    Pile Design and Construction Challenges in Partially Thawed Alaskan Soils (f9ca4371-20bf-4196-a495-4aa1bd15a8c0)

    By John D. Thornley

    Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alask

    Jan 1, 2017

  • DFI
    Bio-Grout Based Soil Improvement

    By Terzis D. PhD, Katterbach M.

    While awareness around the environmental impact of existing grout materials and chemical binders is increasing rapidly, biotechnologies are growing traction as sustainable alternatives in groundwork o

    May 1, 2022

  • DFI
    High Capacity Hollow Core Bar Piles

    By Lawrence F. Johnsen, Felix Ferrer, Dino Tomasetti, Cassandra A. Wetzel

    "A 17 story building was constructed at the Brooklyn Navy Yard on a site with a long history of development. Most recently the site supported a dewatering well and craneway to service two adjacent dry

    Jan 1, 2017

  • DFI
    Excavation Construction for the Transbay Transit Center

    By Nick O’Riordan, Kaitlyn L. Fleming, Michael Riemer, Youssef M. A. Hashash, Stephen McLandrich, Mohamad Jammoul, Pierre Gouvin, Andrew Yeskoo

    "To accommodate urbanization, cities are developing more underground space as a means to house public transportation systems and other entities. Underground developments often require construction of

    Jan 1, 2015

  • DFI
    Case Histories of Arch Action Low Improvement Ratio Cement Column Method (ALiCC Method)

    By Jun Ohbayashi, Yoshiyuki Yagiura, Hiroaki Miyatake, Masuo Kondoh, Naotoshi Shinkawa

    "Reducing the improvement ratio of ground improvement is an extremely efficient way to reduce the construction cost and construction period of mitigation measures for soft ground. The Arch Action Low

    Jan 1, 2015

  • DFI
    Deep Foundations - Experience & Problems Encountered-Case Study For Second Thane Creek Bridge At Vashi, New Bombay. - Synopsis

    By S. R. Nandargikar

    Construction of open foundations for the Second Thane Creek Bridge was indeed a challenging task. Some major problems were encountered during the construction of foundations for pier No. P22 (S/N), P.

    Jan 1, 1996

  • DFI
    Soil Improvement Using Gravel-Sand Columns for a Highway Project in Germany

    By Schmitz Stefan, Stephan Jee-Sun

    "Due to the reunion of Western and Eastern Germany in the late 80’s, a multitude of infrastructure projects had to be executed. A good portion of these projects required improvement of the motorway sy

    Jan 1, 2015

  • DFI
    Selmon Expressway, Tampa: Case History of Drilled Shaft Design for Extreme Variability

    By Ross T. McGillivray, David S. Graham, Dan A. Brown, Steven D. Dapp

    "The Selmon Expressway includes an elevated structure extending across several miles of weathered karstic limestone geology, and represents a challenge for design because of the high variability of th

    Jan 1, 2015

  • DFI
    Foundation Construction Challenges At 100 11th Avenue In Manhattan - Osterberg Cell Load Test In Mica Schist

    By Cem Altuntas

    This paper is the second in a series of two describing the design and construction of a foundation for a major high-rise real estate development on the west side of Manhattan, N.Y. The foundation memb

    Jan 1, 2008

  • DFI
    After Sandy: Bay Park Sewage Treatment Plant Flood Protection

    By David Guy, John Stanbury, Gilbert Tallard

    "In 2009, storm surge from Hurricane Sandy inundated the Bay Park Sewage Treatment Plant located at El. +4 to +12 (+1.2 to +3.6 m) in East Rockaway, Long Island, NY. With all systems down, raw sewage

    Jan 1, 2016

  • DFI
    The Role Of Real-Time Instrumentation In Large Infrastructure Projects

    By J. G. La Fonta

    The rapid development of real-time monitoring technology for the construction of large underground structures in urban areas can be attributed to: the zero-risk objective, the need for transparency be

    Jan 1, 2006

  • DFI
    Ground Improvement Using Compaction Techniques on Calcareous Sands and Verification Tests Procedures

    By Vijaya Bhushan Rao, Jason Redgers

    A mixed-use development comprising of multistoried residential towers, retail and associated infrastructure covering an area of 500,000 m2 is under construction in Dubai. The subsoil conditions consis

    Sep 8, 2021

  • DFI
    Ground Improvement Using Compaction Techniques on Calcareous Sands and Verification Tests Procedures

    By Vijaya Bhushan Rao, Jason Redgers

    A mixed-use development comprising of multistoried residential towers, retail and associated infrastructure covering an area of 500,000 m2 is under construction in Dubai. The subsoil conditions consis

    Sep 8, 2021

  • DFI
    Model Specification Helical Pile Foundations Compression Applications

    "This model specification includes sample text shown in normal font with commentary in italics. The commentary is intended to highlight project-specific items the specification writer should consider

    Jan 1, 2015

  • DFI
    RC Harris Water Filtration Plant Expansion Excavation Support Design, Installation And Performance

    By Matthew Janes

    The RC Harris Filtration Plant, which treats the majority of the fresh water for over 2.5 million Torontonians, is a Canadian Architectural Heritage site demonstrating a classic example of Art Deco A

    Jan 1, 2006

  • DFI
    Collaborative Development of Sustainable & Economical Solutions for Underground Structures

    By Abid Adekunte

    "Whilst safety is considered to be of high priority in every aspect of engineering projects, it is equally important for designers and contractors to be continually aware of their obligations to the i

    Jan 1, 2017

  • DFI
    Seven Mile Dam Retrofit - A Global Challenge

    By Arvindh Gupta

    BC Hydro proposed to improve the stability of the existing Seven Mile Dam with 54 corrosion protected, re-stressable anchors comprising 92/0.6? strands each, in phase 2 of the program. Being globally

    Jan 1, 2004

  • DFI
    The Deep Cut-Off at the Walter F. George Dam

    "TREVIICOS CorporationINTRODUCTIONThe Walter F. George lock and dam was constructed on the Chattahoochee River between 1955 and 1963 with the double function of improving navigation and generating pow

    Jan 1, 2014

  • DFI
    Design Of Bearing Plates For Anchors In Geo-Application

    By Andrew Baxter

    This paper focuses on the design of steel bearing plates to transfer load from tiebacks and tiedowns to a concrete mass. It lists and describes the various available procedures for design of bearing p

  • DFI
    Underpinning Atlanta International Airport Concourse E for APM Tunnel Extension

    By Clinton O. Rex, Adam S. Hurley, W. Morgan NeSmith

    "Hartsfield-Jackson Atlanta International Airport underwent a $1.2 billion dollar expansion project centered on the construction of the new Maynard H. Jackson International Terminal. Passenger access

    Jan 1, 2017