Energy/GHG Management Assessment Using TSM IndicatorsBy Lauri Gregg
Key Message Energy focused Change Management Process that engages operations managers is the missing tool needed to build capacity for energy/GHG management
May 1, 2007
-
Geotechnical Considerations for Underground Mining of the Dy Deposit, Faro, YukonBy Nick D. Rose
The Dy deposit is a 21 Mt Pb-Zn-Ag-Au SEDEX-type massive sulphide resource located in the Anvil District, Faro, Yukon. This relatively unexplored orebody lies at a depth of 480 to 920m below surface,
May 1, 2002
-
Process Optimization in Mining: The Next Paradigm Shift in Productivity Gain after Mechanization and AutomationBy Christoph Miller
About 80 years ago the mining industry saw an advertisement of a machine manufacturer: ?One man ? one machine?, meaning the productivity gain by using a pneumatic rock drill instead of manual tools. M
Oct 1, 2009
-
Deep Bed Thickener Operation at the EKATITM Diamond MineBy T. G. Paradis, C. A. Mohns
"This paper summarizes the Wren CAT (Clarifier and Accelerated Thickener) deep bed thickener operation at the EKATITM Diamond Mine in Canada’s Northwest Territories. EKATITMs’ thickener project is pre
Jan 1, 2000
-
Study the Effect of Crystal Structure on Milling and Liberation Performance of MineralsBy R. Venugopal, Saxena. V. K., U. Sankrityayan
"There is a dire need of a technology which can break the mineral interfaces to enhance liberation with minimum energy consumption in mineral beneficiation processes. Understanding of mineral crystal
Jan 1, 2013
-
Outlook for GoldBy Martin Murenbeeld
Outlook: Nine Bullish Arguments 1. Global fiscal and monetary reflation: PIIGS, US, etc. 2. Global imbalances: the dollar must decline 3. Global FX reserves are ?excessive?: diversification 4. Cen
May 1, 2010
-
Mine backfill design and testingBy Robert J. Mitchell
A general approach to mine backfill design, including laboratory testing procedures, is outlined in this paper. Relationships between certain design parameters are developed and the effect of other fa
Jan 1, 1979
-
Oxidation-Precipitation Method to Treat Cyanide EffluentsBy H. Soto, J. Jara, F. Nava
"A combination of oxidation and precipitation was used to eliminate cyanide from gold milling effluents. Preliminary laboratory work developed with both synthetic cyanide solutions and with industrial
Jan 1, 1992
-
Westwood Project AccelerationWestwood Quebec Long Life, Low Cost CONSTRUCTION UPDATE ? Shaft advanced to 840m (after 1 year), 3 km of down ramp and 2 km of exploration drift ? Head frame and hoist room structure completed ?
May 1, 2010
-
Environmental Relevance of the Leachate Potential for Dry Storage of Delayed CokeBy Joseph L. Fournier
Suncor Oil Sands employs delayed coking technology in converting bitumen into synthetic crude oil. Currently up to 10,000 m3 of delayed coke (coke) is produced per day as a byproduct of the upgrading
May 1, 2011
-
Coal Quality Estimation using Geophysical Logging Without Radioactive SourcesBy Filipe Beretta
This study investigates geophysical logging capacity to predict coal quality. It was analyzed for possible correlation, some parameters determined via laboratory analysis of coal against results for t
Oct 1, 2009
-
Development of a Mathematical Programming Model to Support the Planning of Short-Term MiningBy Camilo I. Morales
At present, many open pit mines are designed to operate and feed a processing plant with ore characteristics that were defined in the design of the mining business, which are not necessarily the same
Oct 1, 2009
-
Environmental and Ventilation Benefits for Underground Mining Operations Using Fuel Cell Powered Production EquipmentBy Charles Kocsis
Over the last few years a multi-faceted feasibility study has been evaluating the introduction of hydrogen fuel cell powered equipment into underground mines to replaced diesel engine powered equipmen
May 1, 2007
-
Huckleberry Mines Ltd. Process Design and Project StartupBy Greg Rasmussen
"Huckleberry Mines Ltd is an open pit porphyry copper-molybdenum mining operation located 120 km south of Houston, British Columbia with a 18,000 tpd milling facility. Huckleberry Mines is owned 60% b
Jan 1, 1998
-
Continuous Training – Insurance for Sustainable OperationBy Richard Phiri, Mike Milupi, Jackson Kapobe, Anton Lemmer, Charles Mazala
Sustainability of plant operations in a rapidly changing mining environment requires a well-trained workforce to ensure smooth running of operations. To ensure availability of trained labor, Mopani Co
Jan 1, 2019
-
Flowsheet Design Using Flotation Rate, Selectivity and RTD DataBy Manqiu Xu, Peter Wells, Gord Bacon
"A methodology is proposed for milling flowsheet design using flotation rate, selectivity and residence time distribution data. The flotation rate data and the difference in flotation rates between th
Jan 1, 2005
-
Implementation of the management safety audit systemBy Claude MacDonald, John H. Ashburn
"IntroductionIndustrial growth and technological change over recent years had been accompanied by two major sources of concern to management and employees: (a) increase in occupational injury and illn
Jan 1, 1987
-
Fast Track Reactivation -Jacobina MineMine Evaluation Engineering , Operational and Social evaluation. Focus is on what opportunities are available. Social ??History ??Past Management Practices ??Community / Available labor force Mi
May 1, 2006
-
Environmental and Reclamation Measures at Equity Silver Mines Ltd.By J. Patterson
"Acid Mine Drainage (A.M.D.) formed from oxidation of disposed pyritic wastes presents a potential pollution hazard for Equity Silver Mines Limited and the mining industry in general. Failure to colle
Jan 1, 1988
-
Backfill Practice at Copper Cliff North Mine (CCNM)By Ike Isagon
Backfilling has become an integral process in underground mining operations, with varying cost-effective forms of application. This study is a part of an overall investigation into the backfill practi
May 1, 2011