Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Pipe Jacking Experience in Tunnelling Through Variable Soils, Brisbane, QLD.By Baczynski NR, Fagan MJ
A 3050m long section of a 1.65m internal diameter tunnel is presently under construction in the Brisbane area by means of the pipe-jacking method. The soils along the alignment had been deposited
Jan 1, 1987
-
XCT investigation on the generation of fatigue in autogenous grinding pebbles and its contribution to pre-weakening before fractureBy J Kuva, M Parian, B I. Pålsson
One of the main factors affecting the suitability of an ore for autogenous grinding is the ore’s competency, ie providing enough critical stones for the grinding process. Several experimental test rou
Aug 24, 2022
-
The Perseverance Gold Copper Deposit – A New Peak Mines ChallengeBy B Taylor
The Perseverance deposit is the most southerly known economic copper/gold deposit within the Cobar gold field. The deposit is situated approximately 12 km to the south-southeast of Cobar and is essent
Aug 22, 2011
-
Novel Online Analysis Applications in the Iron Ore IndustryThermo Fisher Scientific is the worldÆs leading supplier of analysers for laboratories and process industries. The companyÆs X-ray fluorescence (XRF)-based slurry immersion probes were originally deve
Jan 1, 2007
-
Review of Some Recent and Current Open Cut R&D ProjectsBy Brett J. R
Some recent and current research and development projects relating to strip type open cut coal mining are reviewed. The projects include a dragline-hopper-truck mining system, an overburden slusher
Jan 1, 1991
-
Understanding the Susceptibility of the ZA-27 Zinc Base Alloy to mAcrosegregation and Inverted Pipe FormationBy Nava-Vasquez E, Torres-Torres J, Mendez-Nonell J
The ZA-27 zinc base alloy was poured into cylindrical moulds and solidified under different conditions ie normal freezing and unidirectional freezing. In addition a cylindrical ingot with rheocast m
Jan 1, 1993
-
Copper Concentrator Practice at Mount Isa Mines Limited, Mount Isa, QldBy Hare S. M, Griffin P. T, O&apos
Chalcopyrite ore and converter slag treatment to produce copper concentrates is undertaken at the Copper Concentrator of Mount Isa Mines Limited. This concentrator was commissioned in May 1973, replac
Jan 1, 1993
-
Exclusion Zone Calculation for Underground Explosives StorageBy M B. Lovitt
At present there exist few engineering calculations and principles to determine exclusion zones for personnel in the vicinity of underground explosive storage areas. This paper is written to encourage
Mar 24, 2014
-
Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement ProjectBy M Behrens
The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th
Mar 8, 2011
-
Cost-Benefit Comparisons of Ecological Risk Against Water Management Options in the Finniss River System, AustraliaQuantitative probabilistic ecological risk assessment has been used to evaluate the likely effect on fish diversity and abundance of filtered and bioavailable metals in streamwater affected by acid dr
Jan 1, 2003
-
Lithium ore processing – an overview of the current and new processesBy N Setoudeh, A Nosrati, N J. Welham
The current surge of interest in lithium (Li) is due to the anticipated demand for electric vehicles and small scale power storage. Brine deposits contain most of the global Li resource, however hard
Sep 11, 2017
-
Dilution, Ore Grade and Blast Movement Calculation ModelBy I C. Carrasco, V G. Mirada, J F. D Domingo, F S. Leite
This paper investigates ore loss and dilution produced by rock movement in bench blasting. A total of four blasts, in which electronic detonators have been used, were monitored in Cobre Las Cruces Ope
Aug 24, 2015
-
On-Line Determination of Free and Bound Moisture in Iron OreBy Cutmore NG
The moisture content of iron ore is important in handling, stockpiling, transport and further processing operations. Typically these ores contain both `free' and `bound' moisture, the latt
Jan 1, 1993
-
An analysis of impact of weak rock formation on mining-induced deformation of rock slopeBy A Sainoki, D Fukuda, K Shioya, C Zhang, M Sharifzadeh, T Yamaguchi, S Saydam, J Kodama, C A. Amagu, Y Fuji
In an open pit mining, ensuring stability of rock slope has been one of the major challenges. As the instability of rock slopes can results in slope failures; consequently, endanger the lives of worke
Nov 29, 2022
-
Recent Developments in Dry High-intensity Magnetic Separation (484f0d02-b711-40c9-bb2f-6bf3839db77f)Rare-earth permanent magnetic roll separators, pioneered by our group a few years ago, have distinctly different operation characteristics compared to prior art electromagnetic separators of various t
Jan 1, 1990
-
Operation at Blackwater MineThe Blackwater Coal Mine is a modern open cut operation using large draglines for over- :)urden removal and shovels, loaders and trucks to mine and haul coal to the crushing and coal ?reparation pla
Jan 1, 1974
-
Conceptual and Geochemical Modelling at Mt Mackenzie, Central QueenslandHigh sulphur volcanic-hosted hydrothermal environments are favourable geological environments for gold mineralisation. Numerous world-class gold deposits including Pueblo Viejo (Dominican Republic),
Jan 1, 1994
-
Managing Geological Complexity - Beta Hunt Mine, Kambalda, Western AustraliaBy K P. Crameri
The Beta Hunt orebody is situated on the south western limb of the Kambalda dome. It is one of the nickel occurrences in the area which fall into the category of æKambalda Style OrebodiesÆ. These oreb
Jan 1, 2006
-
A Modified Software Tool for Mine Waste Rock Dump PlanningBy Z Fu, E Topal, O Erten
"Mine waste rock management involving waste rock movement and placement, is a critical aspect in the planning of open pit mining operations, as the waste rock haulage cost can be the largest portion o
Nov 15, 2016
-
Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based SimulatorsBy P Wood, S Leveritt
This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy
Sep 18, 2012