Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Removal, Control and Management of Total Dissolved Solids from Process Effluent Streams in the Non-Ferrous Metallurgical Industry- A Review

    By V. “Ram” Ramachandran

    "In view of the increasing number of environmental regulations that have been promulgated all over the world in the last thirty years, non-ferrous smelters and refineries have had to learn and adapt t

    Jan 1, 2012

  • CIM
    An Evaluation of Flotation Reagents at the Majdanpek Copper Mine

    By P. V. Avotins, I. Djurkovic, D. R. Nagaraj, M. Grunjic, A. Day

    "As part of a major reconstruction and expansion of the Majdanpek Copper Mine, an investigation and optimization of the flotation collector regime was undertaken. The flotation response of the major m

    Jan 1, 1992

  • CIM
    The use of high frequency and minewide microseismic systems to monitor the movement of blasting induced stresses

    By P. N. Calder, D. B. Apel, S. D. Butt

    Mine-wide (MW) microseismic systems use widely spaced transducers to determine the source location and parameters of stronger microseismic events, while high frequency (HF) systems use fewer transduce

    Jan 1, 2000

  • CIM
    Study of Sphalerite Depression during Selective Flotation of Refractory Copper Zinc Ores

    By D. M. Wyslouzil

    "This paper was prepared for presentation at the 16th Canadian Mineral Processor's Annual Meeting, Ottawa, Ontario, Jan. 17 to Jan. 19, 1984.This paper gives an account of the development of treatment

    Jan 1, 1984

  • CIM
    Dynamic Management of Road Construction Operations on Site

    By R. Heikkilä

    Today road construction sites utilize more and more information modeling in design phases as well as model based 3-D machine control systems in site operations. For main contractor, the management and

    Aug 1, 2013

  • CIM
    A Study of the Reaction Mechanisms for the Iron Segregation Process

    By T. H. Etsell, P. Kerr, Qi Liu

    "The objective of this investigation was to study the reaction mechanisms during the reduction of iron oxides in the presence of calcium chloride and carbon black as a simplified iron segregation proc

    Jan 1, 2016

  • CIM
    Design and Materials Selection of Autoclaves and Auxiliary Equipment

    By P. Cheung, J. Gulyas, R. Clary

    Over the past 50 years, the use of autoclaves in the metallurgical industry has evolved from final metal recovery (hydrogen reduction) and purification (sulphide precipitate oxidation) to treating who

    Jan 1, 2004

  • CIM
    International mineral resource and mineral reserve classification and reporting systems

    By S. Felderhof, W. S. Vaughan

    "Over the years, it has been increasingly difficult for the minerals industry to raise the necessary capital for its activities. To alleviate this phenomenon, complete transparency and capital market

    Jan 1, 2005

  • CIM
    Sustainability-driven R&D in Zinc Hydrometallurgy: Remembering Lucy Rosato

    By George P. Demopoulos

    For more than 20 years the author had the privilege of working closely on a number of R&D projects with Lucy Rosato and her team at CEZinc. Several of these projects were driven from the sustainabilit

    Jan 1, 2015

  • CIM
    St. Andrew Goldfields

    By P. Massi

    "Wholly owned by the Coniagas Mining Company, the oldest continuously listed mining company on the Toronto Stock Exchange, St. Andrew Goldfields is located on Hwy. 101 approximately 30 miles east of d

    Jan 1, 1992

  • CIM
    The Design, Installation and Operation of a Tower Mounted Friction Hoist at Opemiska Copper Mines (Quebec) Limited

    Why A Friction Hoist? B EFORE discussing the equipment, it would be instructive to review the factors that influenced the management of Opemiska Cop-per Mines to purchase a friction hoist rather than

    Jan 1, 1962

  • CIM
    Elimination of the Pre-Aeration and Primary Filtration Circuits From the Dome Mill Flowsheet

    "Placer Dome Inc.'s Dome Mine is located in South Porcupine, Ontario and has been in production since 1910. In the past, the mill leach circuit was preceded by preaeration and primary filtration circu

    Jan 1, 1992

  • CIM
    Kennecott Utah Copper Smelter Rebuild Over 11 Million Tonnes of Concentrate Smelted

    By D. Janney

    Kennecott's Utah Smelter commenced operations in June 1995 utilizing Outokumpu Flash Smelting (FSF) and Kennecott-Outokumpu Flash Converting (FCF) technology. After some initial teething and equi

    Jan 1, 2007

  • CIM
    Mine Hoists in Canada

    By J. M. Whatley

    "IntroductionFEW COUNTRIES equal Canada in the diversity of its mineral output, the range of size of its mine operations, and the extremes of climatic and topographic conditions under which its mining

    Jan 1, 1955

  • CIM
    Factors affecting the conversion of calcium cyanamide to black cyanide

    By R. A. Bergman, C. A. Pickles, J. M. Toguri

    "Black calcium cyanide is utilized mainly as a reagent for gold extraction. It is produced by reacting calcium cyanamide, sodium chloride and calcium carbide at temperatures in the range of 1200°C to

    Jan 1, 2002

  • CIM
    Milliken?s Two-Stage Sulphuric Acid Leaching Process for Uranium Ores

    By N Robb

    This paper gives an account of the laboratory testing, plant testing and final inclusion of the two-stage sulphuric acid leaching process in the Milliken mill. Operational results for September, 1962,

    Jan 1, 1963

  • CIM
    Geological Setting of the NERCO Con Mine and the Relationship of Gold Mineralization to Metamorphism, Yellowknife, N.W. T.

    By D. W. McDonald, N. A. Duke, R. L. Hauser

    "Abstract- The NERCO Con Mine is situated in the amphibolite facies aureole of the Western Plutonic Complex overprinting the Yellowknife Greenstone Belt. Metamorphic grade of the upright monoclinal ba

    Jan 1, 1993

  • CIM
    Admixtures and other Factors Influencing Durability of Sprayed Concrete (Shotcrete)

    By Knut F. Garshol

    Quality and durability of sprayed concrete depends on the concrete mix design, the type and use of accelerator and all the aspects of the placement onto the rock surface in the underground working. A

    May 1, 2003

  • CIM
    Metallurgical Testing of Gold Ores

    By T. Salman

    Most authorities agree that the dissolution of gold from an ore takes place according to the Elsner equation first stated in 1846. The main requirements for the dissolution reaction to proceed are:(1)

    Jan 1, 1975

  • CIM
    Application of Skarn Deposit Zonation Models to Mineral Exploration

    By Lawrence D. Meinert

    Most large skarn deposits are zoned in both space and time relative to associated intrusions. Zonation occurs on scales from kilometers to micrometers, and re?ects in?ltrative ?uid ?ow, wall rock reac

    Jan 1, 1997