Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Intersection reinforcement with self-drilling anchors for improved productivity at Kanmantoo

    By J Jardine

    An improved ground support method for development intersections, wide spans and stope brows was implemented at Kanmantoo mine. The method uses a jumbo to simultaneously drill and install self-drilling

    Mar 29, 2023

  • AUSIMM
    Using Geostatistics to Assist in Optimising Grade Control Estimation at KCGM's Fimiston Open Pit

    By Kelly D, Moore C

    The Golden Mile, which has been mined continuously for the past 100 years by both underground and more recently open pit methods, occupies an area of 1.2 km by 4 km adjacent to the city of Kalgoorli

    Jan 1, 1994

  • AUSIMM
    Dynamic grade control modelling processes at the Waihi Underground Gold Mine

    By A Whaanga, W Vigor-Brown

    IGO Ltd’s (IGO’s) Nova-Bollinger Deposit (Nova-Bollinger) is a magmatic nickel-copper-cobalt (NiCu-Co) sulfide deposit found 160 km east-north-east of the town of Norseman in Western Australia (WA). T

    Mar 22, 2022

  • AUSIMM
    Australia's First and Second Nickel Booms: The Similarities and Contrasts

    Between 1966 and 1976, Australia moved from being a non-producer to a position of meeting more than ten per cent of world nickel demand. New mine developments beginning the early-1990s have the prom

    Jan 1, 1996

  • AUSIMM
    The Development of a Fan Range to Meet Increasingly Demanding Safety Criteria Inside Tunnels

    By A G. Sheard

    Fire safety requirements inside tunnels have become more demanding as tunnel designers consider the impact of potentially larger fires. Tunnel ventilation equipment is required to clear hot gases in t

    Mar 8, 2011

  • AUSIMM
    On-Belt Analysis at Sepon Copper Operation

    By T Arena

    To maintain copper recoveries and maximise production at the Sepon Copper Operation it is crucial to control the amount of copper entering the leaching circuit. This requires close control of blending

    Aug 8, 2011

  • AUSIMM
    Project Development and Regulation Red Tape – A Comparative Analysis: Does It Need to Be So Complex?

    By C Pope, M Tannock

    Mining exploration and development projects in Australia are being negatively affected by the highly complex regulatory and bureaucratic processes at all levels of government. These processes affect m

    Jul 13, 2015

  • AUSIMM
    Potential TWA changes for gas monitoring instruments are alarming

    By P Aspinall

    Safe work Australia (SWA) has a number of proposed amendments to existing Workplace Exposure Standard (WES) values that may dramatically change how mining workplaces using personal gas monitoring inst

    Apr 16, 2024

  • AUSIMM
    Coal Seam Modelling and Mine Planning Using Results of a 3D Seismic Reflection Survey û An Example from Huntly Coalfield, New Zealand

    Geological hazards such as faulting, basement ridges, and zones of "thin" (

    Jan 1, 1998

  • AUSIMM
    Project Evaluation and Valuation – An Investor’s Golden Rule

    By L I. Rozman

    "There have always been development projects that fall short of expectations. In the last decade, we have seen more than the usual number of mining and oil/gas development projects taking significantl

    Mar 8, 2016

  • AUSIMM
    Acid Rock Drainage Prediction and Waste Rock Segregation Plan for Ankerite-Containing Mine Waste ù Restigouche Mine Case Study

    By R Carreau

    The results of a detailed acid rock drainage (ARD) prediction program were used to revise the waste rock segregation criteria at the Restigouche open pit mine. Waste rock at the site was predominately

    Jan 1, 2003

  • AUSIMM
    Chemistry of Flotation

    Since its commercial in Australia at Broken Hill in the early part of the 20th century, the flotation process has grown to become the single most important minerals separation method available to

    Jan 1, 1984

  • AUSIMM
    Embracing Modern Ecological Methods - Monitoring and Modelling for Mine Closure, not Compliance

    By A M. Lechner, S Arnold, M J. Gillespie, P D. Erskine, D R. Mulligan, A T. Fletcher, A Gordon

    Mine ecological monitoring schemes are often conducted only to address compliance and in some cases do not have the sufficient statistical power or understanding of ecological systems to assess, quant

    Jul 10, 2012

  • AUSIMM
    Ventilation Challenges Facing the Metalliferous Sector

    By D J. Brake

    The underground metalliferous mining industry continues to change under the influence of many factors including, to name a few, new mining techniques and equipment, new approaches to risk management,

    Jul 1, 2013

  • AUSIMM
    Oxygen Demand Testing ù A New Laboratory Procedure

    By S Brown

    With oxygen conditioning routinely used in both the lead and zinc circuits at Pasminco Elura Mine a more sophisticated method of determining oxygen demand was required. It is known that different ore

    Jan 1, 2000

  • AUSIMM
    Flotation Process Diagnostics and Modelling by Coal Grain Analysis

    By B Firth, G OÆBrien, B Jenkins

    In coal flotation, particles of different components of the coal such as maceral groups and mineral matter and their associations have different hydrophobicities and therefore different flotation resp

    Jan 1, 2005

  • AUSIMM
    Advanced Ventilation Control – An Analysis of Innovation and Environmental Sustainability

    By V S. Mutton, M J. Shearer

    "The current economic challenges faced by the mining industry led to a review of options for reducing the cost of ventilation control devices (VCDs). The VCDs at the Mount Isa Mines site operated by G

    Aug 31, 2015

  • AUSIMM
    Paper No. 186. The Electrolytic Refining of Auriferous And Argentiferous Copper at Lithgow, in New South Wales.

    FOR some reason there is not any extensive literature in print on the electrolytic refining of copper, although the method is in general use in America and Europe. In Australia there are but three pla

    Jan 1, 1911

  • AUSIMM
    Recovery of the northern mining block at Cliffs Nickel Mine

    By M Hopkins, A Mutale, A E. Vidal da Silva

    The Cliffs Nickel Mine extracts a narrow near vertical nickel vein using a mining method of underhand bench stoping with paste backfill. In 2014, at a depth of 400 m below surface, the Northern block

    Mar 15, 2021

  • AUSIMM
    Uncertainty - An Important Source of (Additional) Value for Mine Projects

    By S Watson, L Martinez

    Mine projects are complex opportunities that demand a constant assessment of uncertainty, ie risk and upside potential. This is because the value of a mine project is typically influenced by many unde

    May 24, 2012