Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Developing Mineral Reporting Competency

    By J Coombes

    The JORC Code lists the three core principles of Transparency, Materiality and Competency as fundamental to how mineral estimates are publicly reported. But where the principles of Transparency and Ma

    Aug 22, 2011

  • AUSIMM
    Prediction of Burden at the Sungun Copper Mine by Artificial Neural Network

    By H Khoshrou, A Siamaki

    Blast designs can have productive and non-productive impacts on downstream stages, mine productivity and operating costs. On the other hand, ground vibration, fragmentation, and back break caused by b

    Sep 26, 2011

  • AUSIMM
    Envisioning the rehabilitation of assets through co-design and gamification

    By S Grant, S Emeric, P Baker, E Jones, D Clark

    As we strive for a sustainable and resilient future, repurposing assets has become a top priority. In Australia alone, we have a significant number of mineral projects in the pipeline, extensive exist

    Aug 2, 2023

  • AUSIMM
    Detecting Sampling Biases in Metal Accounting

    By L Lachance, F Flament, D Leroux, S Gariépy

    The pervasiveness of poor sampling practices in and around mineral processing plants could seem intriguing in view of the various documented evidences both for causes and consequences. To this extent,

    Jul 29, 2014

  • AUSIMM
    Controlled Explosives Demolition of Concrete Bridge – Canberra 2010: Blast Design, Procedures, Risk Assessment and Execution

    By N Elith

    The explosives demolition of a post-stressed, steel reinforced, concrete road bridge in Australia’s capital city, Canberra. The bridge was 50 m from the new replacement bridge, 320 m from community st

    Nov 8, 2011

  • AUSIMM
    Geometallurgical Mapping and Modelling of Comminution Performance at the Cadia East Porphyry Deposit

    By L Keeney

    Cu-Au porphyry deposits are large tonnage low-grade resources dependent on processing large volumes of material. The ability to understand and predict comminution performance is critical, as it is fre

    Sep 5, 2011

  • AUSIMM
    Case study of a practicable, risk-based solution in response to new regulatory approaches to Mining Health and Safety using Queensland Recognised Standard 22 (Management Structure for the development and implementation of the SHMS)

    By S Amor, A Beasley

    This paper provides an example of how industry can respond to the implementation of new regulatory approaches to mining risk, health and safety by adopting a robust, practical, software-based approach

    Apr 16, 2024

  • AUSIMM
    Situational 3D variography – determining the variogram in the context of geology

    By P Gleeson, J Coombes, P Suresh, T McLennan

    The last 20 years have seen a dramatic rise in the use of 3D visualisation and modelling for geological data, but there has been relatively little effort to do the same for the variogram models that u

    Sep 20, 2017

  • AUSIMM
    Evaluation and Implementation of Duratray Suspended Dump Bodies for Haulage Fleet Replacement at the Iron Ore Company of Canada

    By R Ashworth, S J. Hall

    During trials which began in May 2005, traditional steel dump bodies for transporting iron ore on 220-tonne haul trucks at a Labrador iron ore mine were compared to a novel rubber suspended dump body.

    Jan 1, 2007

  • AUSIMM
    Iron Ore Mine Reconciliation ù A Case Study From Sishen Iron Ore Mine, South Africa

    By R Moller

    Reconciliation at large iron ore operations is a complex and time- consuming process. Often the volume of data and the large range of different stakeholders makes the process almost impossible. Up unt

    Jan 1, 2005

  • AUSIMM
    Design of raise caving operations in LKAB mines

    By T Ladinig

    Raise caving is a novel cave mining method, which has been proposed for mass mining at increasing mining depths in LKAB operations. The method makes use of the raise mining technology and an active st

    Mar 29, 2023

  • AUSIMM
    Modelling Full-scale Blast Heave with Three-dimensional Distinct Elements and Parallel Processing

    By A Tawadrous, B Wheeler, D S. Preece, S A. Silling

    The two key results of rock blasting are fragmentation and movement of geomaterials. Movement/flow of the blasted rock is often referred to as heave. Moving rock with explosives rather than mechanical

    Aug 24, 2015

  • AUSIMM
    Justifying Slope Design Risks and Costs

    By N M. Player, R P. Varden, E Jones

    "An effective geotechnical design provides an accurate and appropriate assessment, balanced with a mining company’s risk profile. Justifying the cost of slope assessment requires an understanding of t

    Nov 15, 2016

  • AUSIMM
    Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning Scheduler

    By D R. Seaman, R P. Tooher, B A. Seaman

    "Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove

    Oct 10, 2016

  • AUSIMM
    A Managed Approach to Project Insurance

    Historically the insurance industryÆs involvement in any project has been relatively late in the process. Often it was a case of the last item to be ticked off the checklist has been to ensure that th

    Jan 1, 2007

  • AUSIMM
    Environmental Variables at Bauxite Mine

    By A Romanel, M S. Kato, M P. Piermatei, P Artioli

    "Brazil is the sixth worldwide producer of aluminum and Votorantim (Metals) has been operating three bauxite open pit mines in a particular way of working. In those the deposits occur on the top of hi

    Jul 10, 2012

  • AUSIMM
    A review of dynamic energy-absorbing cable bolts

    By P Craig, M Holden, C Zhang, D Foster, J Oh, S Saydam, J Liu, H L. Ramandi, S Akdag

    High stress in rock masses can cause significant instability problems such as squeezing deformation in soft rock and rock bursts in hard rock. The support system applied in burst-prone areas in high-s

    Nov 29, 2022

  • AUSIMM
    Empirical geostatistics #1 – kriging slope of regression: sensitivities and impacts on estimation, classification and final selection

    By D Kentwell

    IGO Ltd’s (IGO) Nova Operation (Nova) is 160 km east-north-east of the town of Norseman in Western Australia (WA). Discovered by Sirius Resources NL (Sirius) in 2012 and acquired by IGO in 2015, the N

    Mar 22, 2022

  • AUSIMM
    The design and implementation of the Kibali gold mine off-shaft development

    By T Peters

    The Kibali Gold Mine is currently comprised of several open pits, a 3.5 Mtpa underground mine and a 7.5 Mtpa processing plant. Development of the underground operation commenced in December 2012, with

    Mar 29, 2023

  • AUSIMM
    Challenging the Norm – Alternative Excavation Method in Mining

    By R Burke, G Ramage, C Donnelly

    Over the decades, Redpath has undertaken a multitude of tunnelling and underground excavation projects for civil and mining clients both domestically and internationally. These projects have been unde

    Mar 24, 2014