Strata Movement Around Large Mining Height Face Area with Fully Mechanized Method in Steeply Dipping Thick SeamBy Yongping Wu
The steeply dipping coal seams in this paper refer to those with the angle of inclination ranging from 35° to 55°. The reserves of the steep coal seams account for approximately 15%~20% of the total c
Jan 1, 2014
-
Field and Laboratory Studies for Mechanised Depillaring Under Easily Caveable Roof StrataBy Ashok Kumar, Rajendra Singh, Arun Kr. Singh
"A simple analysis of site conditions and capability of the mechanised depillaring (MD) operation found that this approach is suitable to address the strata control issues in coal pillar extraction un
Jan 1, 2018
-
How Interface Friction and W/H Ratio Affect the Mode of Failure of Coal SpecimensBy Syd Peng, Gamal Rashed
"Bumps in coal mines have been recognized as a major hazard for many years. These sudden violent failures around mine openings have compromised safety, ventilation and access to mine workings. Previou
Jan 1, 2015
-
A New Approach To The Design Of Multi-Entry Developments For Retreat Longwall Mining (b0ac6f64-13ae-4c08-a631-b7e01a7e984e)By Frederick Carr
1. The application of retreat longwall mining to the North American coal mining conditions is be¬coming more advantageous as more experience is gained. The productivity results being achieved and pote
Jan 1, 1982
-
An Assessment of Coal Pillar System Stability Criteria Based on a Mechanistic Evaluation of the Interaction between Coal Pillars and the OverburdenBy Guy Reed, Russell Frith, Kent Mctyer
"Coal pillar design has historically been based on assigning a design factor of safety (FoS) or stability factor (SF) to coal pillars according to their estimated strength and the assumed overburden l
Jan 1, 2016
-
Ground Response As a Longwall Advances Into a Backfilled Recovery Room under Low CoverBy David F. Gearhart
A cooperative study was conducted between Signal Peak Energy and the National Institute for Occupational Safety and Health (NIOSH) to evaluate the behavior of a pre-driven recovery room under less tha
Jan 1, 2014
-
Numerical Modeling the Interburden Impact on Multiple-Seam Coal Mining in Western ChinaBy Jimin Su, Enguang Zhu, Kangning Zhang, Yang Li
"The effect of interburden on overlying strata movement during the mining of a lower group coal seam is still a challenge in China. Based on the multiple coal seams in western China, numerical simulat
Jan 1, 2017
-
Slope Stability at Open Cut Mining Due to Subsidence on Old Underground Mining AreaBy Andre Zingano
An underground mine using room and pillar and retreat mining methods was developed during the 1950?s. In 2009 an open cast mine was opened in the same reserve with the objective of mining five coal se
Jan 1, 2013
-
Numerical Simulation of Overburden and Surface Movements for Wongawilli Strip Pillar MiningBy Guo Wenbing
"INTRODUCTIONThere is a great amount of coal (about 140 billions tons) left unmined under the surface structures, water bodies, railways (referred to as the “three-body”). Coal mining under “threebody
Jan 1, 2015
-
Estimation of the Intact Strength of Coal Using Indirect MethodsBy Mark Van Dyke, Gamal Rashed, Khaled Mohamed, Timothy Barton, Morgan Sears
"The unconfined compressive strength (UCS) of coal is an important parameter that controls the stability of coal ribs in underground mines. Estimation of the UCS of coal units composing the rib is req
Jan 1, 2018
-
Ground Control Experiences in a High Horizontal Stress Field at Inland Steel Coal Mine NO. 2,By C. Thomas Blevins
This paper is intended to be a hands on experience account about ground control in a Southern Illinois coal mine. Its aim is to show how a combination of real world mining practices and constraints al
Jan 1, 1984
-
Reinforcement of Large Pillars by Bolting (8821999e-4c04-46db-a69e-e7a56781ac96)By S. J. Mitchell
An analysis of bolting reinforcement of several large [approximately 18 m (60 ft) cube] pillars was performed. The many overcoring stress profiles in pillars at the mine were used to produce generaliz
Jan 1, 1984
-
Establishment and Application of Deformation Monitoring System of Roadway Based on the Three?Dimensional Model ExperimentBy Yongping Wu
Roadway deformation and stress migration occur with uncertainty and randomness because of geology, tunneling and mining influence. In order to study the surrounding rock deformation and failure mechan
Jan 1, 2013
-
Investigating the Contributing Factors to Rib Fatalities Through Historical AnalysisBy Tristan H. Jones
Rib-related accidents in underground coal mines continue to cause injuries and take lives at a rate of 1.3 fatalities per year for the last 17 years. Prevention of these accidents cannot simply be a m
Jan 1, 2014
-
Numerical Model Simulation of a Development Pillar at a Steeply Dipping Underground Limestone MineBy Morgan M. Sears, Gamal Rashed, Jim Winfield, Brent Slaker
"Over the past decade, ground falls have resulted in five fatalities, representing over 40% of all fatalities occurring in underground stone mines in the United States. In conjunction with recent high
Jan 1, 2018
-
Measurements of Horizontal Shear Movements Ahead of Longwall Mining and Implications for Overburden BehaviourBy Jesse Puller, Ken W. Mills, Owen Salisbury
"An underground coal mine located in New South Wales has a target coal seam located 160-180 m deep directly below a 16-20 m thick conglomerate unit that has been associated with significant periodic w
Jan 1, 2015
-
Design of Roof Bolt Based Breaker Line Support in a Mechanised Depillaring PanelBy Sahendra Ram, Arnn Kr Singh, Dheeraj Kumar, Rajendra Singh
"Inherent existence of different rooms (openings) along the extraction line in a depillaring panel provides an easy path for the goaf to encroach the working area. Each of these openings in a mechaniz
Jan 1, 2016
-
Underground Longwall Mining with the Impact of Disturbed Areas by Abandoned Gateroads and Small GobsBy Enguang Zhu, Kangning Zhang, Yang Li
"Due to the use of outdated mining technology or room and pillar mining process in small coal mines, the coal recovery ratio is only 10% - 25%. In many regions of China: the damage area caused by the
Jan 1, 2016
-
Optimization of Chain Pillars Design in Longwall Mining MethodBy Kazem Oraee, Mehran Gholincjad, Navid Hosseini
"Chain coal pillars are pans of the structure of longwall mining system that play a significant role in the stability of the entries. With mechanization and developments in the various aspects of the
Jan 1, 2010
-
Instrumentation of a Roof Bolter Machine for Void Detection and Rock CharacterizationBy Soheil Bahrampour
Void detection and identification of bed separation while drilling holes in rocks for roof bolting can be a great source of information for the evaluation of ground conditions and adjustment of ground
Jan 1, 2013