Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    The Cost Relationship Between Performance Engineering And Human Behavior (3d1ba243-8fca-4851-9c33-561553d8028e)

    By G. T. Lineberry, W. J. Wiehagen

    A paradigm shift As market economists, mine managers are interested in "staying in business" and even "prospering." Bottom-line results are the "order of the day." Concern for bottom-line results c

    Jan 1, 1996

  • SME
    Black Mountain overview: The resolution of the lands unsuitable petition from legal and technical perspectives

    By M. M. Rajkovich, L. Adams, J. J. Zaluski, S. Gardner

    In 1998, a group called Kentuckians for the Commonwealth filed an Administrative Petition with the Kentucky Natural Resources and Environmental Protection Cabinet to designate 8,903± hm2 (22,000± acre

    Jan 1, 2002

  • SME
    Groundwater Problems And Their Solution At A Barite Mine In Southwest Arkansas

    By A. W. Mitchell

    Mining of a bedded barite deposit exposed highly pyritic siliceous sediments which have weathered and degraded subsurface and surface waters. The ph, sulfate, and total dissolved solids are the most s

    Jan 1, 1987

  • SME
    Productivity And Flexibility Of Bucket Wheel Excavators And Overland Conveyor Systems

    By H. M. Breza

    Utilization of Bucket Wheel Excavators and Overland Conveyor Systems to remove overburden provides increased productivity and flexibility to a surface mining operation. The utilization of such a syste

    Jan 1, 1993

  • SME
    Design Of Stillwater Mining Company's East Boulder Mine

    By B. Strickland

    The decision to accelerate development of Stillwater Mining's East Boulder Mine was made in March of 1998. It required the completion of conceptual designs by July of 1998. This was accomplished

    Jan 1, 1999

  • SME
    Lake Tap Shaft

    By B. Campbell

    This paper will detail the successful construction methods of a 20- foot diameter wet well shaft, approximately 180 feet deep in overall depth and 150-feet below the water table, adjacent to Lake Naci

    Jan 1, 2010

  • SME
    The exergy decrease of the mineral capital endowment due to raw-material production

    By Al. Valero

    This paper quantifies in universal units (energy units), the annual decrease in the mineral endowment of the planet. This is done for some important extracted non-fuel minerals, namely aluminium, coba

    Jan 1, 2011

  • SME
    Loblolly Pine Seedling Response To Overburden Types And Management Practices

    By R. W. Draves

    Planning and testing in advance of the mining operation are essential. This advance work can involve physical and chemical analysis of overburden cores, field test plots, green- house studies or any o

    Jan 1, 1985

  • SME
    Preventing Tunnel Methane Explosions - What's Most Important

    By Gerrit V. R. Goodman, Fred N. Kissell

    The Bureau of Mines has evaluated the effectiveness of the safety elements used to prevent tunnel methane explosions. These fa1l under the general categories of better ventilation, better gas monitori

    Jan 1, 1991

  • SME
    The Reduction Of Kaolin Slurry Viscosity Using Pugging And Desliming

    By R. A. Lowe

    The low-shear viscosity of kaolin slurries is one of the principal characteristics that determines whether the clay can be utilized for paper and ceramic applications. In this work, causes of poor low

    Jan 1, 1998

  • SME
    Stillwater Mining Company's Pt-Pd Flotation Mill

    By Gregg J. Hodges

    The Stillwater pt-pd mine and flotation mill are located about 130 km (80 miles) southwest of Billings in Stillwater county, M6ntana~ The pt-pd ore zone stretches about 43 km (27 miles), but varies in

    Jan 1, 1988

  • SME
    Dry Fine Coal Cleaning Using Rotary Triboelectrostatic Separator (RTS)

    By D. Tao

    Coal is a major source of energy in the U.S. and more than 51% of the electricity used in the country is generated from coal. Coal cleaning prior to combustion is necessary and often accomplished usi

    Jan 1, 2010

  • SME
    Engineering, Geologic And Hydrologic Characteristics Of Lake Bonneville Sediments, Utah

    By A. E. Kurie

    The Great Salt Lake occupies about 1000 square miles whereas its predecessor, Lake Bonneville occupied 20,000 square miles and its shoreline reached 1000 feet above the present lake level. The sedime

    Jan 1, 1967

  • SME
    Treatment of Mine Drainage Water Using a Combined Passive System

    By Fernando Pendás, Jorge Loredo, Alumudena Ordóñez

    Water derived from mine-tailings typically contains high concentrations of H+, SO4, Fe and other metals, and it frequently suffers a decline in pH and the development of acidic mine drainage (AMD). A

    Jan 1, 2000

  • SME
    Two Dimensional Simulation By Turning Bands

    By Peter I. Brooker

    The turning bands method for the simulation of spatially correlated data in two or three dimensions requires that the relation- ship between the covariance obeyed by the realizations first generated o

    Jan 1, 1984

  • SME
    Geology and Mineralization of the Grasberg Porphyry Copper-Gold Deposit, Irian Jaya, Indonesia

    By S. D. Van Nort

    Editor’s note: This is the first of two MINING ENGINEERING articles about the Grasberg deposit. The second, focusing on open pit mine development, will appear in the April issue of the magazine. T

    Jan 1, 1991

  • SME
    Mechanism of Advancing Drift on Weak Ground Excavation - RETC2021

    By Sadatoshi Ohmori, Karen Shinoda, Nobuharu Isago

    Method of tunnel excavation is generally classified such as full-face excavation, bench-cut excavation, diaphragm with center pillar excavation, center drift advancing excavation and so on. These exca

    Jun 13, 2021

  • SME
    Project Development Process-An Overview

    By David A. Milligan, William Cobb

    2.1 INTRODUCTION This chapter provides the reader with a sense of how a heap leach project may make an orderly, and hopefully non-traumatic, transition from discovery or acquisition to project constru

    Jan 1, 1988

  • SME
    Gold Skarn Deposits Of The Elkhorn District, Jefferson County, Montana

    By C. I. Everson

    The Elkhorn mining district is located 35 kilometers southeast of Helena, Montana, on the southeast edge of the Boulder Batholith. Geologically the district consists of a folded sequence of Paleozoic

    Jan 1, 1992

  • SME
    Mineralogical Examination Of The Bacterial Leaching Progress On Base-Metal Sulphide

    The paper presents results of the mineralogical examination on samples from a bacterial leaching test which simulated in situ leaching for 482 days. Rock fragments (15 to 20 cm) were obtained from the

    Jan 1, 1991