  • CIM
    Wireless Communications in Mineral Processing Applications

    By Peter Metcalfe

    "Wireless communication in the mineral processing environment is not as simple as it is in the home or office environment. The correct design of a wireless network in the mineral processing environmen

    Jan 1, 2014

  • ISEE
    The Effect of Prill Specifications on Emulsion-ANFO Blends

    By Greg S. Williams, Richard W. Givens

    This paper examines the effect of prill size consistency, internal panicle density, and oil absorbency on Ammonium Nitrate Fuel Oil (ANFO)-emulsion blends. By analyzing these physical properties of pr

    Jan 1, 1992

  • SME
    Design Risk Mitigations for Contract CQ028 of the East Side Access Project

    By Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso

    INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p

    Jan 1, 2007

  • CIM
    Goldcorp’s Penasquito Pyrite Leach Project

    Peñasquito is Mexico's largest gold producer, consisting of two open pits - Peñasco and Chile Colorado - containing gold, silver, lead and zinc. Over the next three years, mining activities in the pit

    Jan 1, 2017

  • AUSIMM
    Geometallurgy - What do you Really Need to Know from Exploration through to Production?

    By K Ehrig

    You are a geologist, geometallurgist, or metallurgist/process engineer and are fortunate enough to work for an organisation who asks you to design/execute a geometallurgy program. What seems like a si

    Jul 15, 2013

  • AUSIMM
    Government Coodrination and Liaison: The Lihir Project

    By Van Dusen M

    The involvement of concerned parties in all aspects of the Lihir Project from an early stage has promoted good relations between all groups. Activities involving landowners, the Lihir community, t

    Jan 1, 1991

  • ISEE
    A Hydrodynamics-Based Approach for Predicting the Blast Damage Zone in Drifting as Demonstrated using Concrete Block Data

    "Rock falls involving a relatively small amount of material are a leading cause ofinjuries in underground mines in the United States. A contributing factor is unwantedblast damage and over-break. A go

    Jan 1, 2009

  • AUSIMM
    Removal of Horizontal Level Pillar by Means of Blast Hole Diamond Drilling at New Occidental Gold Mine, Cobar, N.S.W.

    By Creelman C. A

    The removal of a horizontal piIlar between Nos. 9 and 11 levels (1,116 feet from the collar of main shaft) was successfully carried out by blast hole drilling, and, to the best of the authors' kn

    Jan 1, 1944

  • ISEE
    Expansion of the Panama Canal

    By Tom Treleaven

    The widening of the Panama Canal to approximately 130 feet (40 m) for its entire length began just a few years ago. The original expansion program was slated for completion in 18 to 20 years, but has

    Jan 1, 1997

  • IIMP
    Permitting in mining projects and their challenges in Perú

    By Miguel Gutiérrez

    This paper will seek to provide an awareness of the challenges the permitting process presents to the engineering design for open pit mining projects in Perú. This awareness will create a better under

    Sep 21, 2013

  • SME
    Waterproofing of a Subsea Tunnel with a Unique Sprayable Membrane— The Nordöy Road Tunnel, Faroe Islands

    By Sigurd L. Lamhauge, Karl Gunnar Holter, Svein E. Kristiansen

    An innovative sprayable waterproofing membrane in combination with the traditional Nordic method of waterproofing with polyethylene foam sheets was used for the waterproofing of the tunnel. The spraya

    Jan 1, 2007

  • AUSIMM
    Coal and Coal Mining in New South Wales

    The State of New South Wales is highly favoured in having vast deposits of coal adjacent to and within easy reach of the coastal Ports. Not only is the quality of the fuel generally superior to any fo

    Jan 1, 1904

  • SAIMM
    DC Arc Smelting Of Silicon: Is It Technically Feasible?

    By M. Abdellatif

    Keywords: Pyrometallurgy, furnace, DC arc furnace, smelting, silicon The technical feasibility of silicon smelting in a DC arc furnace was investigated. A graphite-lined furnace was operated at p

    Jan 1, 2011

  • NIOSH
    Comparison Of Ore Pass Computer Simulations For Designs Against Dynamic Load

    By K. Biswas, S. Iverson, S. J. Jung

    Computer modeling of rock flow in ore passes is being investigated and compared using MSC Soft-ware’s Working Model 2D1 (WM2D) and Itasca Corp.’s Particle Flow Code in Two Dimensions (PFC2D). This wo

  • AUSIMM
    Real-time slurry elemental analyser for iron ore beneficiation plant control

    By E Portes, G Noble, J Roberto, A Stabile

    Iron ore beneficiation plants are facing economic pressures to treat more challenging ore types, improve efficiency and improve product quality. Better control and stability of the plant process in th

    Jul 24, 2017

  • AUSIMM
    Financial Assurance for Mine Closure - A New Zealand Perspective

    A variety of environmental financial assurance instruments are in use across the globe. This paper reviews some of the more common forms currently used in New Zealand, Canada, USA and Australia. In or

    Jan 1, 2006

  • DFI
    Piling Projects Constructed With Vinyl Polymer Support Fluid In Glasgow, Scotland

    By Derek J. Lennon

    Ground conditions in central Glasgow generally comprise loose granular deposits overlying stiffer soils. CFA piling would normally be preferred for urban sites in these ground conditions, but flightin

    Jan 1, 2006

  • TMS
    Hoboken Converter Performance Improvements At The Phelps Dodge Miami Smelter

    By Ovidiu Pasca

    The Phelps Dodge Miami Smelter utilizes four Hoboken converters to process molten matte from the Isasmelt vessel. This paper presents past and present improvements in operation, maintenance and proce

    Jan 1, 2005

  • CIM
    Prevention of Low Back Pain - A Challenge

    By C. Droun

    "Low back pains account for about 13 per cent of all compensation claims made to the Quebec Workmen's Compensation Commission and cost the employers a sum exceeding ten million dollars. The frequency

    Jan 1, 1973

  • CIM
    Back Caving Mechanism and Preventive Measures for Deep Open Stopes ? Case Studies

    By Jerry Ran

    Stope back caving in a mine using open stope mining interrupts the planned mining sequence and causes oversize muck and dilution with adverse economic implications. As many underground mines are minin

    May 1, 2004