Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Study Of Mesh Ordering Techniques For Mine Ventilation Network Solution MethodsBy Jeong-Heum Kim, Jan M. Mutmansky
A number of solution methods for solving the nonlinear equations derived from mine ventilation networks use meshes selected from the network as the basis of the solution techniques. Mathematicians wor
Jan 1, 1993
-
Breakage Rates and Size Distributions in Dry Ball Milling for Fine SizesBy I. Shah, L. G. Austin
A method for quantitative investigation of the phenomena involved in fine grinding of materials that follows the changes in the breakage rates of fine particles has been presented. For relatively har
Jan 1, 1983
-
Preexcavation Deep-Hole Stress Measurements For Design Of Underground Chambers--Case HistoriesBy Bezalel C. Haimson
Long before excavation begins, the in situ stresses in the horizon of planned underground chambers can be measured by employing the hydrofracturing technique in existing exploratory holes. Such measur
Jan 1, 1976
-
2. Computing and Operations Research Techniques for Production Scheduling - Classification Of TechniquesBy Jan M. Mutmansky
While production scheduling for both surface and underground mining operations is similar in nature, a rather large array of techniques is applied in solving such planning problems. The techniques con
Jan 1, 1979
-
Hydrological Consideration Of Groundwater For Planning Of Mine Sealing At Japanese MineBy Makoto Terada
The most important consideration in planning the plugging and sealing of a mine for mine water control is to predict the water flow from the mine. For this purpose, a method of numerical analysis on t
Jan 1, 1982
-
Commercial Demonstration Of The Granuflow™ Process For Improved Fine Coal RecoveryBy David Akers, Clifford Raleigh, Glenn Shirey
Under a Cooperative Agreement with the U.S. Department of Energy’s National Energy Technology Laboratory (NETL) and the Mining Industry of the Future Program, CQ Inc. is demonstrating the GranuFlow™ p
Jan 1, 2005
-
Raman Spectroscopy of Electrochemically Oxidized Pyrite and Optimum Conditions for Sulfur FormationBy F. M. Doyle, Jun Li, Milton E. Wadsworth, E. Peters
The Raman spectroscopic technique was used to study electrochernically oxidized pyrite in-situ. It was found that Raman-active sulfur oxidation products could be detected after a proper potential was
Jan 1, 1993
-
Subsurface Investigations Utilizing Large Diameter Borings For The Price Road Drain TunnelBy Gary S. Brierley, Ronald E. Romley, Alan L. Howard
The Price Road Drain Tunnel in Tempe, Arizona is part of the drainage system constructed in conjunction with the Outer Loop Highway in metropolitan Phoenix. The Outer Loop Project is a part of a much
Jan 1, 1991
-
5. Planning Technique for Western Surface Coal Mines - A Case Study ? IntroductionBy R. Larry Davis
Over the past decade there has been a continual decrease in domestic oil reserves accompanied by a sharp increase in the demand for energy. Even with increased imports of foreign oil, the energy deman
Jan 1, 1979
-
Process Options And Market Considerations For Paper Grade Kaolin From Minnesota ResourcesBy M. S. Prasad, K. J. Reid, M. P. Katsoulis
The State of Minnesota is interested in stimulating the development of clay resources and recently supported a two-year project to collect data on geological, mineralogical, processing, economic and e
Jan 1, 1992
-
Characterization Of Deep Bed Filter Media For Oil Removal From Produced WaterBy C. H. Rawlins
Deep bed media filtration is used as a tertiary treatment step (after hydrocyclones and flotation cells) to remove fine oil droplets and solids from oilfield water before reinjection disposal or to re
Jan 1, 2010
-
A Method Of Designing Auxiliary Ventilation Systems For Long Single Underground OpeningsBy Pierre Mousset-Jones, Felipe Calizaya
The design of an auxiliary ventilation system for long underground openings (drifts, ramps and shafts), often requires the installation of multiple fans. The fans are installed in series and separated
Jan 1, 1993
-
A Core Bend Specimen With Chevron Edge Notch for Fracture Toughness MeasurementsBy Finn Ouchterlony
INTRODUCTION Much of present fracture toughness testing con¬cerns chevron notched specimens (Newman Jr., 1984) since these, in principle, require neither fatigue precracking nor more registration t
Jan 1, 1986
-
Challenges in the Design of Segmentally Lined Tunnels for Combined Sewer OutfallsBy Anthony Harding, Rodolfo D. Aradas, Juan M. Fernandez, Darío Tsingas
"The adoption of tunneled combined sewerage interceptors and outfalls leads to design linings which are often subject to internal pressures that are larger than the external pressures, resulting in si
Jan 1, 2016
-
Instrumentation Used To Control Excavation And Rock Bolting For Underground Subway StationBy Edward J. Zeigler, John T. Miller
INTRODUCTION Construction of Phase I, Section A, of the Baltimore Region Rapid Transit System required that six underground stations be built using a cut and cover excavation technique. For five of
Jan 1, 1981
-
Site Evaluation For Cavability And Underground Support Design At The Climax MineBy John T. McDonough
The Climax Mine of AMAX's Climax Molybdenum Division is currently producing approximately 34,000 tons of molybdenum ore per day from two underground levels (see Figure I), and initial design is u
Jan 1, 1977
-
Cleaning and Utilisation Of Coals for Low Emission at Swedish Power PlantsBy K. S. Eric Forssberg, Lennart Ryk
The paper discusses coal utilisation in Sweden. All hard coals have to be imported from other countries. Peat from domestic sources is used as a complement. Environmental legislation and taxation on f
Jan 1, 1995
-
Design And Construction Of A Bulkhead For A Simulated Underground Leaching StopeBy J. F. Able, F. Djahanguiri
The US Bureau of Mines conducted research on underground stope leaching of metalliferous ores. Leaching underground would minimize the environmental impact of ore processing on the surface and would m
Jan 1, 1998
-
Comparative Analysis of 3d Domain Modelling Alternatives: Implications for Mineral Resource EstimatesBy M. Tokoglu
Accurate estimation of resources is one of the major challenges in mineral project evaluation. Contemporary mineral resource estimation practice calls for contribution from several disciplines and exe
Jan 1, 2019
-
Method of Estimating Optimum Economics for In-Situ Leaching (ISL) of CopperBy D. H. Davidson
In situ leaching (ISL) of copper has the potential of reducing both capital and operating costs for copper production. The ISL process combines surface facility (SX/EW) and wellfield operations, each
Jan 1, 1988