Buttressing Berms for Stability of Cantilever Sheet Piles – Limit Equilibrium and Finite Element ApproachesBy Ali Ebrahimi, Meena L. Viswanath, John F. Beech, Mustafa B. Erten, Ming Zhu
"Excessive deformation of a cantilever sheetpile wall can occur due to dredging, excavation, backfilling, or long-term creep behavior of soil. A buttressing berm constructed in front of the wall can b
Jan 1, 2016
-
A Proposed Model For Soil/Auger Interaction During Installation Of Screw Piling Augers - SynopsisBy J. W. Slatter
Cast in situ screw piling techniques (both displacement and non displacement) have seen considerable growth in recent years due to competitive production rates, low noise and vibration free installati
Jan 1, 2000
-
Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric ProjectBy James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford
"Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock
Jan 1, 2017
-
Sustainability and Consideration of the Re-Use of Foundations for the Hurricane Deck BridgeBy Timothy C. Siegel, Paul J. Axtell
The Missouri Department of Transportation (MoDOT) recently replaced the Hurricane Deck Bridge that carries Highway 5 traffic across the Osage Arm of the Lake of the Ozarks in Camden County, Missouri.
Jan 1, 2017
-
A Numerical Model For Load Transfer And Settlement Of Bored Cast In-Situ PilesBy Joshua R. Omer
A numerical model is developed for predicting the load transfer and settlement behaviour of vertically loaded, bored cast in-situ piles. Based on analysis of full-scale pile tests, closed-form equatio
Jan 1, 2010
-
Real-Time Monitoring During Shaft Contruction For The Sound Transit Ulink I-5 UndercrossingBy Pierre Gouvin
This paper describes the design, installation and monitoring of a state of the art real time geotechnical/structural instrumentation monitoring system to facilitate tunnel construction under Interstat
Jan 1, 2010
-
Unconventional Solutions For Construction Of A Hybrid Cut-Off Wall At The Dead SeaBy Karsten Beekhaus, Sander W. Odijk, Rabea Bahlum, Mazin Adnan, Ayman Abdelh Al Nuaimat, Hassan Farhat
The Arab Potash Company, APC, is one of the 10 largest potash producers of the world. The solar ponds at the Dead Sea, used for the enrichment of the salt content in the brine, are of crucial importan
May 1, 2022
-
Design and Quality Control of Soil Mix Walls for Earth and Water Retaining StructuresBy Nicolas Denies, Jeroen de Leeuw, Bart Lameire, Jan Maertens, André Vervoort, Flip Hoefsloot, Noël Huybrechts, Flor De Cock
"In recent years, the Deep Mixing Method has increasingly been applied for the construction of earth and water retaining structures. From practice, it has been experienced that there is a real need to
Jan 1, 2015
-
Is Excess Pore Water Pressure Build Up An Engineering Demand Parameter For Excavation Analyses?By A. Felipe Uribe-Henao, Camilo Ballesteros, Luis G. Arboleda-Monsalve, David G. Zapata-Medina
Conventional excavation analysis based on total or effective stress methods can result in inaccurate estimation of ground movements when impervious soil conditions or rapid excavation sequences are no
-
Vacuum Wellpoints For Slope Stabilization In The Foundation Pit During A Dry Dock ConstructionBy Mai Yuanjian
The stabilization effect in large excavation slope with vacuum wellpoints system during construction of a dry dock located in Guangzhou is introduced in this paper. In-situ observations indicate that
Jan 1, 1991
-
2D And 3D Ansys Modeling For Deep Excavation And Evaluation Of Soil-Structure InteractionBy Yahia M. Al-Smadi
Effect of lateral loading against existing sheet pile wall and distribution of gravity loading due to various number of construction loading scenarios were studied. The objective of this effort was t
Jan 1, 2010
-
Elliptical Jet Grouting for the Sela-22 Project in New Orleans, LA: An Innovative SolutionBy Filippo Maria Leoni, Gianluca Pianezze
"As part of the Southeast Louisiana (SELA) drainage program, designed to reduce flood damages in the City of New Orleans and surrounding parishes, the SELA-22 project entailed the construction of a co
Jan 1, 2017
-
Seepage Barrier Mix Design Development, Installation, and EvaluationBy George W. Little, John Councilman
"The selection, evaluation, and modification of contractor mix designs for self-hardening seepage barriers, completed by the slurry trench excavation method, can be one of the most critical and challe
Jan 1, 2016
-
Berth Deepening A Three Decade Old Wharf Structure For The Next Generation Of Container ShipsBy Bill Paparis
The thirty year old wharf structures at the Port Authority of New York & New Jersey?s Port Elizabeth Marine Terminal are being modernized for the next generation of Post-Panamax container ships, which
Jan 1, 2013
-
Application Of Pile Test Data For The Foundation Design Of Rail Viaduct At Carrum, VictoriaBy Nick M. Withers, Suthagarann Visvalingam, Cillian Mc Colgan
The level crossings removal project in Victoria is removing 75 level crossings across Melbourne to improve safety by separating trains from traffic, with other benefits such as reduced congestion, an
Nov 1, 2022
-
Construction Of The Drilled Shaft Foundations For The Huey Long Mississippi River Bridge, New OrleansBy Dan A. Brown
The foundations at the Huey P. Long Bridge in New Orleans presented special challenges for construction due to the requirements for very deep drilled shafts in the Mississippi River beneath the existi
Jan 1, 2010
-
Data Collected and Lessons Learned from Load Test Program for ACIP Piles Supporting Highway BridgesBy Reinaldo J. Villa, Joshua C. Adams
The I-395/SR-836/I-95 reconstruction project is an $818-million design-build construction effort that includes construction of viaduct, segmental and signature bridges in Miami leading into Miami Beac
Sep 8, 2021
-
Advanced Continuous Surface Wave Testing (Acsw): Geologic And Geotechnical Site Characterization For The 21St CenturyBy David Wilshaw
Continuous Surface Wave (CSW) testing has been the “next big thing” in ground characterization for the last 25 years. The technique uses surface geophones to measure the speed at which Rayleigh waves
Oct 1, 2022
-
Deep Mixing Field Trials for Land Remediation: Some 3-Year Results from the SMiRT ProjectBy Ziyad Abunada, David O’Connor, Fei Jin, Abir Al-Tabbaa
"In-situ remediation of contaminated land with deep mixing can enable a multi-technique remedial strategy on the same site combining low permeability barriers, permeable reactive barriers, stabilisati
Jan 1, 2015
-
Drilled Shaft Foundations For The Float-In Dam On The Monongahela River At Braddock, PaBy Robert B. Bittner
The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative ?In-the-Wet? technology. A key feature of this technology involv