Numerical Modeling Of Dynamic Soil-Structure Interaction In Bridges With Hp Driven PilesBy Tu Bao
HP-Pile foundations are the most favorable type of foundations for bridges because of their constructability, versatility with regard to subsoil conditions, and settlement controllability. For many
-
Numerical Modeling of Dynamic Soil-Structure Interaction in Bridges with HP Driven Piles (47ff630e-35bf-41f4-946a-236631b70ac5)By Andrew Rietz, Yu Bao, Steven Halewski
"HP-Pile foundations are the most favorable type of foundations for bridges because of their constructability, versatility with regard to subsoil conditions, and settlement controllability. For many y
Jan 1, 2017
-
Seismic Behavior of Full-Scale Piles in Improved Soft Clay (8135d170-323f-4789-8067-7d5f00fd5bb8)By Jin-Wei Huang, Bradley J. Fleming, Sri Sritharan
"Although soil improvement and its application to deep foundations is gaining popularity in the engineering community, this technique is not widely used in high seismic regions due to lack of fundamen
Jan 1, 2017
-
Seismic Behavior Of Full-Scale Piles In Improved Soft ClayBy Bradley J. Fleming
Although soil improvement and its application to deep foundations is gaining popularity in the engineering community, this technique is not widely used in high seismic regions due to lack of fundament
-
Load Testing MethodsThis Section describes four alternative methods for load testing of drilled shafts: high strain dynamic test (HSDT), rapid load test, static load test, and bottom load test. Until recently, static loa
Jan 1, 2004
-
Field Test of Electroosmosis with the Injection of Saline Solution of Taipei Silty ClayBy Chang-Yu Ou, Shao-Chi Chien, Hsuan-Hsiang Chang
"A field test was performed to investigate the applicability of electroosmosis with the injection of saline solution of Taipei silty clay. The calcium chloride solution and sodium silicate solution we
Jan 1, 2005
-
The Need For Air Control In Down The Hole Hammer Casing Advancement DrillingBy Frank J. Purcell
“Down The Hole” (DTH) hammer drilling is often necessary to advance the casing during pile construction where the test bores have determined difficult drilling conditions with obstructions such as bou
Nov 1, 2022
-
In-Situ Ground Reinforcement TechniquesBy P. J. Nicholson
The methods of reinforcement to be discussed in this paper are all insitu methods, ones that can be used on the soil structure as it exists in the ground, and do not rely on excavation and replacement
Jan 1, 2010
-
Building a High-Rise Adjacent to Transit Tunnels in San Francisco (6bdbc52a-94a2-4c48-ba21-cc4450dc649d)By Lori A. Simpson, Linda H. Liang
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement. T
Jan 1, 2017
-
Building A High-Rise Adjacent To Transit Tunnels In San FranciscoBy Lori A. Simpson
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement.
-
Large Diameter Open-End Pipe Pile Driveability Analysis Including Geotechnical Friction FatigueBy Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
Large diameter open-end pipe piles are increasingly used as deep foundations to support heavy onshore and offshore structures. During the driving process, several factors such as subsurface conditions
Jan 1, 2019
-
Large Diameter Helical Piles for Refinery ExpansionBy Chris Normand, Paul Volpe, Eric Wey, Howard Perko, Burt Ogilvie, Patrick Murray
"A refinery expansion project for Marathon Petroleum Company in Southern Louisiana required existing medium to large pipe racks to be expanded for additional capacity. Foundation modifications were ne
Jan 1, 2017
-
Analysis of Pile Interaction under Lateral Cyclic Load in Cohesiooless SoilBy Sudip Basack
"The topic of pile foundation subjected to lateral cyclic load is an age-old problem confronted by Geotechnical Engineers. The environment prevalent in ocean and shorelines necessitates the piles supp
Jan 1, 2005
-
Deep Foundation Advancements in FargoBy Ezra Ballinger, Matthew R. Glisson
Located in downtown Fargo, North Dakota, the Block 9 Redevelopment project site contains highly- compressible soils in the upper 100 feet with groundwater about 10 to 15 feet below the existing ground
Jan 1, 2019
-
Effects Of Self-Weight On Thermomechanical Response Of Energy PilesBy Arash Saeidi Rashk Olia, Dunja Perić
The increasing demand for renewable energy has attracted attention to energy geostructures as means of extracting clean geothermal energy from the ground. To further advance the understanding of soils
Oct 1, 2022
-
A Review of the Design Formulations for Static Axial Response of Deep Foundations from Cone Penetration Test DataBy Fawad S. Niazi
Analysis of deep foundations in terms of axial capacity has been a topic of great interest in the soil-structure interaction problems. Soil behavior is governed by a series of complex stress-strain ch
Jan 1, 2013
-
10th International Conference On Piling And Deep Foundations: Amsterdam 2006 - Title ? Table Of Contents - Welcome Address From The Mayor Of Amsterdam, Job CohenIt is my great pleasure as mayor of the city of Amsterdam to welcome you today to Amsterdam, and to the 10th International Conference on Piling and Deep Foundations. The history of Amsterdam has b
Jan 1, 2006
-
Micropile Transmission Foundations In Environmentally Sensitive, Challenging TerrainBy Esam Abraham
A 13.6 mile portion of the 500 kV Tehachapi Renewable Transmission Project crosses the mountains of the Angeles National Forest. Access and environmental constraints precluded road development for mo
Jan 1, 2010
-
Cumulative Settlement Of Pile Group Under Cyclic High-Speed Train LoadingBy Pratik Goel, Sumanta Haldar
High-speed rail is an emerging area of interest in India. The Government of India is implementing prestigious bullet train projects in various parts of the country. High-speed rail (HSR) will be opera
Sep 1, 2022
-
Retaining Wall Installation Beneath An Existing StructureBy Kenton W. Braun
Concourse B at the Anchorage, Alaska International Airport is currently being renovated while retaining the original building structure and foundations. Part of the renovation includes the installati