Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Modelling and Simulation of Cone ClassifiersBy Whiten WJ
Although cone classifiers have received little attention in the modelling of mineral processing units they are one of the oldest non-mechanical classifiers. Their use has enjoyed a revival in recent
Jan 1, 1993
-
The Design Of An Incremental Grinding Circuit Expansion At New Broken Hill Consolidated LimitedBy Chilman G. F, Lean P. J
The New Broken Hill Oonsolidated LImited (NBHC) concentrator was commissioned in 1952 and underwent a number of expansions over the next 25 years. In 1978, the decision was taken to expand further
Jan 1, 1983
-
Re-opening of Mining at Mt LyellThe Mt Lyell Mine at Queenstown, Tasmania was re-opened in 1995 by Copper Mines of Tasmania Pty Ltd, a wholly owned subsidiary of Mt Lyell Mining Co Ltd. The re-opening followed over 100 years of copp
Jan 1, 1998
-
Aims of the forumBy Tinto R
Aims of the Forum A contribution from Dr Robin Batterham, Vice President, RIO TINTO Research & Technology and a member of The AusIMM Standing Technology Advisory Qroup. Dr Robin Batterham is of view
Jan 1, 1997
-
Mature Entry Mining Students at Ballarat CAEBy Pratt IJ
A report is given of the problems of finance and physical resources that currently affect The University of New South Wales, and of some of the measures adopted to alleviate them. Partly as'
Jan 1, 1986
-
Eastern Coal Holdings (NZ) Ltd - Takitimu - The Development of a MineIts two years since we have presented at this conference and since that time we have made significant progress with our coal developments in New Zealand. In 2005 we held the Whareatea West exploration
Jan 1, 2007
-
Common Law Damages Claims-Their Implications on Mining ManagementThroughout industry in Australia, time lost through work accidents and illness is three times greater than strikes. In 1978 in New South Wales alone, 400 workers died, 125,000 were injured, 6,000
Jan 1, 1982
-
The Proving of Coal Deposits Preparatory to Underground Mine PlanningIn the exploration of an area proposed for the establishment of an underground colliery, consideration of all land and mining titles and consents has early priority. Environmental aspects have bec
Jan 1, 1976
-
The Re-Opening of the Morning Star Gold Mine: A Case Study of the Ongoing Environmental Monitoring and PlanningBy E Hogan, M Goodz, R Wright
The planning, permitting and monitoring procedures of the re-opening and rehabilitation of mine sites is an ongoing process which must continue throughout and beyond the life of the project. Both indu
Jan 1, 1992
-
Commissioning and Operation of the Pressure Oxidation Circuit at Porgera, PNGPorgera is located in the Central Highlands of Papua New Guinea. Porgera Joint Venture treats a high grade epithennal gold deposit. Most of the gold occurs as submicroscopic particles in a sulphide ma
Jan 1, 1992
-
The Role of Chemicals from Petroleum in IndustryChemicals derived from petroleum raw materials satisfy so much of our industrial needs today that it is good to pause and realise two things -ò the petroleum chemical industry is so new, and the use o
Jan 1, 1962
-
Phase Equilibria and Thermodynamics of Zinc Fuming SlagsBy P Hayes, B Zhao
A range of materials are treated in zinc fuming processes to recover metal values and produce benign slag waste products. The selection of the optimum process conditions in these various technologies
Jan 1, 2000
-
Gold in ArsenopyriteBy Robinson BW, Walker RK
Using a new highly stable automated electron microprobe analyser, detection limits for gold in arsenopyrite have been improved. Using the AuLA emission tine at 40kV and 500nA, a limit of approximat
Jan 1, 1989
-
Coal Production Scheduling Optimisation of Single Seam Open-Cast MiningBy E Kozan
The paper presents new developments of the methodology of open pit coal production scheduling optimisation. They deal with the specific features of the exploitation of single coal seam and utilisation
Jan 1, 2003
-
Application of Lerchs-Grossman Pit Optimization to the Design of Open Pit MinesBy Whittle J
Definition of the optimum open pit, whether an intermediate phase or final design, will be sensitive to many factors. The most basic will include geological and mining constraints, mining and proc
Jan 1, 1986
-
Highwall Mapping Using Advanced Terrestrial Photogrammetry at BM Alliance Coal Operations, QueenslandHistorically BHP Billiton Alliance Coal Operations Pty Ltd (BMA) have generated resource models from widely spaced data points (drill holes). The accuracy of these models has been influenced by the de
Jan 1, 2005
-
Mining Subsidence In N.S.W. - Recent DevelopmentsBy Mould G. R
The paper presents a general background to the subsidence research programme being undertaken by the Department of Mineral Resources and Development in New South Wales. The results of the studies u
Jan 1, 1980
-
Injury Statistics - An Impoprtant toolAXTAT is a computerised system developed by the Western Australian Department of Minerals and Energy in conjunction with the local mining industry for recording and retrieving information about fata
Jan 1, 1996
-
The Financing of New Resource-based Projects in the Next DecadeDepending upon the probability one assigns to project go-ahead, up to $10 billion (1978 figures) could be required for resource based projects in Australia in the next decade. In the past major reso
Jan 1, 1979
-
Mining Over 100 Stopes Per Year? ù The Perilya Broken Hill Approach to Mine PlanningBy C Mroczek, B Mitchell
Perilya Broken Hill, from its inception, has budgeted for more than 2.0 million tonnes per year from the Southern Operations. This tonnage was planned to come from in excess of 100 stopes per year in
Jan 1, 2005