Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Advanced Control Decision Tree (46th Annual Canadian Mineral Processors Operators Conference© , Ottawa, Ontario, January 21-23, 2014)By Michel Ruel
"This paper describes how to make advanced control choices when difficult processes need improvement. The decision-making process involves choosing between a rules-based approach and a model-based app
Jan 1, 2014
-
O Street Anchored Precast Lagging And Soldier Pile Retaining WallBy John Wise
Significant movement to an existing slurry wall which serves as a retaining wall on 'O' Street in Southeast Washington, D.C. initiated the Department of Public Works for the District of Colu
Jan 1, 2003
-
802.11 Wireless Site Survey Methodologies in an Underground Mine EnvironmentBy Mark G. Lafontaine
Underground 802.11 wireless communications has become widely adopted for automation and communication purposes but maximizing the wireless signal presents many obstacles given the harsh environment as
May 1, 2013
-
Recovery of Nickel and Cobalt by Pyrometallurgical Process of Waste from Producing Program of Nickel Metal Hydride BatteriesBy Hui Wang
With the great increasing use of nickel metal hydride batteries recently, the waste of this kind batteries have been paid for close consideration. For the main reason that the waste of the batteries c
Jan 1, 2009
-
Is Bigger Better? Building Market Resilience into Process Plant DesignBy P L. McCarthy
In an environment of accelerating capital costs, limited capital availability and strongly cyclic metal prices, there is a difference between a robust mining and processing operation and one that woul
Jul 15, 2013
-
Marine Minerals and Ocean Mining Potential in the North AtlanticBy Steinar L. Ellefmo, Fredrik Søreide
"The Norwegian University of Science and Technology (NTNU) and Nordic Ocean Resources AS, with support from Statoil ASA have carried out a project reviewing the knowledge about seabed mineral resource
Sep 1, 2014
-
Replacement of Classification Screens with Cyclones in the McArthur River Uranium Mine Grinding CircuitBy Ken Dyck, Chuck Edwards
"Cameco's McArthur River is the world's largest high grade uranium mine. Production started in late 1999. Cameco carried out the engineering design and construction management for the McArthur River p
Jan 1, 2004
-
Optimal Subsurface Investigation Approach for Overhead Transmission StructuresBy Haijian Shi, Drew Pizzo
This article focuses on the appropriate application of subsurface investigation methods for transmission structures, which are typically designed to resist lateral rather than vertical loads. Currentl
Jan 1, 2018
-
Journal: Musings of a Safety Philosopher Relating to Blasting SafetyBy Ralph Dawson
The following additions to SLP-4 “ALWAYS AND NEVERS” have been approved by the Board of Governors since the last printing 6/97 and will be included in the next printing soon. They are also included in
Jan 1, 2001
-
IC 9131 Foreign Direct Investment In The U.S. Minerals IndustryBy Louis J. Sousa
This Bureau of Mines report examines aggregate trends in foreign direct investment in the U.S. mining and mineral processing industries between 1977 and 1984, and provides an analysis of foreign inves
Jan 1, 1987
-
Horses for Courses – Tailoring Front End Design to Project RequirementsBy Paul Staples, Paul Messenger, Greg Lane
"Every project is different. While “conventional” SAG and ball mill circuits will suit many projects, for others there are alternatives, which may produce improved outcomes. This paper examines partic
Jan 1, 2008
-
Nuevaunión - Applying Capital and Infrastructure Synergies to Support Development of the Relincho and La Fortuna DepositsBy C. Velásquez, W. Bergholz, C. Spence, P. Lind
NuevaUnión SpA (NuevaUnión) is a development project located in the Huasco province of the Atacama region of Chile. It is held in a joint venture company owned 50:50 by Teck Resources Limited (Teck) a
Jan 1, 2019
-
Cummins Tier 4 TechnologyBy Evelynn Stirling
Agenda ? Emissions legislation ? Cummins Tier 4 Technology ? Cummins Experience with Technology ? Operation and Maintenance Impact The Emissions Challenge ? The 2014/5 emissions regulations pr
Aug 1, 2013
-
The use of wetlands for effluent polishing at Placer Dome, Campbell MineBy Benoit Bissonnette, David Gelderland
"The Campbell Mine Constructed Wetlands has been in full operation, processing effluent from the water treatment plant of the mill circuit for the last two years.The overall results are extremely posi
Jan 1, 2003
-
Technology implementation in eLearningBy A. J. Basu
New technologies, such as computer based learning, wireless computing, internet2, online courses, distance learning, and in general multimedia applications are being implemented in the higher educatio
Jan 1, 2003
-
Partial Roasting of Copper Concentrate with Stabilisation of Arsenic and MercuryBy K. Lundholm, M. Andersson, L. Nevatalo, Å. Holmström, L. Hedström
"Several copper deposits have the arsenic bearing minerals enargite (Cu3AsS4) and tennantite (Cu12As4S12). Since this mineral contain both arsenic and copper, it is not possible to remove the arsenic
Jan 1, 2014
-
Planning to Demonstrate Why High PPVs Work for Close-In BlastingBy Chris Breeds, Larry Leone, Jerry Wallace
Project Owners typically require General and Detailed Blast Plans when blasting close to important structures and specify the maximum allowable peak particle velocity for each potentially affected str
Jan 1, 2010
-
The identification of mineralized granitoid plutons from ore-element distribution patterns in regional lake sediment geochemical dataBy P. H. Davenport
"The ore-element patterns in regional lake sediment geochemical survey data from four areas of Newfoundland containing granite-related mineralization reveal characteristics which can be used to identi
Jan 1, 1982
-
IC 8576 Methods And Costs Of Coal Refuse Disposal And ReclamationThe Bureau of Mines is active in programs pertaining to solid waste disposal and land reclamation. Nine reclamation projects of mining companies and six projects of the Commonwealth of Pennsylvania we
Jan 1, 1973
-
Bulletin 36 Alaskan Coal ProblemsBy Walter L. Fisher
The public interest in the Alaskan situation is such that, with the consent of the President, I have concluded, at the request of the American Mining Congress, to make at this time a candid, if somewh
Jan 1, 1911