Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geotechnical Aspects of Open Stope Design at BHP Cannington

    Open stoping dimensions are typically controlled by a number of factors including production drilling capacity, scheduling, fill constraints, orebody dimensions and host wall rock conditions. Frequent

    Jan 1, 2000

  • AUSIMM
    The Concept Of Drilling Supply And Service Contracts

    Drilling is one of the most, significant cost components of any stoping or develop- ment operation. Two of the factors contri- buting to the drilling cost are the supply and servicing of consumable

    Jan 1, 1977

  • AUSIMM
    Fluid Flow in a Nickel Flash Smelter - A Simulations Study

    By Hall T. P, Taylor R. N

    Fluid flow in a 1:14 scale water model of the shaft and settler of the Kalgoorlie Nickel flash smelter has been investigated by flow visualisation and numerical modelling. Detailed flow fields throu

    Jan 1, 1992

  • AUSIMM
    Dragline Bucket Location Using Machine Vision

    By Hainsworth D, Winstanley G, Gurgenci H, Corke P

    Past experience has shown that the automation of the dragline swing motion requires real time monitoring of the bucket position. A current project at the Centre for Mining Technology and Equipment (

    Jan 1, 1995

  • AUSIMM
    The Kanowna Belle Project Progress Towards the Underground Mine

    The Kanowna Belle deposit was discovered in 1990 following encouraging assays from soil sampling and RAB drilling. At the end of September 1993, diamond drilling had been completed to a vertical dept

    Jan 1, 1990

  • AUSIMM
    In-Pit Crushing and Conveying (IPCC) - A Tried and Tested Alternative to Trucks

    By A Cooper

    The current financial climate has given rise to fears that falling mineral prices and tight credit will force mining companies to cut back on production and new project development in a bid to cut cos

    Jan 1, 2009

  • AUSIMM
    Recent Developments at Renison

    The collapse of the I.T.C., the subsequent fall in the price of Tin, and the lifting of quotas saw the Renison concentrator resuming full seven- day operations at maximum capacity in 1985/86. Perform

    Jan 1, 1988

  • AUSIMM
    The Design and Construction of Intersection in Situ Tunnel Openings in the Murl Project

    The four major contracts for the construction of Museum Station are: 1) Installation of Soldier Piles, 2) Structural Contract including the temporary support, 3) Architectural Finishes which include

    Jan 1, 1981

  • AUSIMM
    Mount Isa Copper Mines ù Stope Design in the Southern Hanging Wall Lens

    XstrataÆs Mount Isa Copper Operations (MICO) is a world-class mining operation producing in excess of six million tonnes of copper ore per annum from its underground mining operations. The Mount Isa C

    Jan 1, 2006

  • AUSIMM
    The Response of Powered Supports and Pillars to Initial Longwalling Under a Strong Main Roof

    By Pala J

    The Ellalong Colliery has been the first to mine the Greta Seam using the longwall method. Analysis of data from geotechnical monitoring has pointed to the role of the strong, massive sandstones o

    Jan 1, 1986

  • AUSIMM
    Laboratory Simulation of the Shaft Furnace Reduction of Iron Ores

    By Wright J. K

    A description is presented of the results of reduction experiments using a laboratory reduction apparatus in which simulation of the gas and temperature profiles which occur in direct reduction sh

    Jan 1, 1987

  • AUSIMM
    Blair Anthol Coal Mine Project a Case History in Planning and Management

    By Maxwell HW

    Pacific Coal Pty Limited (a wholly owned subsidiary of CRA Limited) managed the interests of six members of a joint venture formed to mine and export eight million tonnes of export quality steamin

    Jan 1, 1986

  • AUSIMM
    The Geology and the Highly Selective Open Cut Mining Method of the Small, Irregular, Narrow and Low Grade St. George Orebodies at Mount Magnet

    The St George orebodies are situated within the tectonically disrupted eastern limb of the Boogardie Syncline.Highly disturbed rafts of banded chert formations occur within a sequence of felsic volcan

    Jan 1, 1984

  • AUSIMM
    Report on the Extraction and Industrial Uses of Halloysite

    New Zealand China Clays operata a plant at Matauri Bay, Northland for the benefaction of hallosite clay. Production is several thousand tonnes per year of which about ten per cent per year is supplied

    Jan 1, 1978

  • AUSIMM
    Recent Developments in Electrical Exploration

    The MIMDAS geophysical data acquisition system developed and tested by the former MIM Exploration Pty Ltd (MIMEX) is now commercially available worldwide through Geophysical Resources and Services Pty

    Jan 1, 2004

  • AUSIMM
    The Artificial Ventilation of the Broken Hill Proprietary Mine, N.S.W.

    UNLIKE coal mines, in which some form of artificial ventilation is rendered necessary by gases given off by the material mined and is also enforced by the mining laws of all countries, metalliferous m

    Jan 1, 1921

  • AUSIMM
    Rock Bolts in Current Use in Australia

    An understanding of the importance of the different components that comprise a rock bolt unit is necessary to ensure the proper use of rock bolts as a means of roof support. The various anchors, bo

    Jan 1, 1971

  • AUSIMM
    Alimak Vein Mining

    Martin Mining and Tunnelling Pty Ltd is a mining contractor with offices in Kalgoorlie, WA, Australia and Timmins, Ontario, Canada.Martin Mining and Tunnelling Pty Ltd offers services in mine contract

    Jan 1, 1993

  • AUSIMM
    Multiskilling at Woodlawn Mines

    By Nixon J

    Open pit mining began in 1978 at the Woodlawn base metals deposit. For its ten years as an open pit the mine was financially unsuccessful as a combined result of difficult metallurgy and industrial un

    Jan 1, 1992

  • AUSIMM
    Coal - Paper No. 2 The Differantation Of Macerals By Thin-Film Colouring

    When a thin film of volatile matter is deposited under vacuum on a polished coal surface, and the coated surface is examined microscopically in piano--polarized reflected light, colour changes are o

    Jan 1, 1969