Search Documents

  • CIM
    An Economical Vertical Transport System to Hoist 3 Mt of Ore per Annum from 1640 m

    By Wendy L. Naysmith

    This paper deals with the various options considered and factors that influenced the final selection of the headframe, shaft layout and hoisting systems required at the Impala No 16 Shaft in order to

    Oct 1, 2010

  • ISEE
    Deformation of An Explosively Driven Flat Metallic Flyer During Projection

    By Seokbin Lim

    In the design of explosives devices, an understanding of the behavior of explosively propelled matter is one of the most important steps in maximize the performance of these devices. For instance, an

    Jan 1, 2010

  • AUSIMM
    A New Look at Mineral Maps and the Potential Relationships of Extracted Data to Mineral Processing Behaviours

    By R Berry, N Bonnici, K Nguyen, S G. Walters, M Kamenetsky, C L. Evans

    Mineral maps produced via optical and scanning electron microscope û mineral liberation analyser (SEM-MLA) automated mineral identification systems are being used to examine the relationships between

    Jan 1, 2008

  • AUSIMM
    Characterisation and Processing of Electronic Waste for the Recovery of Metal Values

    Characterisation and Processing of Electronic Waste for the Recovery of Metal Values Electronic waste (e-waste), which is a hazardous waste, can indeed be a good source of metal values especially for

    Sep 13, 2010

  • AUSIMM
    Stacking and Reclaiming Facilities at the Thiess Bros Pty Ltd, South Blackwater Coal Mine from Conception to Operation

    By R Hoskings

    Conceptual studies of the run of mine stockpiling and reclaiming requirements commenced in 1975. Final selection of equipment was made in 1978 and the equipment was commissioned in June, 1979. Equipm

    Jan 1, 1980

  • ISEE
    The State of Human Annoyance at Blasting Works in Accordance with Environmental Conditions under Inclusion of Standards

    By Rolf Schillinger

    Blasting activities on the surface or underground necessarily involve the most sensitive aspect of environment remediation, human response or annoyance. Such effects are unavoidably characteristic of

    Jan 1, 2006

  • DFI
    Deep Excavation Retaining Systems In Unsaturated Soils

    By Tariq B. Hamid

    Deep excavation is commonly associated with construction of different deep below-grade structural elements (e.g., basement walls and slabs, tunnels, retaining walls, tanks, utilities, etc.) Deep Excav

    Jan 1, 2006

  • CIM
    The Use of Charcoal as an Alternate Internal Fuel Addition in the Pelletising Process

    By Keith R. Vining

    Solid fuel, usually coke or anthracite, is commonly added to ground iron ore fines in the pelletising process to reduce the amount of burner fuel required and the maximum firing temperature, while mai

    May 1, 2007

  • CIM
    Mining for Space Why now?

    By Michel Doyon

    Canadian Context: Exploration ??Space Exploration is within the unique mandate of the Canadian Space Agency ??Global partnerships ??Maintain close relationship with our partners ??New knowledge

    May 1, 2009

  • ISEE
    Innovative Blasting - Oversize Reduction at the Timbarra Gold Mine in Australia

    By G. Hames, A. Drake, B. Sampson

    The Timbarra opencut gold mine is located about 30 km(19 miles) southeast of Tenterfield in northern NSW some 4 hours by car from Brisbane, the capital city of Queensland in Australia. It was a small

    Jan 1, 2003

  • NIOSH
    Bulletin 221 Production and Briquetting of Carbonized Lignite

    By E. J. Babcock, W. W. Odell

    The Bureau of Mines since its establishment has always taken an active interest in the utilization of lignite and in the development of the lignite dep'osits of the United States. Extensive lignite fi

    Jan 1, 1923

  • AIME
    Drilling – Equipment, Methods and Materials - Mechanics of Differential Pressure Sticking of Drill Collars

    By H. D. Outmans

    A method has been developed for determining the relative water wet-tability (fraction of the surface wet by water) of porous media. This method involves the adsorption of methylene blue dye from an aq

  • ISEE
    Blast Site Security - International Society of Explosive Engineers 29th Annual Conference Safety Workshop February 5, 2003 Nashville, Tennessee

    By Unknown

    Blast Site Security Involves: * Clearing the area * Controlling Access * Warning Signals

    Jan 1, 2003

  • CIM
    Constrained Multivariable Control of a Pilot Flotation Column at the Laronde Concentrator

    By D. E. Calisaya, É. Poulin, A. Desbiens, R. del Villar, A. Riquelme

    "A 15 cm diameter by 732 cm height, fully automated pilot column was installed in the Agnico-Eagle’s Laronde concentrator (Québec), for evaluating the performance of newly developed sensors and advanc

    Jan 1, 2012

  • CIM
    Probabilistic practical optimization of production scheduling for multi-element deposits

    Optimizing production scheduling in open pit mines is important for managing cash flows of mining operations. This paper describes a new, probabilistic, mixed integer programming (MIP) formulation whi

    Jan 1, 2006

  • AIME
    Minerals In National And International Affairs

    By Elmer W. Pehrson

    Minerals have played a prominent role in the affairs of man and nations since time immemorial but with the advent of the industrial revolution, expanding use of the products of the mineral kingdom bec

    Jan 1, 1959

  • SME
    Rock Mechanics Of The Davis Detector Cavern ? Introduction

    By W. G. Pariseau

    This contribution describes rock mechanics features of the Davis Cavern at the former Homestake Mine in Lead, South Dakota, U.S.A. The mine is located in the northern Black Hills of South Dakota. In

    Jan 1, 2012

  • CIM
    Grinding Circuit Final Grind Control at Agnico Eagle Meadowbank Mine

    By Pathies Nawej Muteb, Tom Strombotne, Karl Leetmaa, Irma Gabric, Keith Darby

    "Continuous control of the final grinding product size is important to optimize gold liberation for Gold Milling operations. At Meadowbank Mine an on-line Particle Size Monitor has been employed succe

    Jan 1, 2017

  • ISEE
    Near-field Blast Vibration Response of Sensitive Pipelines

    By C. Sawmliana, P. Pal Roy

    Near-field blast vibration response of restrained pipelines either buried or exposed was studied during rock excavations at sensitive locations for Stage-II (4x500 MW) commissioning work in a super th

    Jan 1, 2001

  • CIM
    Acid Recovery in the Steel and Metallurgical Industry Process Characteristics and Fuel Saving Options

    By F. Baerhold, S. Mitterecker

    "Acid recovery is an important process step in pickling and leaching processes. Pyrohydrolysis in spray roasters and fluidized beds is a well-established technology to recover hydrochloric acid, but t

    Jan 1, 2016