    Landscape-scale Assessment of Watercourses in Remote Arid South Australia to Inform Mine Planning to Mine Closure

    By K White, C Ferguson, M Harding

    Understanding watercourses and river processes at a landscape scale is vital for managing risk to mining infrastructure and operations as well as minimising future environmental impacts beyond the lif

    Jun 28, 2016

  • AUSIMM
    Opening Supports to Segmental Linings – A Novel Shotcrete Support Solution

    By M Burdick, A Harding, M Krulc, M Chappell

    Substantial schedule advantages can be made on projects if cross-passage construction can occur at the same time as tunnel boring machine (TBM) operation with little or no impact on TBM logistics. How

    Sep 17, 2014

  • AUSIMM
    DeGrussa Copper Mine – mine closure experience

    By M Bellamy

    The DeGrussa copper deposit was discovered by Sandfire Resources in April 2009. Construction of the 1.6 Mt/a concentrator, open pit and underground mining operations commenced in March 2011 with first

    Mar 29, 2023

  • AUSIMM
    From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining vision

    By A Maier, M Goldner, C Gimber

    Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t

    Aug 2, 2023

  • AUSIMM
    What Causes Cracks in Rock Blasting?

    By S Nie, I Bergqvist, F Ouchterlony

    In blasting, a few or many cracks are driven from the borehole into the rock. But what causes the cracks? The most common theory of breakage consists of two stages; first the shock wave causes radial

    Jan 1, 2001

  • AUSIMM
    Obstacles to Embedding Geometallurgy Decision-Making into Operations and how to Increase Maturity of this Critical Capability

    By G McCullough, B Mutsaers, J Jessop

    "*This is an abstract only* Geometallurgical initiatives have demonstrated considerable value to operations that have trialled them. However, it is extremely difficult for these initiatives to become

    Sep 29, 2013

  • AUSIMM
    Secondary means of egress via emergency gig

    By R Austerberry, S Green

    The discovery of the Cuffley Lode at Mandalay Resources Costerfield Operations provided an opportunity to extend mine life via mining the offset depth extension of the previously worked Alison Mine. A

    Mar 15, 2021

  • AUSIMM
    Strategic short-term geotechnical design

    By K T. Mandisodza, T J. Cartledge

    The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d

    Jun 22, 2022

  • AUSIMM
    Interactive Modelling and Visualisation of Large Deposits Using Linear Octrees

    Large deposits present computational challenges to todayÆs commercial orebody modelling systems that are based on conventional block models. We describe a system that is specifically engineered to mod

    Sep 26, 2011

  • AUSIMM
    Flotation machine gas characterisation – variation between different types of flotation machines

    By D Felipe, G J. Harbort

    In the past 40 years substantial changes have occurred in flotation machines. This has included increases in mechanical cell size to 630 m3 , significant changes to flotation column aeration design

    Aug 24, 2022

  • AUSIMM
    Localised Uniform Conditioning in the Multivariate Case - An Application to a Porphyry Copper Gold Deposit

    By W Assibey-Bonsu

    The paper provides a brief review of the multivariate uniform conditioning and the localised multivariate uniform conditioning techniques and presents a case study based on a porphyry copper gold depo

    Sep 26, 2011

  • AUSIMM
    Comparison of the Generation of Shear Wave with Different Simulation Approaches

    By M Chen, Q D. Gao, Y G. Hu, P Yan, W B. Lu

    The safety and stability of construction structures are often affected by blast-induced waves. Investigating the generation mechanism of shear wave (S-wave) during blasting is important, because it ha

    Aug 24, 2015

  • AUSIMM
    Truck Haulage Improvements at the Phu Kham Mine – the Journey to 97 per cent Utilisation of Availability

    By S P. Young, K R. Monro

    Reducing metal prices have forced mining operations to become more efficient and innovate in order to do more with the existing base. Much of this effort has focused on improving the efficiency of loa

    Jun 22, 2016

  • AUSIMM
    Measuring the influence of a sublevel cave on open stoping at Telfer

    By J Maxlow, M J. Woods, M P. Sandy

    The Newcrest Mining Limited Telfer operation comprises both open pit and underground operations producing gold and copper. The underground operation is made up of three production areas, the sublevel

    Nov 29, 2022

  • AUSIMM
    The Pre-Feasibility Study – Big Choices, Little Time

    By D J. Logan, J Jackson

    "As of 1 December 2014, the 2012 edition of the JORC Code requires Ore Reserves to be defined by studies at the pre-feasibility or feasibility level. This paper examines how the pathway for most minin

    Mar 8, 2016

  • AUSIMM
    A 2000 Channel Mine-Wide Data Acquisition System

    By Smith I. K

    A Data Acquisition System with a capacity to monitor 2000 analog instruments has been installed at the mines operated by the Zinc Lorporation, Limited and New broken hill Consolidated Limited (ZC/

    Jan 1, 1983

  • AUSIMM
    Using Geometallurgy during Process Optimisation Activities at the Southern Middleback Ranges Magnetite Concentrator

    By D Olwagen, C Stanton, J Gerber

    From December 2013 to February 2014 the Southern Middleback Ranges magnetite concentrator went through a successful optimisation process that included the installation of extra grinding power to treat

    Jul 13, 2015

  • AUSIMM
    Scheduling of Short Strike Length, Multiseam Dragline Operations

    By Carrucan M. J

    Costain Resources Limited operates two open cut coal mines in the Hunter Valley coalfields of New South Wales, Ravensworth Mine and Warkworth Mine. The location of the Ravensworth operation is shown i

    Jan 1, 1992

  • AUSIMM
    Development of the West Cliff Extended Project

    In the Illawarra District of New South Wales, Mines were traditionally developed from the seabord. The advantages were close access to the working faces and a minimal depth of cover. Travelling ti

    Jan 1, 1983

  • AUSIMM
    Design Of Longhole Open Stoping At New Broken Hill Consolidated Limited With Particular Reference To Sloped Wall Mining

    The progress of longhole open stoping (LHOS) at The Zinc Corporation, Limited and New Broken Hill Consolidated Limited (ZC/NBHC) is described. The design of a novel sloped wall longhole stoping me