Simulation of Soil Plug Effects in Open Steel Pipe Piles Considering the Complex Soil-Structure-Interaction during InstallationBy Johannes Labenski, Christian Moormann, Johannes Aschrafi
"Open steel pipe piles are used for various applications in costal engineering, port structures and increasingly important for offshore structures. During the installation of open steel pipe piles the
Jan 1, 2017
-
Micropiles for Seismic RetrofitsBy Rob Jameson
"Although seismic retrofit is recognized as a key micropile application, widely-used reference documents do not clearly address design and testing recommendations for micropiles that are loaded primar
Jan 1, 2009
-
Sharing of Lateral Loads and Moments in Pile FoundationsBy Andrea Gambi, Giancarlo Olivucci, Maurizio Lenzi
"In the paper a criterion for the evaluation of the sharing of the lateral loads in a piled foundation is presented. It relies on the the compatibility condition between the rotation of the rigid pile
Jan 1, 2005
-
Dewatering Tests for Underground Stations in RomeBy Antonio Zechini, Giuseppe Iorio, Massimo Grisolia
"The new C Line of the Rome Metro runs northwest to southeast across the city center, with 30 new stations and a total length of more than 15.5 mi (25 km). Due to the presence of a dense urban environ
Jan 1, 2017
-
DFI46 Panel on Foundation ReuseBy Andy Boeckmann
In early 2021, DFI formed a Foundation Reuse Task Force due to concurrent and coincidental discussions of this topic during meetings of the Subsurface Char- acterization for Deep Foundations and Test
Feb 1, 2022
-
A Novel Approach to Incorporate Shear-Moment Coupling Effects in Foundation Stiffness for Caisson Piles for Izmit Bay Bridge in TurkeyBy Arash Khosravifar, Amalia Giannakou
"Nonlinear foundation springs for bridge caisson foundations show significant coupling between the shear force and bending moment. Implementing foundation stiffness matrix with coupling effects (off-d
Jan 1, 2017
-
Levee Repair and Upgrade by Dual Sheet Pile Walls and Accordion Sheet Pile WallBy Takefumi Takuma, Ali Fayad, Shigeru Kambe
"This paper discusses the unique design and construction circumstances of the cantilevered dual sheet pile walls and the Accordion Sheet Pile Wall for the repair and upgrade of the East Garden Grove-W
Jan 1, 2017
-
Data Management Guide SpecificationBy Laurel E. Blackman
The DFI Project Information Management Systems (PIMS) Committee cooperated with the US Army Corps of Engineers (USACE) to develop a specification for PIMS used on USACE projects. Once completed the Co
Jan 1, 2021
-
Design and Construction of Mixed Ground Working Platform for a CCR Surface ImpoundmentBy Juan M. Pestana, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, William Tanner, Daniel J. Woeste
An access pathway and working platform were designed and constructed for equipment access for a Deep Soil Mixing (DSM) pilot study over a coal combustion residual (CCR) surface impoundment (SI). The D
Jan 1, 2019
-
Mediation Of Construction Disputes - An Advanced Preparation Guide For Mediation Of The Complex Construction Case - IntroductionBy Alan Alhadeff
Why is mediation being hailed as the wave of the future? The high cost of putting on a trial, over-crowded court calendars and long trial delays have resulted in what prominent attorneys and leadi
Jan 1, 1990
-
Applications of Diaphragm Wall Technology for Deep Foundations and Permanent Underground Structures for the Transbay Transit Center and the Transbay DevelopmentsBy Mikael Calando, Thomas Joussellin
"San Francisco's rapid growth has caused the city to plan for the Transbay Transit Center Project, a visionary transportation and housing project, that will transform downtown San Francisco and the Sa
Jan 1, 2016
-
A Non Linear Fractal Model for the Analysis of Pile FoundationsBy Paola Campana, Maurizio Lenzi
"In the paper a non linear model for the analysis of the pile response to the axial loads is presented. The study aims to find a general analytical solution concerning the pile-soil interaction modele
Jan 1, 2017
-
St. Louis Service Base Floating Wharf Mooring System ReplacementBy A. Bozorgzadeh, B. M. Jensen, B. N. Koelling, B. R. Murtaugh
"The Service Base mooring system originally consisted of two general types of structures, 19 timber piles cabled together and steel three-legged pipe piles. The St. Louis District fleet moored to the
Jan 1, 2017
-
A Soil Quake Davisson Offset Method For Drilled FoundationsBy Michael Perlow Jr
A modification of the original Davisson Offset Limit (DOL) is presented for drilled foundations using soil quake (QDOL) factors ranging from 2 to 6. A further modification of the Davisson Offset Limit
-
Shoring of Long Beach Main Pump Station Utilizing Ground Improvement Methods, Long Beach, CABy Eric Lindquist, John Compagnone, Gabriel Carvajal
"Condon-Johnson & Associates, Inc. (CJA) with the assistance of design consultant, Brierley Associates, designed and installed a water tight shoring system utilizing several ground improvement techniq
Jan 1, 2017
-
North American Geotechnical Exploration Practice ? SynopsisBy C. O. Riggs
Geotechnical exploration in North America, in particular, exploration for deep foundations analyses, is currently and generally performed following the most basic sampling and insitu testing methods a
Jan 1, 2010
-
Building The Devil’s Playground: How a Ground Improvement Program Eliminated the Need for Pile FoundationsBy Christian B. Woods, Joe C. Drumheller
"Kenneth A. Huber, P.E., Langan Engineering & Environmental Services, New York, New York, USAThe dream to bring New Jersey Devils hockey to the largest city in New Jersey became a reality in the summe
Jan 1, 2015
-
Capitol Complex Phase 1 ExpansionBy Eric S. Lindquist, Charles A. Luxford
The State of Texas recently adopted a master plan to expand the existing Capitol Complex in Austin. Phase 1 of this expansion will add two new State office buildings and five levels of underground par
-
Pile Lateral Behaviour under Full Scale Lateral Load Tests in Thick Compacted Marine Carbonate Sand Fill of an Artifical IslandBy Challa Venkata Rami Reddy, Anindya Roy, G. R. Konni
This paper presents the results of pile lateral capacities obtained from both conventional design and fullscale pile lateral load tests. Conventional design using P-Y curve analysis is very commonly b
Sep 8, 2021
-
Self-Hardening Slurry Wall Installation by Hydromill at the Herbert Hoover Dike – An Innovative Solution (05e83755-4ec2-4ed4-a26c-d1e81c41960c)By Mario Mauro, Jeff Taylor, Carlos Morales
"In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehab
Jan 1, 2017