Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Strata Mechanics of Pillar Extraction Goaf Edges

    By Chaturvedula V. K

    Pillar extraction carried out using various methods (split and lift, Wongawilli and Old Ben) involves the formation of narrow fenders (commonly 7 m of coal) formed by driving "splits" for lifting

    Jan 1, 1992

  • AUSIMM
    Moving mORE for Less

    By G Brudek, P Elestedt

    Schalker Eisenhütte und Maschinenfabrik GmbH, Nordic Minesteel Technologies and Bombardier Transportation have developed an evaluation tool that considers the main cost drivers of the rail, truck

    May 9, 2016

  • AUSIMM
    Bauxite Residues ù A High Volume Resource

    By E Jamieson

    For a number of years, Alcoa World Alumina Australia (Alcoa) has been investigating opportunities to produce economically viable products from bauxite residues. Three of these potential products are d

    Jan 1, 2004

  • AUSIMM
    Removal of Phosphorous from Australian Iron Ores

    By C I. Edwards

    Phosphorous is typically present in iron ore either in the mineral apatite, Ca5(PO4)3OH, or associated with the goethitic fraction of the ore. In this paper, we present results that show that phosphor

    Jul 11, 2011

  • AUSIMM
    The Evolution of Stope Backfill at Olympic Dam Operations

    Backfil ling of excavated Sub Level Open Stopes has been underway since March 1989 and as at December 1992 some 1 100 000 cubic metres of Cemented Aggregate Fill have been placed. During these three y

    Jan 1, 1993

  • AUSIMM
    Determination of Iron Ore and Gangue Mineral Associations Using Optical and Backscattered Electron Images with Electron Probe Microanalysis

    By S Hapugoda

    Iron ore oxide and oxyhydroxide minerals such as haematite (eg various types of martite and microplaty haematite), different forms of goethite, magnetite, hydrohaematite and kenomagnetite were analyse

    Jul 11, 2011

  • AUSIMM
    Design and testing of high capacity surface support

    By T Roberts, S Talu

    Steel wire weld mesh is a common industry standard surface support used in underground mining, traditionally installed with mining drills during the bolting cycle. As underground mining depth and stre

    Nov 30, 2018

  • AUSIMM
    Kicking the Bucket - A Case Study of Evolving Domains and Geological Modelling, Sunrise Dam Gold Mine, Western Australia

    By F Clark, B Catto

    The Mako domain comprises the Mako lodes at Sunrise Dam Gold Mine, Western Australia. This domain was initially bulk or æbucketÆ domained for the open pit resource in 2000, due to complexity in defini

    Jan 1, 2009

  • AUSIMM
    Geometallurgy applied to small-scale mining: a case study

    By D Lozada, A Salazar

    Geometallurgy is a tool that, for more than a century, has been present in the implicit operations of mineral beneficiation. There’s a need to understand the characteristics of the material to be proc

    Aug 29, 2018

  • AUSIMM
    Telfer Commences Underground Mining - A Case Study

    Newmont Australia Limited has for some 15 years mined a number of large open cuts associated with the Telfer Gold Dome deposits. The principal ore body exploited has been the East Flank of the Main

    Jan 1, 1991

  • AUSIMM
    The Effect of Weak Acid Dissociable Cyanide on Gold and Silver Flotation in Hidden Valley Mine

    By Y Peng, B Guo

    In gold processing plants, the water from the cyanidation stages is treated to detoxify cyanide species and this recycle water becomes the main part of the process water. Despite the low concentration

    Sep 26, 2013

  • AUSIMM
    Oversize Reduction Project at the Iron Ore Company of Canada

    By R Pinksen

    The Iron Ore Company (IOC) of Canada Mining and Operations Departments expressed an interest in reducing the amount of oversize material (>1 m × 1 m × 1 m) being produced and its subseque

    Jul 11, 2011

  • AUSIMM
    Building Safe, Productive Cultures and Leadership

    By M I. Roberts

    Corporate and workplace culture, as many owners, directors, executives and managers know, is by far the most powerful determinant of productivity. It’s much more significant than buildings and equipme

    Jun 22, 2016

  • AUSIMM
    High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, Philippines

    By C Harrison, A Bowskill

    The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to

    Sep 17, 2014

  • AUSIMM
    Utilising Mineralised Mining Waste – Contributions to the Circular Economy

    By É Lèbre, G Corder

    The circular economy concept, as defined by the Ellen MacArthur Foundation (2015) and quoted by the recent International Council on Mining and Metals (ICMM) Guide to Responsible Sourcing, calls for sh

    Jun 28, 2016

  • AUSIMM
    Integration of the Beneficiation Process into Iron Ore Resource Utilisation

    This paper describes the technical development of the Newman beneficiation plant over its 23 years of operation and how this development relates to the mine ore reserves of high-grade and low-grade or

    Jan 1, 2002

  • AUSIMM
    Developing a TSF design concept – experience helps but numbers don’t lie

    By L D. Munro, S A. Jackson

    This paper provides a logical approach to developing a TSF design concept through: • Identifying key properties of tailings and containment structures; • Reviewing underlying principles for effective

    Jul 1, 2021

  • AUSIMM
    The Effect of Process Variables on Electrowinningt Cadmium and Silver

    By Watson K, Pollard D. M

    The electrolytic recovery of metals from solution requires an understanding of the characteristics of the particular system employed, and the current efficiency and morphology of the deposit are in

    Jan 1, 1989

  • AUSIMM
    MMG Century Mine, A Case Study – Maximising Project Net Present Value Through Targeted Capital Expenditure and Process Optimisation Against a Backdrop of Falling Metal Prices and Feed Grades

    By R Wynn, T J. Akroyd, C Costa

    In an environment of lower zinc prices, falling revenues and reducing zinc feed grades, Century mine implemented a fast-tracked capital upgrade program in less than 15 months. The program was designed

    Sep 1, 2014

  • AUSIMM
    Management' as Presented to Engineering Students

    Currently all engineering schools face a common problem, an ever expanding technological base which must be presented to students within a fixed time period. Traditionally the programmes of study

    Jan 1, 1980