Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Primary Breaking at Snow Lake

    By J. S. Roper

    "IntroductionSNOW LAKE is situated in northern Manitoba at latitude 54° 55 and longitude 100°, 400 miles northwesterly of Winnipeg, 80 miles northeast of The Pas, 80 miles east of Flin Flon. A 38-mile

    Jan 1, 1955

  • CIM
    A Holistic Approach To Evaluating Battery Electric Vehicles For Underground Mines

    By Nicholas Bonderoff, Amily Xu

    The evaluation of battery electric vehicles (BEVs) in underground mines involves comprehensive business case analysis beyond just the capital and operating costs of the equipment itself. BEVs demonstr

    Jan 1, 2023

  • CIM
    Water and Lixiviant Recycle for Gold Recovery Using Non-Cyanide Lixiviants

    Research on alternative lixiviants for gold is ongoing; however few people have looked at complete flowsheets. Alternative lixiviants are typically applied at concentrations 50 to 100 times those requ

    Jan 1, 2014

  • CIM
    A New Process for Treating Slimes after Copper and Nickel Electrorefining

    By A. C. Ter-Oganesyants, N. N. Anisimova, G. P. Kotukhova, G. N. Dylko

    The process utilized at Norilsk Nickel Polar Circle Division for treating slimes from the electrorefining of copper and nickel was developed in the late nineteen fifties and has survived without any f

    Jan 1, 2004

  • CIM
    An evaluation of groundwater at the Gays River Mine, Halifax County; Nova Scotia

    By T. Lamb, T. Aston

    "The Gays River Mine is located within a complex hydrological regime and underground mining environment. Early in the mine history, the operation was' affected by an inability to control mine wat

    Jan 1, 1993

  • CIM
    Pretreatment Methods for Rare Earth Element Extraction in Supercritical Carbon Dioxide

    By R. V. Fox, L. K. Sinclair, D. L. Baek

    "In this study, rare earth elements were recovered from bastnasite concentrate and waste fluorescent lamp phosphors using supercritical carbon dioxide extraction with a nitric acid/tributyl phosphate

    Jan 1, 2016

  • CIM
    Pervasive Sensor Network for Real Time Environmental Monitoring in Construction Sites

    By A. Carbonari

    In order to gain competitiveness and compete at a global level, construction companies should improve their efficiency. The problem is even more relevant in the construction field, whose work processe

    Aug 1, 2013

  • CIM
    Heap Leaching for Sustainable Development in the South African PGM Industry

    By J. M. Mwase

    The platinum group metal (PGM) industry is currently reliant on the crush-mill-float-smelt-refine route to process PGM ores. However, there are many instances where this route would not be feasible. A

    Jan 1, 2014

  • CIM
    Some Geological Characterization Techniques for Assessing Fault Influence on Deep Excavations

    By T. G. Carter

    "Damaging seismicity associated with deep faulting in both mining and civil excavations not infrequently occurs without warning, and often before proper mitigation measures have been put into place. S

    Jan 1, 2015

  • CIM
    Are We Choosing the Best-Suited Carbon for our CIP Circuits?

    By Ron Hatch, M. K. Witte

    "INTRODUCTIONThe proper selection of carbon for a gold carbon in pulp (CIP) circuit involves careful evaluation of several physical, chemical and economic factors. A series of evaluations are required

    Jan 1, 1985

  • CIM
    Oil Sands Tailings Storage Facilities: Design Considerations for Ease of Closure

    By N. A. Beier, N. Slingerland

    "Oil sands tailings impoundments rank among the largest (spatially) in the world, covering a total of approximately 220 km2 of northern Alberta, Canada. A preliminary geomorphic design for an oil sand

    Jan 1, 2019

  • CIM
    Scaling Analysis Via Geometric and Performance Data for Shovel Dipper Design

    By N. Shi, T. G. Joseph

    ABSTRACT One-twentieth-scale field trials for conventional and concept dipper designs were compared to mid- and ultra-class-sized conventional dipper performance. Digging effort was used as the perfor

    Jan 1, 2011

  • CIM
    Optimal Synthesis of Energy Supply Systems for Remote Open Pit Mines

    By M. Carvalho

    The primary motivation underlying the proposal of polygeneration systems for mine sites is to increase the efficient use of natural resources by combining different technologies and energy resources w

    Aug 1, 2013

  • CIM
    New Concepts In Refractory Linings For Copper Shaft Furnaces 1997-2007

    By B. Huffman

    This paper examines several new trends in the design and application of linings for copper melting shaft furnaces including the use of large shapes, monolithic back-up linings and improved refractory

    Jan 1, 2007

  • CIM
    Metal Vapor Treatment for Platinum Group Metals from Spent Automotive Catalyst

    By Y. Mitsuda, Y. Kayanuma, T. H. Okabe, M. Miyake

    A new process to recover platinum group metals (PGMs) from automotive catalyst scrap using metal vapor was developed. To improve the efficiency of the acid dissolution process of PGMs, metal vapor of

    Jan 1, 2004

  • CIM
    Mécanismes D’Affinage Des Grains Dans Les Alliages Al-Si En Utilisant Des Alliages Mères

    By F. H. Samuel, H. Tahiri, S. Valtierra, H. W. Doty, A. M. Samuel

    L'affinage des grains dans les alliages d'aluminium consiste à augmenter le nombre de sites de cristallisation de la phase a-Al afin d'obtenir une structure fine. Les alliages mères de

    Jan 1, 2006

  • CIM
    Grinding Circuit Design for Similco Mines (c92aaacb-9754-4479-979f-50ce395c95a4)

    By Ken Major, Anita Marks, Craig Sams

    In 2007 Copper Mountain Mining determined that there were sufficient resources to consider reopening the Similco Mine near Princeton, BC. The mill facility that had been built by Newmont Mining in 197

    Jan 1, 2012

  • CIM
    New Approach for Applying Confining Stress to a Bonded-Particle Model

    By Shantanu Patel, C. Derek Martin

    "The objective of this work is to develop a practical numerical approach for applying the confining pressure to discrete element cylindrical triaxial tests. A layer of membrane particles with very low

    Jan 1, 2015

  • CIM
    Integrated Mine Planning and Geotechnical Engineering for Northeast BC Coal Mines

    By Richard Dawson

    Increasing global demand for coking coal has initiated several new coal mine developments in northeast BC. These developments are able to take advantage of the currently under utilized infrastructure

    May 1, 2006

  • CIM
    Some Initiatives of Government to Industry Applicable to Mineral Processing

    By D. R. Winchester

    "I wish to thank you and your organizers for inviting me to address you at this point in time when we are all concerned for the future of the mineral industry in Canada.My topic ""Some Initiatives of

    Jan 1, 1983