Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Advanced Design Concept on Largest Diesel-Mechanical Truck-Komatsu HD1600M

    By Kato Y

    As a direct result of the Mining Industries need to improve efficiency and production in Open Pit type operations, the size of haulage units have increased dramatically. This trend has continued su

    Jan 1, 1982

  • AUSIMM
    The importance of the curing stage in the fixation of arsenic in pressure oxidation

    By M Chen, W S. Ng, Y Liu

    In the processing of refractory gold-bearing sulfides, pressure oxidation (POX) is commonly known for its role in liberating the gold in solid-solution via oxidation of the sulfide occlusions. For dep

    Aug 24, 2022

  • AUSIMM
    Effective Contracting Through Partnering

    By Stewart R. D, Lawrence W, Youl M. J

    The trend towards contracting by major coal mining companies such as BHP Coal and MIM Ltd is examined. Reasons why this trend is occurring are discussed and the concept of partnering is examined.

    Jan 1, 1997

  • AUSIMM
    Tunnelling within the Bunya Phyllite of Legacy Way, Brisbane, Queensland

    By M Norbert, C Bennett

    The Legacy Way Tunnel was constructed from Toowong to Kelvin Grove in Brisbane, and is the first large-scale underground excavation in the Bunya Phyllite in Brisbane. The Legacy Way Tunnel is 4.3 km i

    Sep 17, 2014

  • AUSIMM
    The Behaviour of Cobalt During Nickel Smelting Converting

    This paper outlines the thermodynamic and mass balance principles which affect the distribution of cobalt between matte and slag during the pyrometallurgical treatment of nickel - copper sulphides

    Jan 1, 1992

  • AUSIMM
    The Application Of Drag Pick Rock Cutting Machines In Metalliferous Mining

    Drag pick roadheaders and continuous miners have been applied in the coal mining industry for several decades, having replaced drill-blast methods as the primary means of excavating coal and coal-

    Jan 1, 1987

  • AUSIMM
    An approach for evaluating a liberation function

    By Massacci P

    A review has been made of the studies focusing on methods for the description of grain -size distribution after breakage and, separa- tely, of the degree of liberation of the miner- al species makin

    Jan 1, 1986

  • AUSIMM
    Development of Robot System for Automatic Assembling of Bolted Segments

    By Harada M, Katsuta S

    In order to shorten the time taken to com- plete shield tunnel excavation work, reduce labor costs and to improve safety, an automatic assembly robot system for the segments used has been developed

    Jan 1, 1987

  • AUSIMM
    Inrushes and Subsidence

    By S Harvey

    An inrush of water or mud into an underground mine, or sudden subsidence above mining voids represent low probability but high impact risks in underground mining. About two such incidents involving mu

    Jan 1, 1998

  • AUSIMM
    Copper Converter Slag Treatment at Mount Isa Mines Limited, Mount Isa, Qld

    By Hare S. M, Lumsdaine I, O&apos

    Converter slag assaying 3.7 per cent Cu is produced by Mount Isa copper smelter at a rate of up to 180 000 tonnes per annum.Priority is given to the processing of ore, however concentrator capacity pe

    Jan 1, 1993

  • AUSIMM
    Visualising risk – proactive is better than reactive

    By S Withell, K Sheehan

    Whitehaven Coal (WHC) is undergoing a transformative journey, deeply committed to the principles of a High Reliability Organisation (HRO) and the establishment of a mature, interdependent culture foun

    Apr 16, 2024

  • AUSIMM
    Removal of phosphorus and gangue minerals from iron ore by a combined approach of alkaline drying and reverse flotation

    By A Batnasan, K Haga, A Shibayama, K Higuchi, H Takeuchi

    High silica (SiO2), alumina (Al2O3), and phosphorus (P) contents in iron ore adversely affect the quality of iron products. The removal of those impurities from iron ore is an essential point in furth

    Sep 18, 2023

  • AUSIMM
    Responsible Tailings Management

    By J Boshoff

    The management and operation of tailings storage facilities (TSFs) are often neglected until the process plant has to shut down as a result of this negligence or as a result of a catastrophic failure

    Jul 27, 2015

  • AUSIMM
    The Effects of Increased Salinity on Microbially Mediated Ecosystem Processes in Ephemeral Streams

    By J L. Kerr, J Beyer-Robson, S Vink

    Driven by an increasing need for water conservation, coal mine operators in the upper Isaac River catchment have placed significant emphasis upon the reuse of water. This initiative led to an overall

    Nov 26, 2013

  • AUSIMM
    Paper No. 194. Geology of The Broken Hill Lode.

    By Voss Smith F, Matters C. W, Slee R. T, Coldham JC, Davies HW, Wallman H. H

    The Committee desires to thank the managers of the various mines along the line of lode for their hearty co-operation in its labours. It would also extend thanks to Messrs. J. O. Moulden, Howchin, Twe

    Jan 1, 1911

  • AUSIMM
    Industrial Relations Planning for Development Projects

    By Tyler MA

    If the record of maj or proj ects in Australia is taken into account, it is apparent, the proper planning of an industrial relations strategy for many such projects has been ill considered by proj

    Jan 1, 1983

  • AUSIMM
    Mine Planning and Geotechnical Considerations in the Development of the Western Baters of Yallourn Open Cut Mine

    By Tilley H. L

    The 90 m deep Yallourn Open Cut brown coal mine in the Latrobe Valley, Victoria is developing into an area close to a reverse fault. A major batter stabilisation program, matched to ongoing operatio

    Jan 1, 1989

  • AUSIMM
    Inadequate Water Management Planning Resulting in Long-term Closure Liabilities

    By H J. J Boshoff

    Mine closure planning integrated into life-of-mine (LOM) planning during the operational phase consists of many subcategories. One of these subcategories that needs to be fully integrated into the LOM

    Jul 16, 2014

  • AUSIMM
    Competitiveness of Australian Coal in Relation to Transport Distance

    By Gillies A. D S

    Rail, port and shipping charges represent 30 to 50 per cent of landed costs for Australian coal mines selling to Asia. This proportion is higher for sales to Europe, yet it is in Europe where Austra

    Jan 1, 1994

  • AUSIMM
    Achieving 435-2540 Tonnes Per Shift from Continuous Miner Sections, A Report on the USAÆs Most Productive Coal Mines

    By Kissell F. N, Volkwein J. C

    The U.S. Department of Interior's Bureau of Mines has the opportunity to visit many U.S. mines, including some that claim 2 to 5 times the national average of 334 raw tonnes/unit shift (tps)

    Jan 1, 1988