollution regulations together with other factors have stimulated interest in the modernization of the traditional sinter - blast-furnace lead operation. In this context, direct smelting met

    Jan 1, 1980