Search Documents

  • SME
    Carbon Emissions From Base Metals - Preprint 09-096

    By M. J. Farrell

    Mining is a significant emitter of greenhouse gases and is the focus of increasing attention from green groups and regulators. Miners need to know their own carbon emissions and how they compare with

    Jan 1, 2009

  • AUSIMM
    The Health and Safety in Employment Act 1992

    The need for legislative reform of health and safety legislation has been recognised in New Zealand for about a decade. Previous legislation did not cover all work places, many areas were excluded fro

    Jan 1, 1993

  • CIM
    Geophysical Case Study of Shallow and Deep Structures Based on Traditional and Modified Interpretation Methods: Application to Tectonic Studies and Mineral Exploration

    By J. Asfahani

    "The Schlumberger configuration used in geoelectrical sounding is slightly adapted here to obtain reliable data for both shallow and deep penetration depths from the same survey. In this configuration

    Jan 1, 2009

  • SAIMM
    Evaluation Of Elastic Deformation Energy In Stone Cutting Of Portuguese Marbles With A Diamond Saw ? Synopsis

    By P. Falcão Neves

    A detailed analysis of the geomechanical behaviour in rock cutting with a diamond saw is provided to obtain a better understanding of the mechanisms involved in the process. The energy of elastic def

    Jan 1, 2012

  • AUSIMM
    Improving Pelletisation of Pyrite Cinder by High Pressure Roller Grinding

    Improving Pelletisation of Pyrite Cinder by High Pressure Roller Grinding As an important secondary resource for ironmaking, pyrite cinder is characterised by coarse particle size, low specific surfa

    Sep 13, 2010

  • SAIMM
    Grid-Based Analysis of Seismic Data

    Quantitative seismology is an important tool for investigating mineinduced seismicity and the quantification of the seismic rock mass response. The spatio-temporal interpretation of seismic data withi

    Jan 1, 2014

  • SME
    Boddington Gold Mine Moves Closer To Production

    Construction of the Boddington Mine 130 km (81 miles) southeast of Perth, is about 89 percent complete. When the $2.9-billion development is finished, it will be the largest gold mine in Australia, pr

    Jan 1, 2009

  • AUSIMM
    Mobile Crushing and Screening Plant Applications for Small- to Medium-Sized Iron Ore Projects

    By D Connelly

    There is now a new generation of mobile crushing and screening plant systems available which have been developed based on the motivation of reducing truck haulage. Newly designed mobile crushing and s

    Aug 12, 2013

  • AUSIMM
    Sumps Aids the Broken Hill Proprietary Company Limited in Saxonvale Feasibility Study

    By G T. Kukla

    A Seam deposit User oriented Mine Planning System (SUMPS) was developed by The Broken Hill Proprietary Company Limited (BHP) at its head office in Melbourne. It is one of the computer mine planning sy

    Jan 1, 1980

  • SME
    2009 Permeation Test Results For Grouts Made With Ultrafine Cements

    By Raymond W. Henn

    The 30th annual short course ?Grouting Fundamentals and Current Practice? was held at the Colorado School of Mines, June 22-26, 2009. The field demonstration portion of the course was conducted June 2

    Jan 1, 2009

  • ISEE
    Blast Master Plan: the Key to efficiency and optimization. Case study at Ellatzite copper mine.

    By Grigor Mishev, Georgi Petrov, Benjamin Cebrian

    Before designing a single blast or all the blasts on a pit level, it is critical to assess the main goal on each. To do this, a series of constraints must be taken into account: wall protection, vibra

    Jan 1, 2016

  • SME
    The Potential Of GPS Guidance In The Mining Industry

    Recent advances in GPS, machine guidance technology and telemetry allow an unprecedented level of control of surface mining operations. GPS technology can now locate the bucket of a shovel or the blad

    Jan 1, 2004

  • NIOSH
    IC 8447 Secondary Gold In The United States

    The Bureau of Mines analyzed the cycle of secondary gold to determine the quantity of gold not being recovered from scrap, and to identify areas for research to increase the supply of gold from scrap.

    Jan 1, 1970

  • SAIMM
    Managing the Tap-Hole Life-Cycle at Five Submerged Arc Furnaces Producing Silicomanganese at Transalloys

    By J. P. Gous, J. J. Sutherland

    "Transalloys is a silicomanganese (SiMn) producer located in South Africa, and uses only local manganese ores to produce SiMn alloy. The plant operates five open submerged arc furnaces (SAFs) with an

    Jun 1, 2019

  • TMS
    Effects of Solidification Rate and Alloy Composition on the Cast Microstructure of Aluminum Alloy 5182

    By P. N. Anyalebechi

    The effects of solidification rate (0.4-26.1 K/s) and alloying elements on the cast microstructures of aluminum alloy 5182 have been investigated with directionally cooled laboratory-size ingots. The

    Jan 1, 2010

  • AUSIMM
    Evaluation of Grinding Medium Wear in Stirred Mills

    Evaluation of Grinding Medium Wear in Stirred Mills The standard fine grinding machines in the minerals industry are stirred mills whose performance largely depends on the competency of the grinding

    Sep 13, 2010

  • SAIMM
    Corrosion Protection Of Reinforcement For Concrete Structures (VOLUME 107)

    By R. E. Wilmot

    The problem of corrosion of reinforcement in concrete structures is internationally recognized and represents the single biggest expenditure in the preservation of steel reinforced concrete structures

    Jan 1, 2007

  • SME
    The Effect Of Frother Type And Concentration On The Water Recovery And Entrainment Recovery Relationship

    By J-P Franzidis

    A study was undertaken to determine the effect of five industrial frothers on the relationship between entrainment recovery and water recovery. The experiments were conducted using a Batequip rectangu

    Jan 1, 2000

  • NIOSH
    RI 9426 - Dust Considerations When Using Belt Entry Air to Ventilate Work Areas

    By Robert A. Jankowski, J. Drew Potts

    In this U.S. Bureau of Mines study, four underground respirable dust surveys were conducted to determine factors affecting belt entry dust levels and how using belt air to ventilate work areas affecte

    Jan 1, 1992

  • DFI
    PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History

    By Chris D. Shewmaker

    So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po

    Jan 1, 2004