Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Ausmelt Technology for Recycling Industrial Wastes Using the Catalytic Waste Converter

    The Ausmelt Catalytic Waste Converter (CWC) has been developed for use in the treatment of industrial wastes and for the recycling of secondary materials. Ausmelt Technology uses a top submerged lance

    Jan 1, 2002

  • AUSIMM
    Thermodynamic of the Coal Reduction Process for the Upgrading of Ilmenite

    By Merritt RR

    The equilibrium phase relations in the Fe- Mn-Ti-0-S system were established at 1380 and 1485 K. The elemental distributions between the equilibrium phases were obtained by chemical- ly analysing se

    Jan 1, 1980

  • AUSIMM
    The Resource and Reserve Reporting Challenge for a Global Mining Company

    There are significant Mineral Resource and Reserve reporting challenges facing a mining company operating in the global arena. This paper specifically examines the Mineral Resource and Reserve reporti

    Jan 1, 2002

  • AUSIMM
    The Use of the Vanyukov Process for Processing Nickel Containing Charge

    By Sorokin M, Komkov A, Fyodorov A

    The Vanyukov Process is a high-intensity smelting system that has been proven over the last 20 years for various metallurgical operations including the smelting of copper, nickel, copper-zinc, antim

    Jan 1, 1996

  • AUSIMM
    A Case Study Of Reserves Estimation For A Strip Coal Mine

    Utah Development Company began prospecting for coking coal in 1961 and Blackwater Mine became a reality in June 1967. Exploratory and develop- ment drilling has been a continuing effort and reserves

    Jan 1, 1979

  • AUSIMM
    Benchmarking ù A Practical Technique for Measuring and Improving Operational Performance

    By P J. Harper

    Maximising shareholder value is a widely stated strategic goal of many mining companies. Mining projects can be capital intensive and achieving good returns is essential to encourage future investment

    Jan 1, 2005

  • AUSIMM
    A Facies Model for an Active Composite Volcano: Ruapehu, New Zealand

    By Houghton BF

    Ruapehu is an extremely active andesitic composite volcano, built in at least four cone- building episodes over the last 250 ka. The volcano was constructed by a variety of extrusive and subplinian

    Jan 1, 1987

  • AUSIMM
    Maintenance Requirements and Procedures for Underground Mobile Equipment, C.S.A. Mine, Cobar

    The maintenance system for underground mobile equipment at Cobar Mines Pty. Ltd. has been modified from that originally planned as a result of experience gained in operating the equipment.Downtime due

    Jan 1, 1969

  • AUSIMM
    The Development of L.D. Slag as an Aggregate for Road Construction

    By Stephenson IM

    Research to develop the use of L.D.slag as an aggregate in road construc-tion is described. The chemistry and mineralogy of L.D. slags are shown to be generally similar to S. Yorkshire arc furnace sla

    Jan 1, 1979

  • AUSIMM
    The Progera Gold Project: Development of a Resource, Resource for Development?

    The Porgera gold project is now in its seventh year of operation as one of the world's prime gold mining projects in one of the most underdeveloped and remote regions of the world. The unique g

    Jan 1, 1997

  • AUSIMM
    Studies on the Design Circuit for Compact Itabirite of Conceitpo Mine

    By E S. Souza, H Delboni Jr, M F. Calixto

    This paper aims at presenting the results of laboratory, pilot plant and simulation studies for the design of the grinding circuit for the beneficiation of compact itabirites from the Conceitpo mine.

    Jan 1, 2007

  • AUSIMM
    A Novel Approach for Control and Prevention of Acid Rock Drainage

    By M Logsdon, T R. Clark, T I. Mudder

    Oxidation of pyrite and other metal sulfides is accelerated by the activity of acidophilic iron- and sulfur-oxidising microorganisms. The ideal biocide for controlling biocatalysed acid rock drainage

    Jan 1, 2003

  • AUSIMM
    Statical Calculation of Curved Wall for the Horseshoe Shaped Tunnel Lining

    The behavior of a curved wall under earth pressures for a horseshoe shaped tunnel lining is considered to be closely related to the beha vior of a vertical beam with variable flexural sti-"ness on

    Jan 1, 1987

  • AUSIMM
    A Comparison of Cyanide, Thiourea and Chlorine as Lixiviants for Gold

    By Lawrence PR, Hoffman W

    The dissolution of gold from various ore-bodies is discussed in terms of extraction rates and reagent consumptions during leaching. Gold dissolves slowly in cyanide but reagent consumptions are usuall

    Jan 1, 1984

  • AUSIMM
    Estimation of Mineral Resources/Ore Reserves for a Narrow Lode Orebody

    By Butler RD

    The Singhbhum Copper Belt is an arcuate zone of verthrusting which extends over a strike length of about 180 kilometres, located in Eastern India, 150-300 kilometres west of Calcutta. The Belt is note

    Jan 1, 1990

  • AUSIMM
    Development of an Environmental Management System for Oakbridge Limited Coal Mines

    By Bragg R, McMahon B, Lenton R

    In 1992 environmental audits were carried out at seven coal mines operated by Oakbridge Limited in the Hunter Valley and Lithgow areas of NSW. The audit reports recommended a course of action design

    Jan 1, 1995

  • AUSIMM
    A One Step Process for Manganese Leaching-Desulfurisation of Flue Gas

    By A He, J Li, J Pan, J Clout

    The removal of sulfur from SO2 containing flue gas is improved by adsorbing SO2 into solution with manganese ions as catalyser, however, burnt lime slurry has to be added to modify solution pH and the

    Jan 1, 2004

  • AUSIMM
    Development of a Treatment Method for a Low Grade Uranium Deposit

    By Kwok S, Haemmerle A

    Treatment methods for a low grade deposit at Mt. Fitch near Rum Jungle, N.T., were investigated. Physical beneficiation of the ore, sulphuric acid leaching, carbonate leaching and various methods of

    Jan 1, 1970

  • AUSIMM
    Process Design for Flocculation, Clarification and Thickening of Fine-Particle Suspensions

    The effects of process variables such as solution chemistry, flocculent type and dosage, intensity and duration of mixing, and solids type and concentration, on the performance of flocculation/clari

    Jan 1, 1993

  • AUSIMM
    Biological Treatment of Bendigo Refractory Gold Ores - Possibilities for the Future

    R F Johnston 1 ABSTRACT The possibilities for bacterial leaching of refractory gold ores found in the Central Victorian region of Australia are examined. The behaviour of bacteria, especially 77ioba

    Jan 1, 1994