Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Flotation circuit efficiency improvement at Northern Star Resources Limited’s Kanowna Belle gold mine

    By A Nugraha, H Thanasekaran, K Tatetdagat

    The Kanowna Belle gold mine is located in the Eastern Goldfields of Western Australia, approximately 18 km north-east of Kalgoorlie. The processing plant is designed to process 2 Mt/y and has the capa

    Aug 29, 2018

  • AUSIMM
    Excavating an Underground Primary Fan Chamber that is Adjacent to a Fully Operational Primary Fan in PT Freeport Indonesia's Grasberg Block Cave Mine

    By P Wahyono, H Vega, S Riza, P Vergara, P Gonzalez-Carbonell

    PT Freeport Indonesia (PTFI), operating in the Ertsberg Mining District in the Province of Papua, is developing the Grasberg Block Cave copper-gold mine. The site aims to output 160 000 t/d and will b

    Jul 1, 2013

  • AUSIMM
    Heavy Mineral Prospectivity in the Eucla Basin

    By B Hou

    The Eucla Basin in southern Australia is emerging as an important global source of zircon from heavy mineral sands. Understanding the geological evolution of the basin and movement of heavy minerals d

    Oct 5, 2011

  • AUSIMM
    Defying Gravity – Brownfield Continuous Improvement

    By J Robinson, L D’Uva

    "The Gold Fields group and Gekko Systems have successfully worked together on multiple projects, including at the St Ives, Agnew and Granny Smith operations in Western Australia, and the Damang operat

    Oct 10, 2016

  • AUSIMM
    A Study on the High-Water Solidifying Materials for Gob-Along Roadside instead of Coal Pillars

    By Yin J, Sun H

    A new technology has been introduced - the use of the High-Water Solidifying Material for providing pumped roadside supports to maintain a roadway for re-use in longwall retreating. As a gob edge s

    Jan 1, 1992

  • AUSIMM
    Open Pit Production Scheduling Optimisation - Why the Mining Industry Needs a New Phase Design Approach

    The long-term production schedule of open pit mines that maximises the net present value (NPV) of a given project relies on the proper design of phases (pushbacks) within the ultimate pit limits. Ther

    Dec 6, 2010

  • AUSIMM
    The effect of vane shear rotation speed on the estimation of tailings undrained strength

    By B Wentzinger, Y Keulemans

    This paper presents the results of a field study designed to assess the impact of vane rotation speed on the estimated undrained strength for two Australian bauxite tailings storage facilities. The va

    Jul 1, 2021

  • AUSIMM
    Macroinvertebrate Tolerance across a Range of Conductivities in the Isaac River Catchment (Central Queensland)

    By L Stitz, S Kinnear, L D. Fabbro

    Sensitive and tolerant species of macroinvertebrates were present across a wide range of conductivity concentrations in the Isaac River catchment in Central Queensland, indicating the need for further

    Nov 26, 2013

  • AUSIMM
    Mineralogy and Magnetic Susceptibility of the Proterozoic Granites, Related to Gold Mineralisation, Pine Creek Geosyncline, Northern Territory, Australia

    By Z U Bajwah

    During the Palaeoproterozoic, a large number of granitic intrusions were emplaced in the various parts of the Pine Creek Geosyncline (PCG). In the central region, the granitic magmatism is represent

    Jan 1, 1994

  • AUSIMM
    The Design of a Roadway Support System for Dynamic Loads of tremors and Rockbursts

    By Maloszewski J, Kidybinski A, Sawka B

    A forecast of mining conditions in Upper Silesia collieries for the beginning of the 21st century has special focus on average depth of mining, energy of seismic tremors induced by mining and ener

    Jan 1, 1988

  • AUSIMM
    Goodbye from the Argyle diamond deposit – insights from deep mining of the world’s largest diamond deposit

    By C B. Smith, G L. Boxer, S W. Moss, A L. Jaques, V Lorenz, M J. Rayner

    The Ernest Henry Iron Oxide Copper Gold deposit is hosted in a large dilation between two moderately dipping shear zones found in the footwall and hanging wall of the deposit. These shears are control

    Mar 22, 2022

  • AUSIMM
    Phosphorous Removal from Iron Ore with a Low Temperature Heat Treatment

    By R R. Lovel, G J. Sparrow

    Currently there are large reserves of good quality iron ore near to existing infrastructure that are not being developed because the phosphorous levels are above acceptable market specifications. Sinc

    Jan 1, 2009

  • AUSIMM
    Requirements for Coal in Japanese Coking Blends

    Japanese pig iron production in 1973 registered about 90 million tons. As clearly seen from the productivity (2.04 t/m3/D), and fuel ratio (494 kg/t-pig), the Japanese steel industry has maintained q

    Jan 1, 1975

  • AUSIMM
    Simulation study on crucial parameters of long-compressive and shortsuction ventilation in large section roadway excavation of LongWangGou coalmine

    By H Wen

    LongWangGou coalmine auxiliary inclined shaft heading face has a large section, fast heading speed, and large dust production. The problems of high concentration and wide distribution of dust in the r

    Oct 12, 2022

  • AUSIMM
    Aluminothermic production of silicon using different raw materials

    By M Zhu, G Tranell, N Simkhada, K Jakovljevic, M Wallin

    Silicon is a vital element in many products today, such as electronic components, solar devices, high-quality alloys, and many others. The growing global demand highlights the need for the development

    Jun 19, 2024

  • AUSIMM
    Advances in Copper Solvent Extraction

    The recovery of Copper by solvent extraction was arguably the most significant hydrometallurgical development of the 1960's. However, only dilute solutions at relatively high ph. could be trea

    Jan 1, 1989

  • AUSIMM
    Selective Extraction Dynamic Cone Algorithm for Three-Dimensional Open Pit Designs

    By Mogi G, Akaike A, Yamaguchi U

    A new algorithm has been investigated for three-dimensional open pit designs to improve the dynamic cone approach which utilises the dynamic programming technique. The conventional dynamic cone met

    Jan 1, 1995

  • AUSIMM
    Consolidation and shear strength testing and stability analysis of coal mine spoil degraded to mud

    By L Bergin, D J. Williams, S Islam, T A. Vangsness

    The flooding of open strip coal mines in the Bowen Basin and Hunter Valley Coalfields of Eastern Australia has the potential to soften the spoil and floor materials to produce “mud”. This mud can act

    Jul 23, 2018

  • AUSIMM
    Achieving Better Mine Closure Outcomes for Less Money

    By B Howard, M Jones, D Pershke

    "Current closure objectives and criteria are often difficult to achieve and are not delivering value for money outcomes at closure. Current mine closure processes tend to focus on rehabilitation and r

    Jul 16, 2014

  • AUSIMM
    Data cross validation for a newly commissioned dynamic drop test facility

    By D W. Evans

    Research into the dynamic properties of ground support elements continues to grow at a global level, given the increasing importance of this field of application within underground hard rock mining. M

    Nov 29, 2022