Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Elemental Wavelet Overpressure Modelling

    Airblast overpressure legislative limits can be extremely difficult to meet throughout Australia, which has by far the most stringent limits of any nation in the world. As the difficulty in meeting th

    Jan 1, 2004

  • AUSIMM
    The Forging and Heat Treatment of Tyres and Axles

    IT is most remarkable and valuable property of mediurn and high carbon steels that they should be so susceptible to heat treatment, the wide range of variability in tenacity, ductility, etc, due to th

    Jan 1, 1926

  • AUSIMM
    Mineral Processing Plant Simulator in Continuous Surface Mining

    By R S. Suglo, G-K Er

    Mineral processing is an essential component of a mine production chain and it accounts for significant proportion of the production cost. Over the past decade, significant research progress has been

    Jan 1, 2003

  • AUSIMM
    Best Practice Tyre Application Risk Management (TYREARMÖ) at BHP BillitonÆs BMA Goonyella Riverside Mine

    By T Klinge, P Field, N Sugden, D Trenberth

    Mining remains one of the key industries in Australia and many other countries with mineral wealth. In Australia, mining contributes 8.8 per cent to the countryÆs gross domestic product (McKay et al,

    Jan 1, 2003

  • AUSIMM
    Minimising Environmental Impact of Petroleum Exploration in the Australian Arid Zone

    Petroleum exploration in the Australian arid zone has been proceeding at an ever-increasing pace, subject to financial fluctuations, since the 1960's. The impacts of petroleum exploration in

    Jan 1, 1987

  • AUSIMM
    Thermal Degradation of Lump Ore in the Top Shaft of Blast Furnaces

    By M Kilburn, A Edenton, M Adam, A Dehghan-Manshadi, R Smyth, L Lu

    The blast furnace is a counter current reactor. The counter current principle of the furnace makes it very efficient in transferring the heat and mass required to drive the reduction reactions inside

    Aug 12, 2013

  • AUSIMM
    Cobaltite in the Broken Hill Lode (03939c9c-b588-4802-a8a6-05e63bc11f8d)

    The detailed work done by Stillwell and Edwards on the occurrence of cobaltite and safilorite-Iollingite at the South Mine, followed by its presentation as a paper to the Institute, calls for, a few n

    Jan 1, 1944

  • AUSIMM
    Milling Practice at Emperor Combined Mill

    The primary object of this paper is to describe the present metallurgical practice of the Emperor Combined Mill, wherein ores from the adjoining and Associated Mining Companies, Emperor Gold Mining Co

    Jan 1, 1953

  • AUSIMM
    Recovery of Berryllia from Beryl

    By Lawrie DC

    Finely ground beryl was decomposed by mixing with ground limestone and soda ash andheating at 900¦C for,4-6, hours.The sintered material was then crushed and leached by boiling under reflux with 5N su

    Jan 1, 1963

  • AUSIMM
    Basic Aspects on Separation of Biological Flocs in Dissolved Air Flotation

    By M Ljunggren, M Lundh

    Dissolved air flotation (DAF) in wastewater treatment as a separation process of submillimetre biological flocs is based on the generation of bubble/floc aggregates. DAF is a complex process but has g

    Jan 1, 2005

  • AUSIMM
    The Geology of the Collinsville Coal Measures

    By Crapp C. E

    The Collinsville Coal Measures consist mainly of arenaceous sediments but indude eleven named coal seams. The Formation outcrops around the northern end of tbe Bowen Basin where it attains a thickness

    Jan 1, 1960

  • AUSIMM
    Practical Management of Progressive Large Failures at Minerals and Metals Group Century Mine

    Minerals and Metals Group (MMG) Century mine (Century) is a large open-cut mine in northwest Queensland approximately 2.5 km long, 1.5 km wide and 240 m deep, with an ultimate pit depth of 320 m. In 2

    May 1, 2010

  • AUSIMM
    Ore Reserve Estimation - The Systematics to Get it Right

    By S N CARRAS

    Ore reserve estimation is a procedure involving data collection, data storage and judgement and assumptions about geology mining and metallurgy. Calculations are based on these assumptions and an e

    Jan 1, 1992

  • AUSIMM
    Resue Firing and Dilution Control in Narrow Vein Mining

    Mining of narrow vein mineralisation, invariably depending on the mining method selected, involves the extraction of both ore and waste rock. The level to which mining of waste rock can be minimised d

    Jan 1, 2008

  • AUSIMM
    Accreditation

    David Pollard will raise this matter in more aetail in a later paper, but mere are some obvious points that I wish to make. It is a relatively straightforward exercise to assess the competency at a l

    Jan 1, 1994

  • AUSIMM
    Crustal Structure along Geotransect Baghdad-Dohuk, Northern Iraq

    By Toffeg A. N, Abdul-Hameed I

    More than 1000 Ian of seismic reflection data correlated to ten exploration wells along with geological, gravity and magnetic data are used to construct the subsurface structure, in particular the cry

    Jan 1, 1990

  • AUSIMM
    Financing the Smaller Mining Project can the Banks help?

    The smaller mining company with full ownership of, or participation in, a mining project is generally unable to obtain funding as easily as the major mining house. While the equity market remains t

    Jan 1, 1984

  • AUSIMM
    Robots and Mining: The Present State of Thought and Some Likely Developments

    Two recently published studies have considered whether and how robots, which have been designed for manufacturing applications, could find use in mining. The conclusions of both studies, if not identi

    Jan 1, 1985

  • AUSIMM
    Kwinana Nickel Refinery - Recent Plant Changes

    By Troman L, Groutsch J. V

    The Kwinana Nickel Refinery began operations in 1970 processing sulphide concentrates from Kambalda using the Sherritt Gordon pressure leach and hydrogen reduction process to produce nickel metal as

    Jan 1, 1996

  • AUSIMM
    Simulation of Grinding and Mineral Liberation Processes in Industrial Circuits: A Non-Linear Model

    A universal grinding circuit model suitable for an arbitrary structure of flowsheet has been suggested. In this model classifiers and mills are described in a most general form. What puts the model

    Jan 1, 1993