Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Dynamic Load Testing Of Augered Cast-In-Place Piles (Rausche)

    By Frank Rausche

    The more widespread use of Augered Cast-in-Place (ACIP) Piles has generated increased demand for improved quality control measures. These deep foundation elements are often relatively long and slender

    Jan 1, 2001

  • DFI
    Heating and Cooling Structures with Steel Pile Foundations - Closed Loop Standing Column Well Technology (df25801f-7df6-457c-ab18-569c2a6ce07f)

    By Paul Suver

    "The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing c

    Jan 1, 2017

  • DFI
    Compaction-Induced Lateral Earth Pressures And Vertical Shear Forces Acting On Non-Moving Retaining Walls

    By George M. Filz

    Restrained basement walls and unrestrained but massive concrete walls on rock foundations experience very small movements in response to lateral earth pressures. Such walls are often designed using at

    Jan 1, 2003

  • DFI
    Foundation Contracts And Law - Part -1: Relevan[i] Law

    By Kirty Dave

    Foundations in any contract are the most uncertain parts of the contract and most of the "Construction-Contract-Disputes" are either directly related to foundations or arise as 'Side-effects of c

    Jan 1, 1996

  • DFI
    Deep Drilling at Mica Dam, British Columbia

    By Douglas G. Baker, Jason K. Braund-Read, Megan R. Sheffer

    "Mica Dam, owned by British Columbia Hydro, is an 820 ft high earthfill embankment dam that was completed in 1973. The dam consists of a thin central impervious till core supported by upstream and dow

    Jan 1, 2017

  • DFI
    Micropiles Take Off at Dulles Airport

    By Eric Rehwoldt, Walt Rabe, Jesús Gómez, Tim Myers

    "An expansion plan for Washington Dulles International Airport is currently underway to prepare for growth at this northern Virginia facility in the future. While Dulles currently serves more than 20

    Jan 1, 2009

  • DFI
    Design of Pile Foundations in Liquefiable, Laterally Spreading Grounds

    By Arash Khosravifar

    One of our research thrusts at Portland State University (PSU) centers on developing design guidelines for pile foundations in liquefiable, laterally spreading grounds. This research has been primaril

    Nov 1, 2023

  • DFI
    7-Foot Diameter Drilled Shafts In Weathered Rock: Design, Load Testing, And Construction

    By Aly M. Mohammad

    The design of large diameter drilled shafts in weathered rock has always presented a challenge to the foundation engineers. Degree of weathering and load transfer mechanism through the rock are essent

    Jan 1, 2003

  • DFI
    Design Of Cost-Effective Retaining Wall At The Junction Of Approach Bridge Over A Ramp

    By Dr. Anup Kumar Mandal, Partha Roy, Shuvranshu Kumar Rout, Dipak Mandal, Biswajit Das

    Installation of a new scalping station with bunker, apron feeder, scalping screen, ramp -retaining wall and approach bridge was planned in an existing integrated complex of phosphate fertilizer at a r

    Sep 1, 2022

  • DFI
    On The Ultimate Capacity And Radial Stress Distribution Of Driven Piles In Sands

    By E. Ulrich Klotz

    It is difficult to predict accurately the capacity of driven piles in sand. In practice, this uncer­tainty either leads to conservative designs if the capacity is under-predicted, or worse, if the cap

    Jan 1, 2002

  • DFI
    Combined Piled Raft Foundation (CPRF) response

    By G. L. Sivakumar Babu, P. Chaithra

    "Raft foundations which are used against differential settlements and for carrying heavy loads can still be subjected to excessive settlements even if it is safe against bearing capacity consideration

    Jan 1, 2015

  • DFI
    Innovative Methods Of Dealing With Contaminated Soils In Drilled Shafts - Synopsis

    By William F. Loftus

    When high capacity diameter pipe piles are driven open-ended into the underlying bedrock, the material gathered inside the pipe often must be excavated to allow concrete to be placed within, in a clea

    Jan 1, 1996

  • DFI
    Keynote Lecture 5: Giovanni Lombardi Grouting of Rock Masses

    By Giovanni Lombardi

    In order to get a clear overview of the grouting works carried out, to avoid misinterpretations of the data and functions shown on the display of the grout monitoring device, it is recommended to keep

    Feb 10, 2003

  • DFI
    Underpinning Of A 16th Century Cistercian Abbey Foundation

    By Michel Bustamante

    The original Cistercian Lure abbey situated in eastern France and built in the second half of the 16th century, has become nowadays an administrative building. Because it has been founded on poor grou

    Jan 1, 2002

  • DFI
    The Wireline Undisturbed Soil Sampling In Deep Foundation ? Synopsis

    By Z. Q. Bian

    The wireline sampling originates from core drilling in rocks. The authors combined the wireline sampling technique with conventional undisturbed soil samplers, including Osterberg sampler, Denison sam

    Jan 1, 2010

  • DFI
    High Capacity Minicaissons In NYC

    By Lawrence F. Johnsen

    Six case histories are presented in which tall, slender high rises are supported on high capacity minicaissons. The recent development of a high strength rebar cage has resulted in compressive loads o

    Jan 1, 2007

  • DFI
    Investigation Of Bearing Behavior Of Pile Raft Foundation Using Numerical Modeling

    By A. Ghorbani

    The analysis of Combined Pile Raft Foundation (CPRF) is very complex due to involved interactions among components of CPRF system. Many researchers made efforts to develop sufficient methods including

    Jan 1, 2007

  • DFI
    High And Low Strain Testing Of Bouncing Piles

    By Kyle L. Murrell

    Along the southeast United States coast, clayey silt and silty clay marine formations may cause pile installation and integrity problems. More specifically, excess pore pressures which develop in the

    Jan 1, 2008

  • DFI
    Route 9A Pedestrian Tunnel at the World Trade Center

    By Raymond E. Sandiford

    "The redevelopment of the World Trade Center (WTC) provided an opportunity for the Port Authority of NY and NJ to complete a long sought underground connection between all of Lower Manhattan’s transit

    Jan 1, 2012

  • DFI
    Arctic Emergency Operation: Deception Bay Rehabilitation

    By Jeff Starchuck, Harald Kullmann

    "In 2005, an inspection showed that the Deception Bay Wharf in the Canadian Arctic was at the end of its service life. Although Deception Bay is closed with landfast ice up to 5 ft thick, shipping ope

    Jan 1, 2009