Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Anticipated Ground Conditions for the Riverside Badlands TunnelBy D. B. Desai, J. T. Waggoner, J. S. Hill, R. R. Redd, S. J. Klein
The 13 km (8 mile) long Riverside Badlands Tunnel is planned for construction starting in 1998. Extensive geotechnical investigations indicate that the 3.7 m (12 ft) finished diameter tunnel will be
Jan 1, 1997
-
Computer Based Decision Support Systems For Underground ConstructionBy Photios G. Ioannou, Guillermo F. Salazar, Herbert H. Einstein, Yeong W. Kim
The MIT tunneling group has developed, over the past decade, a number of decision support tools for the geologist and engineer, planner and designer, owner and contractor involved in underground const
Jan 1, 1987
-
Development Of Equipment For Measuring Time-Dependent DeformationsBy M. W. Chanda
This paper presents the development of a rock-creep measuring apparatus using air as the initial pressure source. Servo-controlled machines can and have been used for time-dependent property tests. Ho
Jan 1, 1993
-
Planetary Mill Grinding for the Production of FillersBy Raj K. Rajamani, M. K. Abd El-Rehman
The planetary mill is very much suited for the ultra-fine grinding of mineral fillers. Ultra-fine grinding here refers to grinding powders to a size range 5-1 0 rnicrons. Such powders enhance the qual
Jan 1, 2003
-
Successful Project Team Integration for Riverside Badlands TunnelBy Drupad B. Desai, James G. Gallanes
A key component of the Inland Feeder Project is the Riverside Badlands Tunnel, a7.9-mile stretch subjected to high internal and external hydraulic pressures passing beneath highly eroded hills in a se
Jan 1, 1997
-
A Micro-Hemolysis Assay For Monitoring Mineral DustsBy L. Rainey, W. E. Wallace, B. L. Razzaboni, P. Bolsaitis, V. Vallyathan
The hemolytic activity of milligram-sized mineral dust samples from coal mines collected in personal dust samplers were measured by a modified Harington assay method which increases the sensitivity of
Jan 1, 1991
-
Novel Solid-Phase Materials For Selective Copper RecoveryBy E. S. Peterson, M. K. Harrup, K. A. Dolbeare, J. E. Wey
Efficient methods for the removal of copper from heap-leach solutions without mobile organic phases are a current mining industry need. To satisfy this need, a selective, high-capacity, durable solid
Jan 1, 2003
-
Hydraulic Fracture Model for Application to Coal SeamsBy P. E. Nielsen, T. L. Loga, B. B. Mauko
A numerical model is presented which simulates the dynamic fracturing process for a circular geometry fracture in a uniform stress medium. The dependence of crack aperture and net pressure in the crac
Jan 1, 1986
-
Setting priorities for mine safety and health researchBy R. L. Grayson
In 1995, the United States Congress abolished the Bureau of Mines in the US Department of Interior. But Congress preserved the safety and health research functions being performed at the Pittsburgh an
Jan 1, 2000
-
A Computer Program For Estimating Costs Of TunnelingBy Frank T. Wheby, Edward M. Cikanek
A computer performs all logic and computations customarily done by hand in preparation of engineers' estimates or contractors' bids on tunnel-shaft systems. The program described is based on
Jan 1, 1974
-
A Self-Organizing Controller For Process pH ControlBy Raj K. Rajamani, Ilesh M. Shah
Maintaining pH, a routine requirement in many industrial processes, is by no means trivial. The control is troublesome because of the inherent nonlinearity and frequently changing process dynamics. Ma
Jan 1, 1990
-
Atlanta—Plain Train Tunnel West Extension Project— Progressive Design-Build Risk Management Approach - RETC2023By Jake Coibion, Elmira Riahi, Dominic Reda, Walter Klary, Vojtech Gall
Progressive Design-Build is becoming a more common delivery method in the tunneling industry. This approach allows the Owner to select a design-builder primarily based on qualification instead of lowe
Jun 13, 2023
-
Partial deoiling process for beneficiating dolomitic phosphate pebbleBy S. S. Hsieh
As part of a program to address the long-term need to ensure adequate supplies of domestic phosphate raw materials, the Tennessee Valley Authority (TVA) has conducted considerable research on dolomiti
Jan 1, 1991
-
Triaxial-Loading Measurement for Mine-Pillar Stability EvaluationBy Paul H. Lu
This paper proposes a novel method, "integrity factor approach," of mine-pillar stability evaluation based on in situ triaxial-loading measurement. The pillar integrity factor is defined as the quotie
Jan 1, 1986
-
Conditional Simulation Method For Design Of Blending PilesBy Flavio Moreira Ferreira
In mining industry, one of the simplest methods to smooth the standard deviation of a given ore controlled property is to build longitudinal blending piles. The effect of homogeneization is obtained d
Jan 1, 1992
-
Bivariable Planetary Cutter-Head Concept for Shaft BoringBy D. Gu
Breakage of rock by machine is one of the major methods of excavation. With the development of modern engineering techniques, the advantages of using this method have become even greater. Improving ef
Jan 1, 1995
-
Man-Sized Inspection Holes For Assessing Tunneling ProblemsBy Ted M. Noskiewicz, James A. Ramsay
INTRODUCTION During the various stages of an underground project from inception through design and construction, probably the single factor of most interest and concern is the nature of the ground.
Jan 1, 1979
-
Evaluation of the coal strength for pillar calculationsBy K. P. Unrug, E. Thompson, S. Nandy
The method of coal pillar design involves primarily two aspects: the geometry of the pillar and the strength of the coal. However, the strength of the coal has to be emphasized with respect to the ent
Jan 1, 1987
-
2016 MPD Student Poster Contest Reviewed Abstracts Mineral & Metallurgical Processing Division Society for Mining, Metallurgy & Exploration Inc. February 24, 2016, Phoenix, AZ. Foreword by Ren Bryce"The seventh annual Mineral & Metallurgical Processing Division (MPD) student poster contest was held last February at the SME Annual Conference & Expo in Phoenix, AZ. A total of 21 students entered t
Jan 1, 2016
-
Cost Calculations for Underhand Cut-and-Fill MiningBy Gordon M. Pugh, David G. Rasmussen
INTRODUCTION This method is a variation of cut-and-fill mining where either the wall rock or the vein is too unconsolidated to permit safe mining by conventional cut-and-fill methods. Basic develo
Jan 1, 1982