Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Underground Mine Radio Automation Systems

    By S Munn

    Today, it can be said that the majority of mines utilise communications equipment in one form or another. Either for communications between staff making their day-to-day operations more efficient, or

    Jan 1, 1999

  • AUSIMM
    Planning the Extraction of the Lead Orebodies Below 15 Level at Mount Isa

    By Clifford C. E

    The Black Star and Racecourse orebodies below 15 level contain a major portion of the primary silver-lead-zinc ore reserves of 56 million tonnes at 150 g/t Ag, 6.4% Pb and 6.5% Zn at Isa Mine. Extr

    Jan 1, 1979

  • AUSIMM
    Development of a remotely operated robotic mechanism for accessing and removal of metal tramp from primary gyratory crushers

    By H Lemos, E Nunes, D Jacobson, R Costa, L Ono, A Alves, H Delboni Jr

    Oversize rock breaking and metal tramp removal are key issues for reducing primary crusher downtime, as well as improving the safety associated with its operation. Remote operation of such tasks would

    Nov 8, 2021

  • AUSIMM
    The Mabilo Copper-gold-iron Deposit – A New Skarn Discovery in the Philippines

    By G Maude, R Ayres, R N McLean, N A. Reynolds

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Mabilo copper-gold-magnetite skarn deposit is located in southern Luzon in the Paracale

    Mar 18, 2015

  • AUSIMM
    2020 Vision ù The Manager of the 21st Century

    By E Hondros

    Innovation and Business Skills Australia (IBSA) commissioned The Boston Consulting Group (BCG) to undertake a study into how the role of AustraliaÆs senior managers is likely to change between now and

    Jan 1, 2006

  • AUSIMM
    Regular Measurement Defines Upgrades on Scrubber Screens

    By R Wilson, S Luke, R Williams, B Freeburn

    "In 2010, two McLanahan RSS14×50 scrubber screens were installed at Fortescue Metals Group’s (Fortescue) Christmas Creek site. By 2015, the trommel (screen) section had effectively reached the e

    Oct 10, 2016

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    Single pass drill, install and inject self-drilling resin bolt application in poor ground

    By T Roberts, D Faulkner, G Watt

    Traditional mechanised resin rock bolting in hard rock underground mines requires the installation of resin capsules into a pre-drilled hole prior to the rock bolt being spun into a hole to mix the re

    Nov 30, 2018

  • AUSIMM
    Improvement of the copper flash smelting furnace (FSF) and the slag cleaning furnace (SCF) process by advice-based control of silica and coke addition

    By A Specht, A Müller, V Montenegro, S Winkler, E Klaffenbach, A Schmidt

    In the process of primary copper smelting in flash smelting furnace (FSF), the ratio of iron to silica (Fe/SiO2 mass ratio) primarily determines the slag viscosity and magnetite formation. Viscous sla

    Aug 21, 2024

  • AUSIMM
    Management of Health and Safety in Tunnelling – Application of Australian Coal Mining Knowledge

    By G Marling, A Calderon, J Harris, P Kirsch, M Shi, D Sprott, A Kirsch

    Large-scale infrastructure construction needs to comprehensively manage risks that can impact the health and well-being of many people, from workers (temporary, contracted or full time), to families a

    Sep 17, 2014

  • AUSIMM
    Advanced Technology for Setting Out of Blastholes and Measurement while Drilling

    By D Xiong, G Xu, L Yao, F Wang, Y Duan

    The goal of this project has been to digitise and use drill parameter data from rotary drilling (measurement while drilling; MWD) for a more effective planning of the blasting process in surface mines

    Aug 24, 2015

  • AUSIMM
    Evaluating All the Alternatives to Select the Best Project Strategy

    It is well known that the ability to influence project value reduces significantly as planning progresses and decisions regarding project parameters are made. However, at the prefeasibility stage in p

    Jan 1, 2007

  • AUSIMM
    Embedding Geometallurgy into Mine Planning Practices – Practical Examples at Olympic Dam

    By H Bruyn, K Ehrig, V Liebezeit, A Robertson, M Smith, D Grant

    "The Olympic Dam geometallurgy program has generated a large quantity of data that has been used to create a geometallurgically enabled block model. An ongoing challenge is to convert data into usable

    Jun 15, 2016

  • AUSIMM
    Metallurgical test work – between a rock and a hard place

    By K Fiedler, A Newell, P D. Munro

    Test work is the foundation upon which the success of projects and subsequent operations is laid, reflected in Professor Arthur Taggart’s pithy observation: ‘Make your mistakes on the small scale and

    Aug 29, 2018

  • AUSIMM
    Above and beyond NPV – determining the life-of-mine from an economic perspective

    By C Tapia, B Hay

    There is a close relationship between the mining industry, economic growth, and technological and social development. Mining activities benefit all economic agents, but only during a timespan determin

    Aug 2, 2023

  • AUSIMM
    Are Your Megaproject Schedules and Costs Under – or Out of – Control?

    By P Mitchell, S Pushpan, G Ferres, K Bobbermien, L Hudson

    "Falling commodity prices and a rising supply surplus have ushered in a period of restraint in capital project investment across the global mining and metals sector. Competition for capital project fu

    Mar 8, 2016

  • AUSIMM
    Goldilocks – value of information for geoscience applied to coal in tactical time horizons

    By D Lucato, B Haase, R Saha, S Limberger-Forte, J Lishman

    Cadia East Mining operations have employed geometallurgical techniques to advance the understanding of the in situ rock hardness variability across existing Panel Caves (PC). Geometallurgy advances th

    Mar 22, 2022

  • AUSIMM
    Baseline Ground Settlement and Groundwater Monitoring for Tunnelling – A Case Study in Melbourne

    By I Lamb

    Past experience of ground settlement and groundwater monitoring for tunnelling projects in Melbourne has provided an appreciation of the value and importance to owners of establishing a broad baseline

    Mar 8, 2011

  • AUSIMM
    Filtration Test Work – Extracting the Whole Story for Studies and Design

    By G Bickert

    Australia is currently developing and engineering a range of specialised processing options for rare earth (RE) (Lynas, 2011, Alkane, 2005), zirconia (Alkane, 2005), lithium (Galaxy Resources, 2008) a

    Aug 8, 2011

  • AUSIMM
    Reverse circulation drill commissioning at Lihir open pit to provide data for medium term planning

    By M Akop, G Phillips, L Elliott

    An estimation geologist has many tools in their kit and using the correct one for the job is vital for creating a useful model. Reconciliation is a key step to monitor the performance of a resource mo

    Mar 22, 2022