Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Influence of Early Ring Closure of Center Drift on Main Tunnel Excavation Under High Overburden Conditions - NAT2024

    By Sadatoshi Ohmori, Simin Zhai, Devini Abeyawardena

    A road tunnel is planned to be constructed in soft, high overburden ground of around 600 m in Japan by using the center drift advancing method. The dodging effect and early ring closure of the center

    Jun 23, 2024

  • SME
    Risk assessment for dragline productivity: a case study of GLI’s draglines in Turkey - SME Transactions 2011

    By H. S. Duzgun, N. Demirel

    Estimating productivity of a walking dragline is of paramount concern to mining engineers and mine planners. Risk based evaluation of the dragline productivity is a valuable tool to estimate the dragl

    Jan 1, 2011

  • SME
    Kinetics Of Beryllium Extraction From A Low-Grade New Mexico Ore

    By K. H. Lee

    The rate of beryllium dissolution from a low-grade ore was studied in sulfuric acid solutions. The effect of stirring speed, sulfuric acid concentration, particle size and temperature on the rate of d

    Jan 1, 1988

  • SME
    A Rapid Computational Procedure For Unsteady-State Ball Mill Circuit Simulation

    By L. G. Austin

    A simple finite difference algorithm has been used to compute a simulation model for unsteady-state ball milling. The model considers the mill to act as if it were three fully-mixed reactors in series

    Jan 1, 1984

  • SME
    Management of Explosion Risks in Underground Coal Mines with the use of Bag Barriers

    By J. R. Schafler, J. L. Brinkman

    "Since the year 2000, 59 miners have lost their lives to explosions occurring in underground coal mines in the US. More accurately, those explosions were methane ignitions that propagated through the

    Jan 1, 2017

  • SME
    A Computer Design Of Ultimate Pit Limit By Using Transportation Algorithm

    By Panlop Huttagosol

    The use of computer models to design ultimate pit limit of an open pit mine during its feasibility study has become an emphasized procedure in mining. It is a normal practice in open pit mine design t

    Jan 1, 1992

  • SME
    Wet Counter Flow Microfine Classification In A Centrifuge

    By Dirk Timmerman, Klaus Schönert

    This paper reports on the results of research on counter flow classification of - 10 µm particles. Two classifiers were designed and constructed, the first semicontinuous and the second fully continuo

    Jan 1, 1995

  • SME
    Prevention Of Silver Jarosite Formation Through The Addition Of Iodine Species

    By G. Van Weert

    Refractory ores and concentrates containing silver tend to form Ag-jarosite during autoclave oxidation. Silver extraction from the oxidation products is therefore low, unless a hot lime treatment step

    Jan 1, 1993

  • SME
    Nickel Deposits In New Caledonia Some Factors Influencing Their Formation

    By G. Troly, M. Esterle, B. Pelletier, W. Reibell

    In New Caledonia, ultramafic formations occur on 7,000 square kilometers. Weathering of peridotites leads to profiles of alteration and nickel concentrations. Complete profiles are composed of two

    Jan 1, 1979

  • SME
    Bench Scale Optimization Of Mixing Variables During Anionic Conditioning Of Florida Phosphates (10ca4947-7da7-47de-a8a4-2b2c068d42f6)

    By R. M. Damodaran

    The flotation performance of Florida phosphate rock was evaluated in terms of the mixing behavior of reagents with particulates during anionic conditioning of phosphate slurries. The various condition

    Jan 1, 1995

  • SME
    Geology And Geochemistry Of Molybdenite Mineralization At Questa, New Mexico

    By Robert W. Leonardson

    The Questa Molybdenite Mine provides a unique opportunity to study the geochemical dispersion of various hydrothermal events, utilizing drill hole analyses. Numerous post-ore factors have altered the

    Jan 1, 1984

  • SME
    Spider Excavator Pilot Study for Removal Action Planning at Abandoned Uranium Mine Sites - SME Annual Meeting 2025

    By Key Rosebrook, Jennifer Laggan, Ashley Rivera

    Significant quantities of waste rock at abandoned uranium mine (AUM) sites in the western United States require removal from steep slopes exceeding 45 degrees in remote locations. This prevents the us

    Feb 1, 2025

  • SME
    Stress Variations And Stability In A Western U.S. Coal Mine

    By H. Maleki

    The U.S. Bureau of Mines pioneered the use of borehole deformation gauges and overcoring techniques to measure in situ stress. These measurements provide input to structural mine design and support se

    Jan 1, 1994

  • SME
    Trolly Assisted Haulage Experiences At Iscor's Sishen Iron Ore Mine

    By B. J. Vorster

    The South African Iron and Steel Company Ltd operates a large Iron Ore Mine in the Cape Province of the Republic of South Africa. The Mine is situated on the farm, Sishen, approximately 600 km west of

    Jan 1, 1985

  • SME
    Evaluation of Seismic Potential in a Longwall Mine with Massive Sandstone Roof Under Deep Overburden: an Update - Mining, Metallurgy & Exploration (2023)

    By Mark Van Dyke, Ted Klemetti, Jake Beale, Zoheir Khademian, Joe Wickline

    In 2016, a 3.7-ML magnitude event caused by mining activity occurred at a longwall mine in southwestern Virginia which was recorded by the United States Geological Survey (USGS) and felt by local resi

    Aug 4, 2023

  • SME
    Chuquicamata and Its Modernization Plan: Back to the Major League

    By Juan H. Rojas

    The Chuquicamata mining and metallurgical complex is the main division of CODELCO-CHILE. Its comparative advantage in the world of primary copper producers had deteriorated severely and, consequently,

    Jan 1, 1998

  • SME
    Application Of The Shrinking Core Model For Copper Oxide Leaching (SME-AIME Fall Meeting & Exibit St. Louis, Missouri, October 19-21, 1977 )

    By John L. Shafer

    Often an in situ leach is the only practical economic method for copper recovery from small low grade oxide deposits. The decision to develop a copper property by an in-situ blast and leach is strongl

    Jan 1, 1977

  • SME
    Financial Problems Of Small Mines - Establishing Operator Credibility

    By David M. Koogler

    If you are contemplating starting a small coal mining operation there is a good possi¬bility that you can not afford it. If you, have already started, you may be on the road to bankruptcy. If you ar

    Jan 1, 1981

  • SME
    DC Water First Street Tunnel – Integrated Engineering and Construction

    By Stephen Njoloma, Ivan Hee, Ravi Jain, Mina Shinouda

    "INTRODUCTION DC Water’s First Street Tunnel (FST) is comprised of a collaborative effort between DC Water, DC Water’s Project Consultants Organization (PCO) led by Greeley & Hansen and McMillen Jacob

    Jan 1, 2016

  • SME
    Tomographic Imaging of Coal Pillar Conditions: Observations and Implications

    By M. J. Friedel

    The U.S. Bureau of Mines (USBM) investigated the use of seismic refraction tomography (SRT) for identifying changes in pillar loading at the Foidel Creek coal mine near Steamboat Springs, CO. The inhe

    Jan 1, 1994