Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimising Moisture Control for Zinc - Lead Sintering

    By Bowden MW

    Sintering of lead-zinc concentrates is practised by Sulphide Corporation to provide both desulfurised lump sinter feed, for simultaneous reduction to zinc and lead in the Imperial Smelting Process bla

    Jan 1, 1985

  • AUSIMM
    A Proposal for Standard Reference Material Recertification

    Largely inherited from the past and from strictly internal laboratory use, the certification of reference material using round-robin assaying is often insufficient for the use made today for external

    Jan 1, 2008

  • AUSIMM
    A Laboratory Facility For Testing Cemented Fills

    This case study describes various aspects of establishing a laboratory facility for testing chemically-cemented fill materials. The applicability of data obtained from such a facility related to m

    Jan 1, 1973

  • AUSIMM
    Rock-Masses Characterization for Underground Excavation Purposes

    During the development of Lorca tunnel project in the South-East of Spain, an in-site study has been done, with the purpose of obtaining the characteristics of the different lithological units th

    Jan 1, 1987

  • AUSIMM
    Slope Stability Radar for Monitoring Mine Walls

    Slope stability is a critical safety and production issue for open cut mines. The æslope stability radarÆ has been developed to remotely scan a rock slope to continuously measure the movement of the f

    Jan 1, 2003

  • AUSIMM
    Bore Core Evaluation For Coal Mine Design

    Much of the data required for the evaluation of mine design is obtained from bore cores. It is essential to collect data that is useful and not to overlook features which might have adverse effects

    Jan 1, 1977

  • AUSIMM
    Novel Flotation Technique for Carbonate Mineral Flotation

    By H El-Shall, R Stana a

    An innovative process for the separation of carbonaceous minerals from bulk ores is presented. In this process, the surface of carbonate minerals is reacted with acid used to nucleate CO2 bubbles at t

    Jan 1, 2005

  • AUSIMM
    Direct gold measurement for bulk ore sorting

    By Y V. Haarlem, P Coghill, N G. Cutmore, M Millen, I Carter

    Due to the low concentration of gold, ore sorting for gold has always required measuring indirect properties, such as density or colour, to allow separation on a rock by rock basis. This only works on

    Nov 10, 2020

  • AUSIMM
    Direct Force Measurement for Bubble-Particle Detachment

    By R-H Yoon

    Increasing the upper particle size limit of flotation would allow operators to increase mill throughput, save operating costs, simplify flow sheets, and increase rate of return. However, coarse partic

    Jan 1, 2005

  • AUSIMM
    Chlorine as a Suitable Lixiviant for Gold

    Chlorine as a lixiviant for gold possesses a number of significant chemical and Idnetic advantages over cyanide but because of its corrosive and vaporous nature the method of implementation needs to

    Jan 1, 1991

  • AUSIMM
    The Primary-Response Framework for Geometallurgical Variables

    By M Stewart, J Vann, S Dunham

    Geometallurgy is an emerging, cross-disciplinary field that integrates spatial models of rock properties with time-based outcomes of mining and treatment processes. Geometallurgical variables include

    Jan 1, 2009

  • AUSIMM
    Sampling for Realisation-The Practice in Japan

    Most mineral products exported from Australia to Japan, with the notable exception of coal, are purchased with weight and quality determined on discharge. Sampling of imported minerals for purpose

    Jan 1, 1976

  • AUSIMM
    Activity Models for Pyrometallurgical Processes Using STEPSOL

    By Morris A. E

    The thermodynamically-based pyrometallurgical simulation software STEPSOL (Version 3.0) provides for the modelling of activities using the Interaction Parameter Model, the Regular Solution Model, the

    Jan 1, 1992

  • AUSIMM
    Activity Models for Pyrometallurgical Processes Using STEPSOL

    By Morris A. E

    The thermodynamically-based pyrometallurgical simulation software STEPSOL (Version 3.0) provides for the modelling of activities using the Interaction Parameter Model, the Regular Solution Model, th

    Jan 1, 1991

  • AUSIMM
    Choosing a Water Collector for Matte Separation

    By Robertson GE, McLaughlin JD

    An extensive laboratory campaign was conducted to find a suitable water soluble collector to replace diphenylguanidine (DPG) in the matte separation process. The examination of the collectors was do

    Jan 1, 1993

  • AUSIMM
    Steel Wire Ropes for the Mining Industry

    The subject of steel wire ropes covers such a wide range of points that it would be impossible to deal with it fully in one paper, and in view of the apparent scarcity of published information on the

    Jan 1, 1947

  • AUSIMM
    Due Diligence Requirements for Coal Property Acquisition

    By Jr

    This paper provides a comprehensive review of the requirements of a full due diligence study for a coal property acquisition in both text and table format. From the initial scoping of the assignment,

    Jan 1, 2003

  • AUSIMM
    Blast Profile Control for Dragline Productivity Optimisation

    Against a background of deeper pits, the introduction of prestripping fleets and the need for closer control of operating costs (especially the waste removal component), Australian coal operations uti

    Jan 1, 1992

  • AUSIMM
    Planning for Optimal Post Mining Land Use

    By Thatcher R

    In areas where undeveloped land represents a scarce resource, an upgraded post mining land use can result in economic benefits to both the mining company and to the community. A study undertaken at

    Jan 1, 1987

  • AUSIMM
    Microtunnelling Solution for Bulimba Creek Trunk Sewer

    By A Domanti, C Jewkes

    This paper describes the design and constructability issues investigated in the selection of a trenchless solution in comparison to trenched construction options as part of a scoping study for the aug

    Jan 1, 2008