    Ground Control of a Mine Stope in Weak Rocks Subjected to High In-situ Stresses - A Case Study

    By Charlie Li

    A cut-and-fill mine stope, located at a depth of about 1000 m in a lead-and-zinc mine, was closed down because of large roof convergence and fractures appearing on the hanging wall. The instability pr

    Jan 1, 2005

  • SME-ICGCM
    Roof Monitoring In Limestone Mines-Experience With The Roof Monitoring Safety System (RMSS)

    By Thomas E. Marshall

    During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) examined and characterized conditions at a majority of the undergroun

    Jan 1, 2000

  • SME-ICGCM
    BHP Billiton Underground Ground Control Fatal Risk Control Protocol ? Development and Application

    By Dan Payne

    Roof falls and other ground control incidents make up a significant portion of fatal accidents in underground mines. BHP Billiton has undergone a review of all fatalities in their operations and divid

    Jan 1, 2006

  • SME-ICGCM
    Surface Subsidence Velocity of Fully-Mechanized Thick Seam Top Coal Caving Mining

    By Wenbing Guo

    Surface subsidence for fully mechanized thick seam top coal caving was measured, and surface subsidence characteristics were then analyzed. The subsidence initiation distance from the set-up room and

    Jan 1, 2011

  • SME-ICGCM
    A Computer Simulation Of Breakage Of The Main Roof In Longwall Mining

    By Deren Zhu

    Based on the results of field observation and physical model analyses, a computer simulation method, FEAEBP, has been developed for simulating the breakage of the main roof by considering it as a Kirc

    Jan 1, 1988

  • SME-ICGCM
    Mechanical Response of Split-Set Rock Bolts in Squeezing Ground

    Researchers from the National Institute for Occupational Safety and Health's Spokane Research Laboratory installed Split-Set rock bolts instrumented with strain gauges to document the mechanical

    Jan 1, 2005

  • SME-ICGCM
    Half a Career Trying to Understand Why the Roof Along the Longwall Face Falls in from Time to Time?

    By Russell Frith

    Probably the most expensive but least well understood roof falls in underground coal mining, are those that occur ahead of the powered supports in the centre of longwall face. Even small roof cavities

    Jan 1, 2005

  • SME-ICGCM
    The NIOSH Shield Hydraulics Inspection and Evaluation of Leg Data (Shield) Computer Program (7f22bea3-620b-4bd0-a4b9-04ee2b01eea7)

    By Thomas Barczak

    Longwall shields provide essential ground control in Iongwall mining, yet a high percentage of shields are operating at less than peak capacity and many at well below the rated support capacity due to

    Jan 1, 2002

  • SME-ICGCM
    Basics on the Dimensioning and the Extraction of Shaft Safety Zones

    By Anton Sroka

    The dimensioning of shaft safety zones is a substantial task of mining subsidence engineering. On the one hand, the coal reserves in shaft proximity are to be mined as complete as possible, because th

    Jan 1, 2005

  • SME-ICGCM
    Shear Bond Stresses Along Cable Bolts

    By Hani S. Mitri

    The behaviour of grouted cable bolts used for rock reinforcement as a means of ground control in hard rock mining is investigated. The study utilizes an analytical model which is based on the variatio

    Jan 1, 1990

  • SME-ICGCM
    Stability Evaluation Of Alternative Designs Of Drift-And-Fill Stoping In Zhaoyuan Gold Mine, P. R. China

    By Xianming Zhou

    Mining economics is such that too conservative in safety will result in a considerable penalty in mining cost. However, initial planning and design of a mining project often must be done without compl

    Jan 1, 1989

  • SME-ICGCM
    Integrity Factor Approach to Assess the Stability of Room-and-Pillar Mines

    By Kanaan Hanna

    The integrity factor approach was developed by the Bureau of nines to assess the stability of mine pillars and has been applied primarily to longwall chain pillars. Recently this approach was applied

    Jan 1, 1988

  • SME-ICGCM
    The Use of NDT Methods to Determine the Condition of Rockbolt Support During the Recovery of a Previously Flooded Coal Mine Roadway at Thoresby Colliery

    By Brian Clifford

    Thoresby Colliery is in the process of recovering an old roadway that was flooded following the closure of an adjacent mine. The aim is to re-use the roadway as a gate road for a longwall retreat pane

    Jan 1, 2002

  • SME-ICGCM
    The Technical Progress and Problems to Be Solved of Thick Coal Seam Mining in China

    By Jiacheng Wang

    The current state of thick seam coal mining methods is illustrated in three typical cases of thick seam longwall mining, each pointing out the outstanding achievements in top-coal caving mining and la

    Jan 1, 2011

  • SME-ICGCM
    Analysis Of The Seam Inclination Effect On Roof Stability

    By Hanjie Chen

    Mining experiences have shown that in a pitching seam, roof behavior is significantly different from a flat seam. Uphill mining usually experiences more roof problems than downhill mining. Based on a

    Jan 1, 2000

  • SME-ICGCM
    Evaluation of Rockburst Hazard from Core Testing

    By Michael Alber

    Coal resource extraction reaches higher depth of overburden and rockbursts as well as associated seismic events appear to become an additional problem to he addressed by ground control engineers. For

    Jan 1, 2004

  • SME-ICGCM
    Impact Of Horizontal Load On Shield Supports

    By Thomas M. Barczak

    A theoretical evaluation of the impact of horizontal load on shield support capacity is made from a static rigid body analysis of the shield structure. Parameters affecting horizontal support resistan

    Jan 1, 1984

  • SME-ICGCM
    Design, Monitoring And Evaluation Of A Pre-Driven Longwall Recovery Room

    By Tom Wynne

    In order to shorten the time required and improve safety for a longwall face move, a 36-ft wide longwall recovery room was predriven. The room was supported with specialty bolts, trusses and concre

    Jan 1, 1993

  • SME-ICGCM
    Intersection Stability and Tensioned Bolting

    By Yunqing Zhang

    Roof failure occurs much more frequently at intersections than entries and crosscuts. Using a commercial finite element package, four-way and three-way intersections reinforced with the tensioned bolt

    Jan 1, 2003

  • SME-ICGCM
    Practical Aspects Of Longwall Pillar Design

    By Christopher Mark

    The past decade has provided a wealth of practical experience with longwall pillar design. Design formulas developed specifically for longwalls have proven their value in numerous applications. Analyt

    Jan 1, 1990