Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Concepts for Calculating Recoverable Reserves for Selective Mining in Open Pit Gold Operations

    The key concepts relating to the calculation of recoverable reserves for selective mining in open pit gold operations are discussed. While the general concepts are relevant to a wide range of gold ore

    Jan 1, 1986

  • AUSIMM
    Bioflotation of Sarcheshmeh Copper Sulfide Ore

    By Y S. M Tabatabaei, R Hosseini Tabata

    Application of Acidithiobacillus ferrooxidans bacteria to flotation of Sarcheshmeh low-grade copper sulfide ore was studied. Sarcheshmeh low-grade ore contains pyrite, which causes some problems in th

    Jan 1, 2004

  • AUSIMM
    Beyond Grade Control - Broken Links in the Chain of Value

    By A Weeks an, R Bertinshaw, S Khosrowshahi

    Good mining is central to any approach to value tracking. Good mining occurs where the ore is correctly delineated, measured and fed to the mill. This process is usually referred to as grade control,

    Jan 1, 2002

  • AUSIMM
    Reducing Mining and Mineral Processing Plant Fatality Rates

    By N Cann

    In the 10 years from 1998 to 2008 the annual number of fatalities in the Australian mining industry has plateaued (MCA, 2007-08 and abc.net.au website). Despite significant efforts to eliminate fatali

    Aug 8, 2011

  • AUSIMM
    The Status of Implementation of Proximity Detection Systems in Underground Mines

    By D Kent

    The introduction of digital technologies into the underground mining industry, in both coal and hard rock mining, has enabled many high bandwidth applications to be adopted by mines.Digital networks b

    Mar 21, 2011

  • AUSIMM
    Average Relative Error in Geochemical Determinations - Clarification, Calculation and a Plea for Consistency

    By C R. Stanley, D Lawie

    The measurement of error in assays collected as part of a mineral exploration program or mining operation, including errors introduced during sampling, sample preparation, or geochemical analysis, his

    Aug 21, 2012

  • AUSIMM
    An Alternative Circuit for Chalcopyrite-Pyrite Ores with Elevated Pyrite Content in Cu-Au Ore Treatment

    By S Farrokhpay, C Akop

    Copper-gold-pyrite ore types with an elevated pyrite head grade utilise a sequential flotation circuit to recover initially a copper-gold concentrate with a pyrite-gold concentrate being produced from

    Sep 1, 2014

  • AUSIMM
    21st century relining – the path to greater mine site profitability

    By P Rubie, J Russell

    This paper looks at the past, present and not too distant future of grinding mill relining.Since the adoption of autogenous grinding (AG) mills and semi-autogenous grinding (SAG) mills as the primary

    Aug 29, 2018

  • AUSIMM
    Tunnelling in the Andes in Chile – By Drill and Blast and Tunnel Boring Machine

    By R Fletcher

    Pacific Hydro, a leading renewable energy company from Australia, is developing a series of cascading run-of-river hydro electricity projects in the Cachapoal Valley at the base of the Andes Mountains

    Mar 8, 2011

  • AUSIMM
    Control and Monitoring of International Organization for Standardization Compliance for Industrial Sampling Systems

    By R Shaw, T T. Neidel, C Adams

    Sampling equipment manufacturers endeavour to ensure that the mechanical equipment installed in sampling systems are designed and manufactured to adhere to the requirements of the International Organi

    Jul 29, 2014

  • AUSIMM
    Online FTIR analysis for improved efficiency in alumina production

    By K Haroon, J D. Speed, S P. Wood

    Online analysis of continuous and batch processes has seen a dramatic increase in recent years, with examples ranging from petrochemicals to pharmaceuticals, to industrial biotechnology and food and d

    Aug 24, 2022

  • AUSIMM
    Numerical Simulation of the Drainage in a Mining Stope Filled with Hydraulic Backfill

    By S Servant

    In the mine of this study, cemented hydraulic backfill is placed under the form of a slurry at a percentage of solid by weight varying from 50 to 65 per cent. This slurry settles and cures in the stop

    Jan 1, 1998

  • AUSIMM
    Application of Engineering Discipline and a Full-process Optimisation Focus – Productivity to Profitability without Profuse Pruning

    By W R. Adamson

    "Optimisation of drill and blast design and engineering can deliver a significant positive impact on the profitability of any mining operation; however, true engineering of the blasting process is les

    Aug 24, 2015

  • AUSIMM
    New Rosebery - Discovering the Next 20 Years

    Rosebery Mine is situated on the west coast of Tasmania and is AustraliaÆs largest volcanic-hosted base and precious metals deposit (zinc, lead, copper, gold and silver). The milling operation has bee

    Jan 1, 2008

  • AUSIMM
    The Challenges for Mining Posed by Emerging Water Protection Legislation in Former Soviet Union Countries

    Mining projects have long since presented challenges for the protection of the water environment. Lessons learnt from historical pollution incidents and increasingly stringent environmental controls h

    Jan 1, 2006

  • AUSIMM
    Methodology for Calculating the Closure Water Balance for an Acid Generating Tailings Impoundment

    By G W. Wilson

    Rehabilitation of tailings impoundments is one of the most challenging aspects in mine closure, as not only does the potential for producing leachate pose a challenge to the rehabilitation designer, b

    Jan 1, 2003

  • AUSIMM
    Design of Hydraulic Backfill Distribution Systems - Lessons From Case Studies

    By D Gericke, R Cooke

    This paper presents an assessment of the status in design and operation of deep level backfill distribution systems by referring to case studies and practical experience. The improvements in design an

    Jan 1, 1998

  • AUSIMM
    A case study in managing a high consequence geotechnical risk in a Queensland coalmine

    By K Young, M Martin, D Payne

    This paper outlines the evolution of managing high consequence risk scenarios in BHP Coal, with particular focus on managing the stability of an endwall that is adjacent to a public infrastructure cor

    Nov 29, 2022

  • AUSIMM
    The Development of a KPI and Metallurgical Accounting Systems at Nabalco

    By J Barnes

    During September 2000, Nabalco management identified the need for a corporate system to deliver its key performance indicators (KPIs). In June 2001, a need was also identified to replace the existing

    Jan 1, 2002

  • AUSIMM
    I Think, Therefore I Add Value – Philosophy of Science as a Practical Tool for the Mine Geologist

    By J Vann

    The philosophical context of many activities in mine geology can be an important lever in adding value to operations. For mine geologists (including resource and grade control geologists) we argue tha

    Aug 22, 2011