Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Analysis of Marine Blast-Induced Ground Vibrations in the Sudeste Port Project

    By Eraldo Florêncio, Paulo Couceiro, Manuel Lopez Cano

    Specialized marine blasting techniques were required to deepen and widen the access channel and turning basin of the Sudeste Port Terminal in Rio de Janeiro, Brazil. This terminal has been designed to

    Jan 1, 2018

  • ISEE
    Microphone Height Effects on Blast-Induces Air Overpressure

    By Randall M. Wheeler, Kenneth K. Eltschlager

    Blasting Seismographs use microphones to measure air overpressure from blasting. The microphone height above the ground has been the object of some controversy. The current ISEE “Field Practice Guidel

    Jan 1, 2005

  • ISEE
    Demonstrating Competence from Charge Hands to Chartered Engineers

    By Ken Cross

    This paper aims to demonstrate that explosives organizations and workers have a legal, moral and financial duty to be able to demonstrate their competence when required, and how that may be achieved a

    Jan 1, 2013

  • ISEE
    Natural Causes vs. Blasting Damage (0f5bd837-c817-4297-aa85-2fe7a4624b9b)

    By Earl C. Hutchison, Wade C. Hutchison

    T 0 effectively evaluate property damage that is claimed to have been caused by blasting activities and in order to lay the proper foundation to build the best legal defense, identification of the act

    Jan 1, 1995

  • ISEE
    Journal: Summary Report of the Seismic Regulation Subcommittee

    By Larry: McAnuff Schneider, Edward Walter, Gordon Shaw, Daniel Grieco, Dennis Clark

    During the 1998 Annual Conference of the International Society of Explosives Engineers (ISEE), the Seismograph Section established a subcommittee for the purpose of compiling a list of all regulations

    Jan 1, 2001

  • ISEE
    Monitoring and Prediction of Blast Vibrations : A Case Study

    By D Vidyarthi

    Blasting is the most important activity in the mining industry, the world over. It is a well known fact that only part of the explosive energy gets utilized in causing the actual rock fragmentation. T

    Jan 1, 2007

  • ISEE
    Florida Mining Blast Vibration Study Part 1: Do RI8507 Vibration Limits Apply in Florida?

    By Tristan Worsey, Nathan Rouse

    Florida is one of the major limestone producing states in the United States. The state has unique regional geology and groundwater characteristics that require equally unique mining methods to extract

    Jan 1, 2019

  • ISEE
    Adapting Quarry Ace for Beginners to Profile Bench Faces and Optimize Front Row Burden Controls

    By Brian Gar Wingfield

    "The introduction of the QuarryMan laser profile system in 1987, along with the development of the corresponding 3-D software, gave a qualified operator pertinent information about dimensions of quarr

    Jan 1, 1992

  • ISEE
    Electronic Tools for Borehole Inspection

    By Michael Olmsted

    Inspection of boreholes prior to blasting can result in cost reductions as well as increases in efficiency and safety. Until recently, borehole inspection was performed in two manners. For simple insp

    Jan 1, 2000

  • ISEE
    Journal: Blasting in the New Millennium: Blasters Take on the Role of Blast Site Manager

    By Steve Dillingham

    Today, a typical blaster is likely to wear many hats, including, but not limited to, supervisor, risk manager, safety coordinator, explosives engineer, communicator, as well as professional decision m

    Jan 1, 2001

  • ISEE
    Pre-Blast Surveys; a Public Relations and Claim Reduction Tool (b114a2f5-7740-4145-afd2-f7ffc2af0fcd)

    By David Harrison, Edward J. Walter, Meitra Ferek

    Agreat tool in the prevention of blasting complaints and subsequent damage claims. In today’s highly competitive industry, we are always looking for ways to become more cost effective. This article in

    Jan 1, 1995

  • ISEE
    Bottom Hole Annular Pressure: A Theoretical Problem with Real Effects

    By Clarence R. Zink

    A problem has always existed in deep and fast drilling situations such as coal overburden drilling, or when drilling with a tight annulus, such as 9 7/8" bits and 8 5/8" pipe. This problem is the diff

    Jan 1, 1998

  • ISEE
    Blasting on Logging Roads (British Columbia, Canada)

    By Raymond Chenier

    British Columbia (BC) is Canada’s most western province. The landscape in BC is amongst the most beautiful and pristine in the world. Along with its beauty come vast mountain ranges, coastal rain fore

    Jan 1, 2001

  • ISEE
    Using New Radio Frequency Identification to Improve Scheduling and System Management of Rock Excavation and Transport

    By Luis Valentim, Terry Cousins

    The goal of a mine is to produce ore at the lowest possible cost with due regard to safety of pemonnel and equipment. The mining process consists of a number of discrete operations such as planning, d

    Jan 1, 1998

  • ISEE
    The Behavior of Rocks in the Near Zone of an Explosion

    By Serge V. Krasavin

    The behavior of rocks subjected to dynamic loading conditions under explosion includes sufficient information about hydrodynamic variables such as pressure P, mass velocity U, internal energy E, speci

    Jan 1, 1992

  • ISEE
    Quality-Assurance (to ISO-9001 Level) for Quarry Blasting in the Urban Environment

    By Wilfrid Comeau

    This paper deals with the concept of a Quality-Assurance Manual, to the ISO-9001 Level, for quarry blasting in the urban environment. A case history of the incident, which led to its development, is p

    Jan 1, 2003

  • ISEE
    Low-Cost Method of Using Blasting Videos to Improve Performance

    By Jennifer Ward

    The primary objective of this paper is to establish how a low cost, high definition (HD) camera can allow for easy sustainable recordings of blasting operations. The subsequent analysis of each video

    Jan 1, 2015

  • ISEE
    The Analysis of Blast Vibration Data - What is the Current State of the Art?

    By Randall M. Wheeler

    Many of us have used a seismograph to measure peak particle velocity and frequency. But do we really understand why? Also, why do we measure particle velocity instead of displacement and/or accelerati

    Jan 1, 1997

  • ISEE
    Underwater Explosions Part 5. Minimum Weight of an Explosive Charge for the Reliable Energy Measurements

    By M. Hagfors

    When establishing an underwater testing site for the energy measurements of the explosives, the dimensions of the measuring pool have to be measured to find out what is the maximum weight for the test

    Jan 1, 2007

  • ISEE
    Cost Optimization for Controlled Blasting, Transportation and Crushing

    By Taner Sumer, H Altay Guvenir

    Fragmentation in rock quarries is tried to be achieved by changing the specific charge, drill pattern and bore hole diameters by different experts. This paper is a brief summary consisting of the util

    Jan 1, 1993