Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Process optimization of Mount Morgan gold tailing retreatment plantBy Hampshire MJ
The tailing retreatment project rated at 10 000 t/day commenced operations in October 1982. The operation consists of dredging, feed preparation, cyanide leaching and carbon-in-pulp (CIP) gold reco
Jan 1, 1986
-
High Pressure Particle Bed Comminution of Ores Minerals a ChallengeBy Kellerwessei H, Oberheuser G
A major breakthrough in extending the life of the wear material of high pressure roll crushers when treating moist, highly abrasive material has removed the last impediment to the widespread accepta
Jan 1, 1993
-
Underground Ore Handling SystemsBy B Olsson, C Glassock
Computer simulation modelling (discrete event) has been used at Olympic Dam (OD) to model the handling of ore from the point of extraction at the stope drawpoint through to the ore stockpile on the su
Jan 1, 2005
-
Mine Wastes as Cover Materials in a Water-shedding Soil Cover in North-West QueenslandBy T Baumgartl, C Gonzales, A Soliman, M Edraki
A soil cover isolates potentially acid-forming (PAF) mine wastes from atmospheric interaction and thereby mitigates acid mine drainage. As a cover that comprises either a single layer or a composite b
Jul 16, 2014
-
Specification and Selection of Hand-held Gas Monitors (Detectors) for Underground MinesBy D J. Brake
There are many sources of gas in underground mines including development and production blasting, strata gases, spontaneous combustion, diesel equipment, chemicals used for a wide range of functions,
Aug 31, 2015
-
Grade engineering at Gramalote gold deposit, Colombia: an example of industry – research collaboration, Part 1By N Clarke, J Hunt, A Barros, L Keeney
The Gramalote orebody is a large low-grade gold deposit situated in the San Roque municipality, 124 km north-east of Medellin in Antioquia, Colombia. It is jointly owned by AngloGold Ashanti (AGA) and
Nov 10, 2020
-
Mine Shafts – Planning, Optimising and ConstructingBy D J. Kilkenny
Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq
Mar 21, 2011
-
Attrition ScrubbersBy W Baguley
Attritioning has been a method of improving mineral extraction for over 60 years, however it is only recently that an understanding of the mechanism employed and the improvement in efficiency that hav
Jul 15, 2013
-
The Preparation and Consolidation of Tantalum PowderFollowing the preparation of tantalum oxide and carbide (1) an investigation of the details relating to the production of tantalum metal powder was planned. From the literature (2) it was evident that
Jan 1, 1946
-
An Integer Programming Model for Optimisation of a Heavy Media Coal Preparation PlantBy J Zhou
This paper discusses the implementation of a mixed integer linear programming model for a coal preparation plant. The plant considered consists of primary and secondary heavy media cyclones, hydrocycl
Sep 26, 2011
-
Increasing the Reliability and Safety of Mining Machines by Application of the Vibration Diagnostic (Experiences and Results)The reduction in the number and duration of machinery and equipment failures is an important source of economical efficiency enhancement in the Polish coal mining industry.Non-dismantling methods have
Jan 1, 1991
-
The Chemical Basis of Flotation (4f77fd10-2462-403e-873d-32f147f6cfd3)Dr Wark said: I have not come to Broken Hill to tell you how to conduct flotation operations; indeed, during my short stay here I have already learned much concerning the process, of the many difficul
Jan 1, 1994
-
Paste Fill Operations and Research at Cannington MineBy R Rankine
Backfilling with paste fill has been an integral component of open stoping at Cannington since commencement of operations. Efficient paste filling is critical to successful mining of the Cannington or
Jan 1, 2005
-
Plate Tectonics and the Precambrian-Phanerozoic Evolution of Australia (4c13f387-6abd-4480-92ff-9b1043445f21)Australian continental crust has accreted and consolidated by thirds: 1/3 during Archean time, 1/3 during Early to mid- Proterozoic time, and 1/3 during latest Precambrian to mostly Paleozoic time. Th
Jan 1, 1995
-
Some Notes on the Equipment of the Electrolytic Zinc Company of Australasia Limited, at Rosebery, TasmaniaThe purpose of this paper is to list by tabulation and flow sheet, the operating equipment and installations in use at Rosebery, and to refer to particular items which may be of interest for purposes
Jan 1, 1949
-
Development and Operations of the Coal Preparation Plant at MouraThe development of the Moura Coal Preparation Plant is described, commencing with the first'stage of the plant commissioned in 1963. The subsequent expansion stages are traced through to Octob
Jan 1, 1974
-
Telfer Project Process Plant DesignBy R Dunne, G Lane, S Ha, D Dreisinger
The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine
Jan 1, 2003
-
Prokaryotic Arsenic Metabolism ù Roles in Arsenic Cycling and BioremediationBy J M. Santini, I C. A Streimann
Arsenic is a naturally occurring element in the environment and is toxic to biological systems. Arsenic can exist in the environment in the following redox states, arsenite (+3), arsenate (+5), arsine
Jan 1, 2004
-
Current Billing Technology In Mineral ExplorationBy Emerson J
Drilling has always been one of the most important parts of the exploration process with most companies spending around 25% of their budget on drilling. Although superficially there appears to be
Jan 1, 1987
-
Stratigraphy of the Marra Mamba Iron Formation within the Chichester Range and its Implications for Iron Ore Genesis at Roy Hill - Evidence from Deep Diamond Drill Holes within the East Fortescue ValleyBy P Hawke, J Hurst, B KrapeP
Hancock Prospecting Pty Ltd (HPPL) drilled two deep diamond stratigraphic holes (ECD0001 and RHD0296) within the eastern Fortescue Valley in the Pilbara of Western Australia. Located south of the Roy
Aug 12, 2013