Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Roof characterisation for hazard planning at Oaky North mine using geophysical dataBy B Vorster, T Medhurst, A Huey
Roof conditions at Oaky North Mine can be prone to stress related damage and/or time dependent degradation. The ability to identify these areas prior to mining has proved challenging using traditional
Nov 29, 2022
-
Textural Evaluation of Nickel Sulphide GossansBy Travis G. A
The Mons Cupri Cu-Pb-Zn deposit is situated within a complex Archaean volcanic sequence dominated by rhyolitic fragmental rocks. This sequence is underlain by a 150 m group of rhyolitic ash flow t
Jan 1, 1973
-
A Comparative Study of Rock, Soil and Plant Chemistry in Relation to Nickel Mineralization in the Pioneer Area, Wester AustraliaBy Smith F. A, Both R. A
The application of biogeochemical methods in mineral exploration in the semi-arid to and environment of Western Australia was investiga- ted in an area near Norseman. The reliability of these method
Jan 1, 1973
-
Design and Construction Contract C916 Beauty World Station and Tunnels, SingaporeBy R McDonough
DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal
Sep 17, 2014
-
State-of-the-Art in Monitoring Respirable Mine AerosolsBy E E. Hall, S, E D. Thimons, R J. Timko
The heart of mine ventilation science and technology is the protection of the life and health of the miner. Lung diseases that result from overexposure to various mine aerosols can largely be prevente
Jan 1, 2005
-
In-Pit Crushing and Conveying Bench OperationsBy T Atchison
In-pit crushing and conveying (IPCC) systems have come under growing scrutiny as a perceived mitigation to fuel and equipment price fluctuations, labour shortages and the need to move everincreasing v
Jul 11, 2011
-
Integrated Optimisation of Grinding and Flotation CircuitsBy P Holtham, K C. Runge, E Tabosa
Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro
Sep 1, 2014
-
Geology - Paper No. 2 Offshore Seismic And Magnetic Surveys Of The Southern Coalfields Off Stanwell ParkBy Hawkins L. V, Seedsman K
A combined reflection seismic and magnetic survey off the south coast of New South Wales has revealed six distinct reflection horizons within the Lower Triassic- Upper Permian sequence, and has ena
Jan 1, 1969
-
Laboratory Experiments to Quantify the Pull-Out Strength of Single Strand Cable Bolts for Large BoreholesIn high stress mining environments, production drill rigs are often employed for rapid drilling of boreholes for systematic cable bolting. One outcome of this drilling method is the need for larger bo
Nov 25, 2010
-
Gateroad Development - The Correct Method, the Correct Equipment?Longwall mining in Australia is approaching maturity. Longwall production from 'state of the art' Australian longwall mines now rivals similar US based longwall operations. Regrettably howev
Jan 1, 1998
-
Summary of Japanese Coal and Gas Outburst Experiences and Measures Taken Against the ProblemBy Higuchi K
In this paper, the history of Japanese coal and gas outbursts is presented and circumstances and countermeasures at the time cf outbursts are summarized statistically. Then the present meth- ods fo
Jan 1, 1986
-
Fundamental Sampling Error and Sampling Precision in Resource Estimation – A DiscussionBy N Schofield
For the sampling of particulate materials in mineral exploration and mining, the fundamental sampling error (FSE) introduced by Gy is a measure of the constitutional heterogeneity of the sample lot an
Aug 22, 2011
-
Structural Evolution of the McArthur Basin, NTBy K A Plumb
New structural studies in the Walker Fault Zone of eastern Arnhem Land are integrated with basin-wide reconnaissance observations, made to refine models for the structural evolution of the McArthur
Jan 1, 1994
-
The Network Centric MineBy G Malherbe, J Gonzalez, D C. Franklin, J Bassan, C T. Farrelly
To respond to ever-increasing challenges, mining companies have been experimenting with new business models and technologies in order to speed mine development, production, processing and transport. T
Nov 20, 2012
-
Effect of sodium sulfite on flotation behaviour of bornite and tennantiteBy G P. W Suyantara, Y Tanaka, T Hirajima, Y Aoki, K Sasaki, H Miki
The effect of sodium sulfite (Na2SO3) on the flotation behaviour of bornite and tennantite is reported in this work. Flotation tests were performed using pure minerals of bornite and tennantite under
Aug 24, 2022
-
Measuring the Effectiveness of Change through Best Practice ReconciliationBy G Pattenden, R Hargreaves, P Pettit
"Even with the cyclic nature of mining, when it comes down to it, the bottom line is that whatever direction the commodity market is going there is always a desire to improve the economics of an opera
Nov 15, 2016
-
Who is Responsible for Grade? – An Evaluation of the Value Chain at Mt Magnet Gold Project, Western AustraliaBy A Weeks, W J. Shaw, A Kuk
Grade control is a process that requires the interaction between many components of the mining operation and successful grade control is only realised through good data, robust systems, and a well-tra
Aug 18, 2014
-
The Collie River Diversion and Salinity Recovery Project ù A Case Study in Competing Values in a Competing EnvironmentBy T Sparks
The Collie River catchment, located approximately 200 km south of Perth, covers an area of around 2830 km2 and is the source of run-off to the Wellington Dam, an important irrigation water resource fo
Jan 1, 2006
-
The Application of Measurement and Modelling of Sulfidic Coal Wastes at Pacific Coal's Kestrel Mine for Use in Development of a Closure PlanBy T A. Short, P L. Brown
Kestrel Mine co-disposes around 1.5 Mt of fine (2SO4/t and to date around 9 Mt has been deposited. The mine plans to co-dispose of approximately 39 Mt of material, creating a dump with a maximum heigh
Jan 1, 2003
-
Managing the Risk of Failure in the Pit 1A Highwall at Telfer Gold Mine, Telfer WAA failure of the Pit IA highwall in July 1989 led Newcrest Mining Ltd's Telfer Gold Mine to commence underground operations approximately 12 months ahead of schedule. The failure presented four
Jan 1, 1994