Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Chlorine Based Flooded Pit Leaching of Oxide Gold Deposits

    The capacity of chlorine based solutions to rapidly and effectively dissolve coarse gold in oxide ores is well established. The inherent advantages of chlorine are high dissolution rates (10 - 100 tim

    Jan 1, 1992

  • AUSIMM
    The Effects of Mining on the Geological Equilibrium at Leichhardt Colliery, Blackwater, Queensland

    The paper describes the geology, structure, stress, gas and strata geomechanical properties for Leichhardt Colliery and their reactions to mining.

    Jan 1, 1986

  • AUSIMM
    Experience With Production in a Gassy Environment, Oaky North Mine

    Problems associated with gas management become more significant as exploitation of coal reserves in the Bowen Basin in Australia becomes deeper. At Oaky North mine, relocation of production from one a

    Jan 1, 2005

  • AUSIMM
    Lump Ore Properties and Their Impact on Value-in-use in Ironmaking

    By T Honeyands, L Jelenich

    We are currently witnessing large fluctuations in the relative price of ironmaking raw materials brought on by changes in the dynamics of supply and demand, market conditions, environmental regulation

    Jul 13, 2015

  • AUSIMM
    Application of SMELT-2 Package to a Study of Continuous Converting in Sirosmelt Reactors

    By Denholm W. T

    The SMELT-2 package is specifically designed to perform on-line simulation of smelting processes. This paper describes its application to the simulation of continuous matte converting followed by r

    Jan 1, 1989

  • AUSIMM
    Assessing the volume change behaviour of red mud through laboratory and field testing

    By D J. Williams, A Shokouhi, A Naderian

    Extracting alumina from bauxite involves the production of fine-grained waste known as red mud. The highly alkaline red mud is usually neutralised by applying sea water, thickened to between 25% and 3

    Jul 23, 2018

  • AUSIMM
    Monitoring and Control of Sulphur Dioxide Emissions from the ER&S Copper Smelter

    The Electrolytic Refining and Smelting Company of Australia Limited (ER&S) operates a copper smelting and refining plant and is situated close to the heart of the highly industrialised area of Por

    Jan 1, 1984

  • AUSIMM
    Product Monitoring, Grade Control, and Ore: Waste Reconciliation at Bougainville Copper Limited (BCL)

    An effective production control system should maximise recovery of economic material from the resource. To do this, internal waste must be accurately delineated and efficiently removed. Achieving

    Jan 1, 1986

  • AUSIMM
    The Control of Rotary Vacuum Filters in a Gold Recovery Plant

    By Peverett N. F

    The purpose of filtration in a gold reco- very plant is to separate the gold bearing liquid from the solids in the slurry. Some of the gold is inevitably lost due to incomplete separation. An inves

    Jan 1, 1977

  • AUSIMM
    Geology of the Leigh Creek Coalfield

    By Townsend IJ

    The Upper Triassic Leigh Creek Coal Measures which include a number of seams of sub-bituminous black coal are preserved in four small intramontane basins. The largest is Telford Basin, 1,000 m in

    Jan 1, 1975

  • AUSIMM
    Carbon Desorption Process Development at Micron Research (Western Australia)

    By Costello MC

    An alternative process for desorbing and recovering metals from activated carbon has been developed, and is the subject of several patent applications by Micron Research (W.A.) The system uses the pr

    Jan 1, 1982

  • AUSIMM
    The Recovery of Water from a Colloidally Stable Kimberlite Suspension

    By Hunt MS

    A major diamond mining operation in South Africa is faced with the unique problem of recovering usable water from the fine tailings stream. The kimberlite ore hoisted is washed prior to crushing in

    Jan 1, 1988

  • AUSIMM
    Initiation Systems - What Does the Future Hold?

    The rapid industrialisation of the world was driven by an improved ability to utilise chemical energy. Unfortunately harnessing explosive energy did not come cheaply given the hundreds of lost live

    Jan 1, 1990

  • AUSIMM
    Moriarty was a Conglomerate – Experiences and Implications of Coal Mining under Massive Strata in the Newcastle Coalfield

    By M Creech

    During the 1990s, wider and more productive longwall panels were being introduced into the Newcastle Coalfield. The strata of the Newcastle Coalfield incorporate numerous massive sandstones and conglo

    Aug 18, 2014

  • AUSIMM
    Four Metre Diameter Raise Drilling at Olympic Dam Project S.A.

    In the first half of 1987 two four metre diameter raise bore holes were drilled at the Olympic Dam Project for ventilation purposes. The first hole, 476 m x 4.0 m diameter was completed in 96 days

    Jan 1, 1988

  • AUSIMM
    Peak Downs Mine Operations with Special Reference to Multi-Seam Stripping

    By Seymour C. A

    Peak Downs Mine, a five million tonnes a year coking coal operation, strip mines a, series of Permian coal seams. Seam thickness ranges from 0.5m to 5.0m, and seams consist of multiple coal plies w

    Jan 1, 1974

  • AUSIMM
    Rise and Pillar Rill Stoping at Golden Crown Mine

    By Rogers M, Sullivan B

    Golden Crown Mine is a narrow vein gold mine producing 75000 tpa. Production has been predominantly by shrink stoping using hand held machine and airleg. Bogging from these stopes is done with Toro 15

    Jan 1, 1993

  • AUSIMM
    Removal of Iron from Bauxite

    By Gardner H. J, Wadsley m. W

    Bauxite from the Weipa and Andoom (North Queensland) deposits was treated to provide a low-iron raw material for high- alumina refractories or aluminium chloride manufacture. The operation involved

    Jan 1, 1979

  • AUSIMM
    Red Dome Stage III Cutback - A Case Study in Brinkmanship

    By Paine G. G

    The Red Dome Gold/Copper Mine is located approximately 15 km west of the township of Chillagoe which itself is approximately 220 km by road west of Cairns, Far North Queensland. The deposit, with ot

    Jan 1, 1994

  • AUSIMM
    Some Radioisotope Applications in Mineral Processing

    By Wilkinson LR

    The object of this paper is to present a brief overview of applications of radioisotopes in mineral processing. The emphasis is towards on-line applications, and is to present the broad picture rat

    Jan 1, 1978