Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Presentation #2 - Non-Destructive Testing For Drilled Shafts - Contents

    By Frank Rausche

    Introduction and Background Testing -Pile Preparation -Data Processing -Data Interpretation/Case Studies Case Studies - Existing Piles Stories from around the world

    Jan 1, 2001

  • DFI
    New CIGMAT Downhole Penetrometer (DHP-CIGMAT) for Use During Drilled Shaft Construction (7493fc91-7396-4eac-bed2-0406570252cc)

    By Omer F. Usluogullari, C. Vipulanandan

    "It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increa

    Jan 1, 2017

  • DFI
    Pile Foundation Solutions in the Deep Quaternary Sediments of Botany Bay

    By Paul A. O’Brien, Gary A. Chapman, Thomas G. Cuniowski

    "The new Amcor B9 paper mill in Botany, NSW, Australia, involved the design and construction of a new paper mill founded within the Botany Basin Sediments. There were numerous design and construction

    Jan 1, 1900

  • DFI
    Vsm And Ofd® Technology: Mechanized Solutions For Deep On- And Offshore Foundations

    By Nils Schneider, Marc Peters, Stefan Frey, Andrea Fluck

    Due to the worldwide population growth, the development of sustainable infrastructure and the exploration of renewable energies plays a key role to handle the rising megacity trends and to limit carbo

    Nov 1, 2022

  • DFI
    Army Corps Mega Projects Benefits From Innovative Foundations

    By Dale Berner, Michael O’Sullivan

    "This paper focuses on lessons learned from the innovative designs, in-the-wet construction methodology and modified foundation conditions, for two United States Army Corps of Engineers, USACE, Megapr

    Jan 1, 2017

  • DFI
    Construction Of The Deepest Kelly System Foundation Piles In Kuala Lumpur, Malaysia

    By Vijayakumar Viramuthu, Martin Heinrich

    Tower of Lot L, L1 & M, Kuala Lumpur City Centre when completed would stand 700 m tall. This Mega tall Skyscraper would merely be less than 500 m away from the world tallest Twin Tower, the Petronas T

    May 1, 2022

  • DFI
    Workshop on Quality Assurance for Post-Grouted Drilled Shafts

    By Mary Ellen Bruce Large

    "INTRODUCTIONIn partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC

    Jan 1, 2016

  • DFI
    Final Report – Workshop on Quality Assurance for Post-Grouted Drilled Shafts

    By Mary Ellen Bruce Large

    "In partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC), Deep Foun

    Jan 1, 2016

  • DFI
    Optimized Neural Network Model For The Prediction Of Driven Pile's Resistance

    By Hyun. I. Park

    Although numerous investigations have been performed over the years to predict the behavior and bearing capacity of piles, the mechanisms of these behavior and bearing capacity of piles have yet to be

    Jan 1, 2006

  • DFI
    Prediction of Axial Geotechnical Resistance of Base Grouted Drilled Shafts

    By Emad Farouz, Ehab S. Shatnawi

    "The increasing demand for small deformations and high-capacity drilled shafts without enlarging drilledshaft diameters has motivated the development and increasing use of a base grouting (BG) techniq

    Jan 1, 2016

  • DFI
    Diaphragm Walls for Seepage Control and Remediation: Three Case Histories

    By Fabio Santillán, Mario Mauro, Raffaella Granata

    "This paper presents the utilization of slurry walls methods for the recent remediation of three high hazard active dams in the United States. Tuttle Creek Dam, located in Manhattan, KS, required seis

    Jan 1, 2016

  • DFI
    Load And Resistance Factor Design Of Pullout Of A Single Driven Pile In Sands And Clays

    By Dongwook Kim

    Recently, load and resistance factor design (LRFD) is gradually being adopted internationally in geotechnical design due to the advantages of LRFD over the existing allowable stress design (ASD). LRFD

    Jan 1, 2010

  • DFI
    Jet Grouting For Deep Excavation Support For Re-Entrant Corners

    By Chu E. Ho

    This paper reviews the design of jet grouting at re-entrant corners of excavations where the diaphragm wall and secant pile wall installation were interrupted by existing utilities in the streel sidew

    May 1, 2022

  • DFI
    CFA Secant Piling In California

    By Philip Derbyshire, Dale J. Scheffler

    "Continuous Flight Auger (CFA) piling is a variation of Augered Cast-In-Place (ACIP) or augercast piling. In both cases a continuous auger with a hollow stem is used to drill a hole and a pile is form

    Jan 1, 2005

  • DFI
    Construction Of Foundation Of Power House-IV At W.Y.C., Hydro-Electric Project, H.S.E.B., Bhudkalan, Haryana. - Synopsis

    By D. K. ] [Gupta

    The Foundations of the Shear keys and alround cut off for Power House -IV of the Western Yamuna Canal Hydroelectric Project at Bhudkalan, Haryana were to be laid at a depth of 26M below the N.S.L and

    Jan 1, 1996

  • DFI
    Undergraduate Learning Commons

    By William M. Tanner, Daniel C. Brahana

    "A drilled pier foundation was originally designed to support the proposed G. Wayne Clough Undergraduate Learning Commons on the campus of Georgia Tech in Atlanta, GA. Reflective of the site geology,

    Jan 1, 2015

  • DFI
    Analytically Modelling Dst Arrival Time Databases With High Order Polynomials For Optimal High Resolution Imaging

    By Gerald Verbeek, Erick Baziw

    Downhole Seismic Testing (DST) is an extensively utilized geotechnical tool for site characterization. DST provides low strain (<10-5) in-situ interval shear and compression wave velocity estimates. T

    Oct 1, 2022

  • DFI
    “Borehole Stabilization” For Deep Excavation, An Essential Part In Bored Piling / Diaphragm Wall Construction

    By Thomas Domanski

    Any type of deep excavation whether for Bored Piling, Diaphragm Walls or Contiguous Bored Piling Walls depends on forming a stable borehole with a defined cross-section to receive safely the permanent

    Sep 1, 2022

  • DFI
    Repairs Of Diaphragm Walls, Lessons Learned

    By Raymond J. Poletto

    This paper describes the special problems that occur with the construction of diaphragm walls and discusses the lessons learned during the repairs of structural walls. Although diaphragm or slurry wal

    Jan 1, 2011

  • DFI
    Life Extension of 132 kV Lattice Tower Foundations

    By Allan Herse

    "The years following World War II were nation building years in Australia. Soldiers returned from the European and Asian theatres of war sparking a major infrastructure construction boom. Dams and hig

    Jan 1, 2017