Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Oxygen Demand of Flotation Pulps

    By F. Rosenblum, P. Spira

    "Techniques were developed to determine the oxygen demand of sulphide ore pulps in the laboratory and in concentrators. The effect of variables which influence oxygen demand was studied, and it is sho

    Jan 1, 1974

  • CIM
    Review of Comminution Practice

    By Ronald E. Hamilton

    "An attempt to review the recent literature on comminution reveals at once that the subject has many ramifications and that the applications are so diverse that there are very few general statements w

    Jan 1, 1976

  • CIM
    Recovery of Platinum Group Minerals from Grinding Circuits: A Protocol for Prediction

    By N. Mejia, Z. Xiao, D. Fragomini, A. R. Laplante

    "The adaptation to platinum-group minerals (PGMs) of a protocol developed to predict gold recovery by gravity is presented. The protocol is based on three different data sets: ore characterization of

    Jan 1, 2004

  • CIM
    Overview of the Great Whale Iron Ore Project( GWIOP )

    By Jean Rosaire

    ?GWIOP Location ?Climate and Physiography ?History ?Geology ?Deposit Types ?Mineralization ?Historical Mineral Resources ?Conclusions and Work Program

    May 1, 2007

  • CIM
    Training to Process Analysis Methods using a Gold Leaching Simulator

    By Jessica Egan, Daniel Hodouin, Mohammed Reza Khalezi, Steve Bellec, Claude Bazin, Carl Duchesne

    "A model for gold leaching was developed and implemented into a simulator. The simulator uses a description of the ore that is based on the mineral composition and precious metal content. The model ac

    Jan 1, 2008

  • CIM
    A study on the effects of potash contamination on the performance of hydraulic components using fire resistant fluids

    By K. Szafran, R. E. L. Seal, M. Tansey

    Conversion of hydraulic equipment to fire resistant fluids has been hampered by less than satisfactory component performance and in some cases, catastrophic equipment failure. Concern over identifying

    Jan 1, 1988

  • CIM
    Effect of some rock mass properties on blasting-induced ground vibration wave characteristics

    By H. A. Bilgin, G. G. U. Aldas

    "Ground vibration is the natural result of the blasting process. Many empirical formulae and methodologies including analysis of travel path effects have been developed. The scaled distance, which is

    Jan 1, 2004

  • CIM
    Trends In Mineral Economics Research

    By C. George Miller

    "As the influence of governments has become more widely felt, the use of research techniques to analyze policy has increased. Mineral economics, as one of the foundations of mineral policy research, h

    Jan 1, 1976

  • CIM
    The Development of a Small Scale Test for Rapid Characterisation of Flotation Response (JKMSI)

    "The characterisation of resources and description of variability across different ore domains is key to accurate prediction of probable metallurgical performance. Such characterisation testwork often

    Jan 1, 2013

  • CIM
    Continued Development of Copper Flotation Control at the Kidd Creek Concentrator (af11f3f9-89ef-4f91-815b-39411f77be72)

    "Automatic flotation control in varying degrees of sophistication is practiced at a number of concentrators throughout the world. Practically, the variable conditions in the flotation circuit and the

    Jan 1, 1983

  • CIM
    The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical Project

    By Jan E. Nesset, Phillip J. Mackey

    "Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain

    Jan 1, 2003

  • CIM
    Real-time Assisted Driving System in Open Pit Mining Operations using Google Earth

    By E. J. Sun

    The ADS system was developed to reduce accidents related to haul trucks operating under low visibility conditions in surface mining and construction sites, which is based on the GPS, mesh-wireless net

    Oct 1, 2009

  • CIM
    Rail wear assessment techniques at FAST

    By Richard P. Reiff

    "The Facility for Accelerated Service Testing (FAST) program has been involved in numerous rail wear tests since its inception in 1976. A number of specialized tools have been developed to aid in asse

    Jan 1, 1988

  • CIM
    Recovery of thermal coal from waste dumps near Stellarton, Nova Scotia

    By L. C. Bird, N. T. L. Landgren, M. W. Mikhail

    "Through funds made available in 1972 by the Nova Scotia Department of Mines and Energy (DME) and the federal Department of Regional Economic Expansion, a program was initiated to recover saleable coa

    Jan 1, 1981

  • CIM
    Hydrochloric acid leaching of an Elliot Lake uranium ore (13a41608-dfe4-4266-9026-6b4afd0847bf)

    By G. M. Ritcey, K. E. Haque, S. H. Lucas

    "Laboratory-scale hydrochloric acid leach tests were conducted on an Elliot Lake uranium ore. Hydrochloric acid leaches without an oxidant or with molecular oxygen (i.e., air or pure oxygen gas) as an

    Jan 1, 1980

  • CIM
    New Technologies for Improved Processing of Base and Precious Metals Containing Ores

    By J. Lee, M. Peart, T. Bhambhani, D. R. Nagaraj, P. Riccio

    "Over the past decade or so, our efforts have focused on developing the rationale and concepts for new technology in reagent development and optimization in the processing of base and precious metals.

    Jan 1, 2013

  • CIM
    Ground granulated blast-furnace slag for cemented mine backfill: production and evaluation

    By E. Douglas, V. M. Malhotra

    "This report presents the results of a laboratory study undertaken to evaluate ground granulated blast-furnace slag from Algoma Steel Corporation, as a replacement for Portland cement in cemented mine

    Jan 1, 1989

  • CIM
    Design and Construction Evolution of the Kemess Mine Tailings Dam

    By Georgia J. Lysay

    The Kemess Mine tailings impoundment is retained behind an earthfill and rockfill dam that, when complete, will measure about 140 m in height with a crest length in excess of 1 km. Due to weak foundat

    May 1, 2007

  • CIM
    Hydrochloric acid leaching of an Elliot Lake uranium ore

    By G. M. Ritcey, K. E. Haque, S. H. Lucas

    "Laboratory-scale hydrochloric acid leach tests were conducted on an Elliot Lake uranium ore. Hydrochloric acid leaches without an oxidant or with molecular oxygen (i.e., air or pure oxygen gas) as an

    Jan 1, 1980

  • CIM
    A First Step towards Gas Dispersion Management: Manipulation of Gas Distribution in Flotation Circuits

    By James A. Finch, Jason S. Doucet, Cesar O. Gomez

    "Exercising control over the physical environment of flotation as a step towards process optimization is the driving force for characterizing gas dispersion in flotation cells, a subject of considerab

    Jan 1, 2006